Plan Review Details - Permit 22010517
Plan Review Stops For Permit 22010517
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2022-02-03 Cont ID  
Sent By lcrespo Date 2022-02-03 Time 16:44 Rev Time 0.00
Received By lcrespo Date 2022-02-03 Time 16:44 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2022-01-31 Cont ID  
Sent By lcrespo Date 2022-01-31 Time 06:20 Rev Time 0.00
Received By lcrespo Date 2022-01-31 Time 06:20 Sent To  
Notes
2022-01-31 06:51:1701/31/21 1ST LP GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE CITY OF WEST PALM BEACH HAS NO RECORD OF
 EXISTING GAS PERMITS WITH INSPECTIONS OF THE CURRENT
 SYSTEM. A SEARCH ON CITY RECORDS BACK TO 1998 HAS BEEN
 DONE AND THERE IS NO RECORD OF A PERMIT FOR INSTALLING
 AN LP TANK. A COMPLETE EVALUATION OF ALL GAS SYSTEMS
 AND EQUIPMENT WILL BE DONE ON A SEPARATE PERMIT, AND IF
 NOT TO CODE, IT MAY NEED TO BE BOUT UP TO CODE
 COMPLIANCE AT THE OWNER?S EXPENSE. WHAT OTHER
 APPLIANCES/EQUIPMENT IS SUPPLIED BY THIS "EXISTING"
 TANK? PROVIDE ALL BTU LOADS AND THE TOTAL LOAD ON THE
 SYSTEM. SINCE THERE IS NO RECORD OF A PERMIT FOR THE LP
 TANK, THE TANK MUST BE INCLUDED IN A SEPARATE PERMIT
 FOR THIS SCOPE OF WORK PER THE WPB AMENDMENTS TO THE
 FBC SEC. 105.1.
  
 2. WOULD YOU PLEASE SUBMIT THE MANUFACTURER?S
 SPECIFICATION SHEETS/INSTALLATION MANUAL FOR ALL LP GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH 2020 FBC FG SEC.
 305.1.
  
 3. A LICENSED LP CONTRACTOR REQUIRES A SEPARATE PERMIT
 FOR THE LP TANK PER THE WPB AMENDMENTS TO THE FBC SEC.
 105.1. CFC LICENSE CON NOT TAKE RESPONSIBILITY OR
 INSTALL AN LP TANK.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON
 REQUEST.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-02-03 Cont ID  
Sent By lcrespo Date 2022-02-03 Time 16:44 Rev Time 0.00
Received By lcrespo Date 2022-02-02 Time 07:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-01-31 Cont ID  
Sent By lcrespo Date 2022-01-31 Time 06:20 Rev Time 0.00
Received By lcrespo Date 2022-01-26 Time 06:44 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2022-02-03 Cont ID  
Sent By lcrespo Date 2022-02-03 Time 16:43 Rev Time 0.00
Received By lcrespo Date 2022-02-03 Time 16:43 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2022-01-31 Cont ID  
Sent By lcrespo Date 2022-01-31 Time 06:20 Rev Time 0.00
Received By lcrespo Date 2022-01-31 Time 06:20 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-01-31 Cont ID  
Sent By lcrespo Date 2022-01-31 Time 06:20 Rev Time 0.00
Received By lcrespo Date 2022-01-31 Time 06:20 Sent To  
Notes
***NONE***