Plan Review Details - Permit 22010760
| Plan Review Stops For Permit 22010760 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2022-02-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-02-18 |
Time |
17:08 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-02-18 |
Time |
17:08 |
Sent To |
|
|
| Notes |
| 2022-02-18 17:12:29 | POOL BARRIERS SHALL BE IN PLACE PRIOR TO FILLING THE | | | POOL WITH WATER. FBC-R 4501.19 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-02-03 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2022-02-03 |
Time |
09:36 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2022-02-03 |
Time |
09:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2022-01-24 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-01-24 |
Time |
07:49 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2022-01-24 |
Time |
07:49 |
Sent To |
|
|
| Notes |
| 2022-01-24 07:49:30 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | | THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT | | | BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND | | | PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENTO THE FBC | | | SEC. 105.1. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-05-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-05-13 |
Time |
13:35 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-05-09 |
Time |
14:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-03-22 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-03-22 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-01-21 |
Time |
10:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-01-24 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-01-24 |
Time |
07:48 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2022-01-24 |
Time |
07:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-05-13 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-05-13 |
Time |
13:34 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-05-13 |
Time |
13:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-02-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-02-18 |
Time |
17:08 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-02-18 |
Time |
17:08 |
Sent To |
|
|
| Notes |
| 2022-03-29 09:33:42 | THE PLANS HAVE NOT BEEN DIGITALLY SIGNED BY THE | | | ENGINEER. ELECTRONICALLY SUBMITTED DRAWINGS ARE | | | REQUIRED TO HAVE THE ARCHITECT OR ENGINEER'S DIGITAL | | | SIGNATURE ON THEM. YOU ALSO HAVE THE OPTION TO SUBMIT | | | THE SIGNED AND SEALED PAPER VERSION OF DRAWINGS. AFTER | | | THE ELECTRONIC PLANS HAVE BEEN APPROVED, YOU CAN SUBMIT | | | THE CORRESPONDING PAPER DRAWINGS AT THE BUILDING | | | DEPARTMENT TO BE VERIFIED. THE ARCHITECT OR ENGINEER'S | | | ORIGINAL HANDWRITTEN SIGNATURE AND SEAL IS REQUIRED TO | | | BE ON THE DRAWINGS. NO PHOTOCOPY OR OTHER FACSIMILES OF | | | THE SIGNATURE ARE ACCEPTABLE. FS 481 & FAC 61G1 OR FS | | | 471 & FAC 61G15 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2022-03-22 |
|
|
Cont ID |
|
| Sent By |
ahamilto |
Date |
2022-03-22 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-03-22 |
Time |
12:52 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |