Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-02-18 Cont ID  
Sent By rmcdouga Date 2022-02-18 Time 17:08 Rev Time 0.00
Received By rmcdouga Date 2022-02-18 Time 17:08 Sent To  
Notes
2022-02-18 17:12:29POOL BARRIERS SHALL BE IN PLACE PRIOR TO FILLING THE
 POOL WITH WATER. FBC-R 4501.19

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-02-03 Cont ID  
Sent By ppetty Date 2022-02-03 Time 09:36 Rev Time 0.00
Received By ppetty Date 2022-02-03 Time 09:36 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2022-01-24 Cont ID  
Sent By lcrespo Date 2022-01-24 Time 07:49 Rev Time 0.00
Received By lcrespo Date 2022-01-24 Time 07:49 Sent To  
Notes
2022-01-24 07:49:30GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT
 BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND
 PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTO THE FBC
 SEC. 105.1.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-05-13 Cont ID  
Sent By jleahy Date 2022-05-13 Time 13:35 Rev Time 0.00
Received By jleahy Date 2022-05-09 Time 14:34 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-03-22 Cont ID  
Sent By vbroglia Date 2022-03-22 Time 12:52 Rev Time 0.00
Received By vbroglia Date 2022-01-21 Time 10:04 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-01-24 Cont ID  
Sent By lcrespo Date 2022-01-24 Time 07:48 Rev Time 0.00
Received By lcrespo Date 2022-01-24 Time 07:48 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-05-13 Cont ID  
Sent By jleahy Date 2022-05-13 Time 13:34 Rev Time 0.00
Received By jleahy Date 2022-05-13 Time 13:33 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-02-18 Cont ID  
Sent By rmcdouga Date 2022-02-18 Time 17:08 Rev Time 0.00
Received By rmcdouga Date 2022-02-18 Time 17:08 Sent To  
Notes
2022-03-29 09:33:42THE PLANS HAVE NOT BEEN DIGITALLY SIGNED BY THE
 ENGINEER. ELECTRONICALLY SUBMITTED DRAWINGS ARE
 REQUIRED TO HAVE THE ARCHITECT OR ENGINEER'S DIGITAL
 SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT
 THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER
 THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT
 THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING
 DEPARTMENT TO BE VERIFIED. THE ARCHITECT OR ENGINEER'S
 ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO
 BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF
 THE SIGNATURE ARE ACCEPTABLE. FS 481 & FAC 61G1 OR FS
 471 & FAC 61G15

Review Stop Z ZONING
Rev No 1 Status P Date 2022-03-22 Cont ID  
Sent By ahamilto Date 2022-03-22 Time 12:52 Rev Time 0.00
Received By vbroglia Date 2022-03-22 Time 12:52 Sent To  
Notes
***NONE***