Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-01-31 Cont ID  
Sent By pvalenti Date 2022-01-31 Time 09:36 Rev Time 0.00
Received By pvalenti Date 2022-01-31 Time 09:31 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-03-11 Cont ID  
Sent By pvalenti Date 2022-03-11 Time 06:33 Rev Time 0.00
Received By pvalenti Date 2022-03-11 Time 06:33 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-01-31 Cont ID  
Sent By pvalenti Date 2022-01-31 Time 09:58 Rev Time 0.00
Received By pvalenti Date 2022-01-31 Time 09:31 Sent To  
Notes
2022-01-31 09:58:41PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW FAILED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 3. OK, UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT. (WATER TRUCK TO BE USED FOR WATERDOWN
 METHOD).
 4. NOT COMPLETE - SEWER LATERAL CAPPING PERMIT IS
 REQUIRED. (SCHEDULE A FINAL PLUMBING #703).
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-01-24 Cont ID  
Sent By rrossano Date 2022-01-24 Time   Rev Time  
Received By rrossano Date 2022-01-24 Time   Sent To  
Notes
2022-01-24 08:30:10PASSED WITH PROVISOS:
  
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT.- UTILITY SIGNOFFS - WATER/SEWER, ETC.
  
  
 THANKS,
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-02-01 Cont ID  
Sent By amhamilt Date 2022-02-01 Time 16:07 Rev Time 0.00
Received By amhamilt Date 2022-02-01 Time 16:07 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-02-02 Cont ID  
Sent By lmarchan Date 2022-02-02 Time 07:56 Rev Time 0.00
Received By lmarchan Date 2022-01-20 Time 09:17 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-01-31 Cont ID  
Sent By pvalenti Date 2022-01-31 Time 09:48 Rev Time 0.00
Received By pvalenti Date 2022-01-31 Time 09:31 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-02-01 Cont ID  
Sent By amhamilt Date 2022-02-01 Time 16:07 Rev Time 0.00
Received By amhamilt Date 2022-02-01 Time 16:07 Sent To  
Notes
***NONE***