|
 |
 |
 |
 |
 |
Plan Review Details - Permit 22011024
| Plan Review Stops For Permit 22011024 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-11-14 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-11-14 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-11-14 |
Time |
13:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2022-02-15 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-02-15 |
Time |
18:26 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-02-10 |
Time |
22:26 |
Sent To |
|
|
| Notes |
| 2022-02-15 18:26:06 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1. VALUE LOW FOR AMOUNT OF WORK SHOWN. FBC 109.3 | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | | PREVIOUSLY REVIEWED SHEETS. | | | CODES IN EFFECT: | | | | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | | UILDING-PERMIT-FORMS | | | | | | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE 2020 7TH ED. | | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020 | | | 7TH EDITION | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 | | | 7TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION | | | NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | V/R, | | | | | | FRANK GIAQUINTO III | | | ELECTRICAL INSPECTOR | | | ELECTRICAL PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | [email protected] | | | CELL: 561-805-6744 | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2022-06-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-06-14 |
Time |
15:34 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-06-14 |
Time |
15:34 |
Sent To |
|
|
| Notes |
| 2022-06-14 15:35:03 | PROVISO - OBTAIN ENGINEERING RIGHT OF WAY PERMIT IF | | | REQUIRED | | | | | | HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING- | | | FORMS-PERMITS-AND-APPLICATIONS |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-01-27 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-01-27 |
Time |
09:18 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-10-25 |
Time |
06:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-06-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-06-14 |
Time |
15:35 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-01-27 |
Time |
06:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-11-14 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-11-14 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-06-14 |
Time |
|
Rev Time |
|
| Received By |
|
Date |
2022-06-14 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2023-01-26 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-01-26 |
Time |
11:03 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-01-26 |
Time |
11:03 |
Sent To |
|
|
| Notes |
| 2023-01-26 11:03:10 | 1. THE SUBMITTED COMMUNICATION FACILITY PLACEMENT | | | PERMIT - CITY RIGHTS-OF-WAY (19021034) MUST BE APPROVED | | | PRIOR TO THIS PERMIT BEING APPROVED. THE PLANS INCLUDED | | | WITH THIS ELECTRICAL PERMIT MUST MATCH THE PLANS | | | APPROVED WITH THE AFOREMENTIONED PERMIT. | | | | | | 2. THE SUBMITTED PLANS SHOW THE UNDERGROUND ELECTRIC | | | BEING SUPPLIED FROM AN FPL POLE/TRANSFORMER THAT IS | | | LOCATED ON PRIVATE PROPERTY ON THE EAST SIDE OF S. | | | DIXIE HIGHWAY. THE SURVEY NEEDS TO SHOW THAT THE AREA | | | WHERE YOU PLAN TO PULL POWER FROM ACROSS PRIVATE | | | PROPERTY IS LOCATED WITHIN A UTILITY EASEMENT. IF NO | | | EASEMENT IS PRESENT, YOU WILL NEED TO GET THE POWER | | | FROM AN ALTERNATIVE LOCATION. | | | | | | 12/7/22 REVIEW OF PERMIT 19021034: | | | 1. REPEAT COMMENT: THE SUBMITTED PLANS SHOW THE | | | UNDERGROUND ELECTRIC BEING SUPPLIED FROM AN FPL | | | POLE/TRANSFORMER THAT IS LOCATED ON PRIVATE PROPERTY ON | | | THE EAST SIDE OF S. DIXIE HIGHWAY. THE SURVEY NEEDS TO | | | SHOW THAT THE AREA WHERE YOU PLAN TO PULL POWER FROM | | | ACROSS PRIVATE PROPERTY IS LOCATED WITHIN A UTILITY | | | EASEMENT. IF NO EASEMENT IS PRESENT, YOU WILL NEED TO | | | GET THE POWER FROM AN ALTERNATIVE LOCATION. | | | 2. PROPOSED WCF POLE LOCATION, STEALTH DESIGN, COLOR, | | | AND DETAILS MEET CITY ZONING STANDARDS. | | | | | | CHRIS KIMMERLY, AICP | | | URBAN DESIGN PLANNER | | | [email protected] 822-1426 | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-02-04 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2022-02-04 |
Time |
11:36 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2022-02-04 |
Time |
11:32 |
Sent To |
|
|
| Notes |
| 2022-02-04 11:36:35 | | | | 1. THE SUBMITTED COMMUNICATION FACILITY PLACEMENT | | | PERMIT - CITY RIGHTS-OF-WAY MUST BE APPROVED PRIOR TO | | | THIS PERMIT BEING APPROVED. THE PLANS INCLUDED WITH | | | THIS ELECTRICAL PERMIT MUST MATCH THE PLANS APPROVED | | | WITH THE AFOREMENTIONED PERMIT. | | | | | | 2. THE SUBMITTED PLANS SHOW THE UNDERGROUND ELECTRIC | | | BEING SUPPLIED FROM AN FPL POLE/TRANSFORMER THAT IS | | | LOCATED ON PRIVATE PROPERTY ON THE EAST SIDE OF S. | | | DIXIE HIGHWAY. THE SURVEY NEEDS TO SHOW THAT THE AREA | | | WHERE YOU PLAN TO PULL POWER FROM ACROSS PRIVATE | | | PROPERTY IS LOCATED WITHIN A UTILITY EASEMENT. IF NO | | | EASEMENT IS PRESENT, YOU WILL NEED TO GET THE POWER | | | FROM AN ALTERNATIVE LOCATION. | | | | | | 3. ANTENNA POLE COLOR SHALL BE ANALOGOUS TO THE | | | EXISTING DECORATIVE CITY STREET LAMPS ALONG S. DIXIE | | | HIGHWAY. | | | | | | 4. PROVIDE ADDITIONAL DETAILS ENSURING THAT THE POLE | | | GROUNDING FOR THE PROPOSED LOCATION DOES NOT CONFLICT | | | WITH PLANTING BEDS, STRUCTURAL SOIL, OR STREET LIGHTS. | | | | | | 5. THE POLE STEALTH DESIGN MEETS CITY STANDARDS. | | | | | | | | | CHRIS KIMMERLY @ (561)822-1426 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |