Plan Review Details - Permit 22010259
Plan Review Stops For Permit 22010259
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-02-07 Cont ID  
Sent By cpuell Date 2022-02-07 Time 14:37 Rev Time 0.00
Received By cpuell Date 2022-02-07 Time 14:37 Sent To  
Notes
2022-02-07 14:37:57ADDRESS APPROPRIATE FOR PROJECT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-02-04 Cont ID  
Sent By shill Date 2022-02-04 Time 16:23 Rev Time 0.00
Received By shill Date 2022-02-04 Time 16:23 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-02-23 Cont ID  
Sent By rrossano Date 2022-02-23 Time   Rev Time 0.00
Received By rrossano Date 2022-02-23 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-02-07 Cont ID  
Sent By RROSSANO Date 2022-02-07 Time   Rev Time 0.00
Received By rrossano Date 2022-02-07 Time   Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By aoliver Date 2022-02-18 Time 14:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status F Date 2022-02-17 Cont ID  
Sent By jgomez Date 2022-02-17 Time 14:17 Rev Time 0.00
Received By jgomez Date 2022-02-16 Time 10:46 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-02-14 Cont ID  
Sent By cthroop Date 2022-02-14 Time 14:19 Rev Time 0.00
Received By cthroop Date 2022-02-11 Time 15:10 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-02-07 Cont ID  
Sent By cpuell Date 2022-02-07 Time 14:38 Rev Time 0.00
Received By cpuell Date 2022-02-04 Time 17:11 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2022-02-23 Cont ID  
Sent By rwbrown Date 2022-02-23 Time 11:29 Rev Time 0.00
Received By rwbrown Date 2022-02-23 Time 11:29 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-02-22 Cont ID  
Sent By rwbrown Date 2022-02-22 Time 07:01 Rev Time 0.00
Received By rwbrown Date 2022-02-22 Time 07:01 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-02-07 Cont ID  
Sent By rwbrown Date 2022-02-07 Time 08:55 Rev Time 0.00
Received By rwbrown Date 2022-02-07 Time 08:42 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2022-02-22 Cont ID  
Sent By jgomez Date 2022-02-22 Time 16:37 Rev Time 0.00
Received By jgomez Date 2022-02-22 Time 16:34 Sent To  
Notes
2022-02-22 16:40:10HARD COPY DRAWINGS C1.1, C2.1, C2.2, LS-1 AND SURVEY.
 HAVE ENGINEER'S AND SURVEYOR'S ORIGINAL SEAL/SIGNATURE.
 SENT TO STORAGE. JG.
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2022-02-17 Cont ID  
Sent By jgomez Date 2022-02-17 Time 14:00 Rev Time 0.00
Received By jgomez Date 2022-02-17 Time 13:29 Sent To  
Notes
2022-02-17 14:01:073RD SIGNATURE REVIEW (HARD COPY DRAWINGS):
  
 1- ADDITIONAL DRAWINGS WERE SUBMITTED: DRAWING LS-1 AND
 SKETCH OF SPECIFIC PURPOSE SURVEY. THESE DRAWINGS WERE
 NOT UPLOADED TO PROJECTDOX IN THE DRAWINGS FOLDER.
 THESE DRAWINGS NEED TO BE UPLOADED TO PROJECTDOX FOR
 REVIEW.
  
 2- HARD COPY DRAWING LS-1 DOESN'T HAVE THE ENGINEER'S
 ORIGINAL SEAL/SIGNATURE AS REQUIRED BY CHAPTER 471 F.S.
 WHEN SUBMITTING DRAWINGS/DOCUMENTS FOR PUBLIC RECORDS.
  
 3- HARD COPY OF SKETCH OF SPECIFIC PURPOSE SURVEY
 DOESN'T HAVE THE SURVEYOR'S ORIGINAL SEAL/SIGNATURE AS
 REQUIRED BY CHAPTER 472 F.S. WHEN SUBMITTING
 DRAWINGS/DOCUMENTS FOR PUBLIC RECORDS.
  
 NOTE: SUBMIT DRAWINGS ELECTRONICALLY WITH
 ENGINEER'S/SURVEYOR'S DIGITAL SIGNATURE OR PROVIDE HARD
 COPY PLANS WITH ORIGINAL SEAL AND SIGNATURE.
  
 APPROVED DRAWINGS: HARD COPY DRAWINGS C1.1, C2.1 AND
 C2.2 HAVE ENGINEER'S WET SIGNATURE.
  
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-02-14 Cont ID  
Sent By cthroop Date 2022-02-14 Time 14:18 Rev Time 0.00
Received By cthroop Date 2022-02-14 Time 14:10 Sent To  
Notes
2022-02-14 14:19:46SIGNATURE REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 CFM
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NEC2017
  
 2ND REVIEW
 RESULTS: DENIED
  
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 RE: COMMENTS FROM 1ST REVIEW HAVE NOT BEEN ADDRESSED.
  
 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND
 SUBMITTED FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED,
 DATED ORIGINALS. A SCAN OF A WET SEAL AND SIGNATURE OR
 DIGITAL SIGNATURE IS NOT CONSIDERED A DIGITAL
 SIGNATURE.
  
 2. EITHER UPLOAD A VALID DIGITALLY SIGNED DOCUMENT OR
 DROP OFF (OR MAIL) ONE PAPER ORIGINAL WITH AN ORIGINAL
 WET SEAL AND SIGNATURE TO:
  
 BUILDING DIVISION, FIRST FLOOR
 CITY OF WEST PALM BEACH
 401 CLEMATIS ST
 WEST PALM BEACH, FL 33401
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-02-07 Cont ID  
Sent By rwbrown Date 2022-02-07 Time 09:01 Rev Time 0.00
Received By rwbrown Date 2022-02-07 Time 09:01 Sent To  
Notes
2022-02-07 09:03:41FS 471/481 -- DRAWING SUBMITTED ARE COPIES OF WET SEAL.
 PLEASE PROVIDE DIGITAL SIGNATURES WITH UPLOAD OR BRING
 ORIGINAL WET SEALS TO THE OFFICE TO BE UPLOADED. -- RWB
  
 RYAN W. BROWN
 CHIEF PLUMBING INSPECTOR
 OFFICE: 561-805-6692
 CELL: 561-517-4293
 EMAIL: [email protected]
  

Review Stop Z ZONING
Rev No 1 Status N Date 2022-02-04 Cont ID  
Sent By eschneid Date 2022-02-04 Time 17:06 Rev Time 0.00
Received By eschneid Date 2022-02-04 Time 17:06 Sent To  
Notes
***NONE***