|
 |
 |
 |
 |
 |
Plan Review Details - Permit 22010045
| Plan Review Stops For Permit 22010045 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2022-03-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-03-21 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-03-21 |
Time |
15:28 |
Sent To |
|
|
| Notes |
| 2022-03-21 15:58:57 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW APPROVED WITH PROVISO: | | | | | | PRIOR TO ANY ROOF WORK A ROOFING SUB-PERMIT IS | | | REQUIRED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-03-10 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-03-10 |
Time |
09:19 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-03-10 |
Time |
09:19 |
Sent To |
|
|
| Notes |
| 2022-03-10 09:25:59 | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | [email protected] | | | 561 805 6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC R = FBC RESIDENTIAL | | | FBC EB = EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC M = FBC MECHANICAL | | | FBC FG = FBC FUEL GAS | | | | | | BUILDING REVIEW DENIED: | | | | | | 1.) FBC B 107.2.1, PROVIDE THE SIGNED/SEALED WINDLOAD | | | DESIGN PRESSURES WITH FASTENER SPACING CALCULATIONS FOR | | | THE ROOFING SYSTEM. | | | 2.) WPB AMENDMENTS OF FBC B 107.2.1, THE "A" SHEETS | | | NEED TO BE SIGNED BY THE INDIVIDUAL WHO DESIGNED THEM | | | FROM R&R CONSTRUCTION. | | | 3.) A ROOFING SUB-PERMIT IS REQUIRED FOR ROOFING WORK. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-03-25 |
Time |
15:22 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-03-20 |
Time |
08:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-03-10 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-03-10 |
Time |
09:29 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-01-10 |
Time |
07:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-03-21 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-03-21 |
Time |
16:03 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-03-21 |
Time |
16:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-03-10 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-03-10 |
Time |
09:27 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-03-10 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2022-03-10 09:29:05 | SIGNATURE REVIEW DENIED: | | | | | | THE PLANS SIGNED & SEALED BY (GARY MCDOUGAL P.E.) ARE | | | NOT 3RD PARTY VERIFIED. | | | | | | FS 471/FS 481 DOCUMENTS PREPARED BY AN | | | ENGINEER/ARCHITECT AND SUBMITTED FOR PUBLIC RECORD ARE | | | TO BE SIGNED, SEALED & DATED ORIGINALS. A SCAN OF A | | | SIGNED/SEALED PLAN IS NOT CONSIDERED AN ORIGINAL. | | | UPLOAD OR EMAIL A DIGITALLY SIGNED (THIRD PARTY | | | VERIFIED) PLAN OR YOU CAN DELIVER AN ORIGINAL | | | SIGNED/SEALED PAPER ORIGINAL TO: | | | | | | PETER E VALENTI | | | BUILDING PLANS EXAMINER II | | | BUILDING DIVISION | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS STREET, 1ST FLOOR | | | WEST PALM BEACH, FL 33401 | | | FEEL FREE TO CONTACT ME AT 561 805 6673. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-03-25 |
Time |
15:22 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-03-25 |
Time |
15:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-01-14 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-01-14 |
Time |
16:04 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-01-14 |
Time |
16:04 |
Sent To |
|
|
| Notes |
| 2022-01-14 16:05:05 | 1/14/2022- FAILED | | | | | | PROPOSED CAR PORT IS CONSIDERED AN ACCESSORY STRUCTURE, | | | PER CODE SECTION 94-304 (B)(2) AN ACCESSORY STRUCTURE | | | MAY NOT BE WITHIN THE FIRST 25 FEET FROM THE FRONT | | | PROPERTY LINE | | | | | | PLEASE LIST SETBACKS FROM FRONT PROPERTY LINE | | | | | | VALENTINA BROGLIA | | | ASSOCIATE PLANNER | | | [email protected] | | | | | | | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |