| Plan Review Stops For Permit 21120892 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2022-02-14 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-02-14 |
Time |
10:41 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-02-14 |
Time |
10:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-01-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-01-13 |
Time |
13:44 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-01-13 |
Time |
11:56 |
Sent To |
|
|
| Notes |
| 2022-01-13 13:48:26 | ANTENNA | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWING T-1 SHOWS WIND DESIGN AS CATEGORY II 160MPH | | | - CATEGORY II MINIMUM WIND SPEED SHOULD BE 170MPH PER | | | FBC WPB SECTION 120 | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-02-16 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-02-16 |
Time |
23:08 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-02-16 |
Time |
20:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-01-20 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-01-20 |
Time |
23:11 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-01-20 |
Time |
21:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2022-02-04 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2022-02-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2021-12-22 |
|
|
Cont ID |
|
| Sent By |
cwalker |
Date |
2021-12-22 |
Time |
|
Rev Time |
|
| Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-02-16 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-02-16 |
Time |
23:08 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-02-02 |
Time |
06:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-01-20 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-01-20 |
Time |
23:11 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2021-12-20 |
Time |
09:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-02-14 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-02-14 |
Time |
10:41 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-02-14 |
Time |
10:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-01-13 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-01-13 |
Time |
13:52 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-01-13 |
Time |
13:52 |
Sent To |
|
|
| Notes |
| 2022-01-13 13:54:26 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) ALL OF THE DRAWINGS DO NOT SHOW AS DIGITALLY SIGNED | | | IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-02-15 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2022-02-17 |
Time |
12:15 |
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2022-02-17 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-02-17 11:56:46 | ZONING PASSED. CONFIRMED WITH CITY'S WIRELESS | | | CONSULTANT (ELIZABETH HARINGTON-SMITH OF CITYSCAPE) ON | | | 2/17/2022 THAT A NEW WCF APPLICATION IS NOT REQUIRED | | | WITH THE ANTENNA CHANGES FROM THE APPROVED PLANS | | | (REFERENCE: WCF #21-22). | | 2022-02-15 12:15:42 | * CHANGES DETECTED FROM THE APPROVED PLANS (REFERENCE: | | | WCF 21-22). CONTACTED CITYSCAPE ON 2/10/2022 TO | | | DETERMINE IF NEW WCF REVIEW IS REQUIRED THROUGH THE | | | PLANNING DIVISION PRIOR TO PERMITTING. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-12-30 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2021-12-30 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
2021-12-30 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-12-30 10:44:15 | REFERENCE: WCF #21-22. |
|
|