Plan Review Details - Permit 21120625
Plan Review Stops For Permit 21120625
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2022-03-24 Cont ID  
Sent By cpuell Date 2022-03-24 Time 12:56 Rev Time 0.00
Received By cpuell Date 2022-03-24 Time 12:56 Sent To  
Notes
2022-03-24 12:57:12REPLAT OF PARCEL WILL BE DONE BEFORE CO, ADDRESS OF 208
 N TAMARIND AVE GIVEN TO PARK, UPDATED PERMIT. THIS WAS
 ON DIRECTION OF RBROWN.

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2022-01-11 Cont ID  
Sent By cpuell Date 2022-01-11 Time 14:21 Rev Time 0.00
Received By cpuell Date 2022-01-11 Time 14:21 Sent To  
Notes
2022-01-11 14:24:11UNCLEAR IF MULTIPLE PCNS ARE EFFECTED, PLEASE CONTACT
 [email protected] OR CALL 561-805-6659 TO CONFIRM THE AREA
 OF WORK. PCNS EFFECTS APPEAR TO BE 74434321010270061
 AND 74434321010270042, ACTIONS WILL BE REQUIRED IF
 MULTIPLE PARCELS EFFECTED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-03-14 Cont ID  
Sent By rmcphers Date 2022-03-14 Time 11:37 Rev Time 0.00
Received By rmcphers Date 2022-03-14 Time 11:37 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-01-20 Cont ID  
Sent By rmcphers Date 2022-01-20 Time 16:07 Rev Time 0.00
Received By rmcphers Date 2022-01-20 Time 13:44 Sent To  
Notes
2022-01-20 16:07:14LINEAR PARK
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE SHOW THE ACCESSIBLE ROUTE - FROM PARKING LOT
 AND SIDEWALKS TO AND THROUGH THE PARK FBC A 206
  
 2) SITE LIGHTING WILL NEED TO BE A SEPARATE PERMIT -
 WILL NEED TO PROVIDE LIGHT POLE AND LIGHT POLE
 FOUNDATION DETAILS FROM A DESIGN PROFESSIONAL TO COMPLY
 WITH THE WIND LOADS FBC 1609
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-01-24 Cont ID  
Sent By jleahy Date 2022-01-24 Time 15:15 Rev Time 0.00
Received By jleahy Date 2022-01-24 Time 15:10 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2022-03-07 Cont ID  
Sent By rrossano Date 2022-03-07 Time   Rev Time 0.00
Received By rrossano Date 2022-03-07 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-01-13 Cont ID  
Sent By rrossano Date 2022-01-13 Time   Rev Time 0.00
Received By rrossano Date 2022-01-13 Time   Sent To  
Notes
2022-01-13 15:28:45IRRIGATION WATER LINES APPEAR TO BE DIFFERENT SIZE THAN
 APPROVED ENGINEERING PLANS; PLEASE CONFIRM WITH EOR
 CHRIS ROGERS.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-03-04 Cont ID  
Sent By pleduc Date 2022-03-04 Time   Rev Time 0.00
Received By pleduc Date 2022-03-04 Time 10:45 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-12-27 Cont ID  
Sent By   Date 2021-12-27 Time   Rev Time 0.00
Received By jcclark Date 2021-12-27 Time 11:14 Sent To  
Notes
2021-12-27 11:19:58ANY HYDRANTS OR FDC CONNECTION SHALL HAVE 7.5?
 CLEARANCE IN FRONT AND TO THE SIDES (SEMI-CIRCLE) OF
 HYDRANTS, 4.5? BEHIND.
 PER CITY CODES, ALL WORK IS SUBJECT TO FIELD
 INSPECTIONS AND APPROVAL.
 JOSEPH CLARK
 OFFICE OF THE FIRE MARSHAL
 561-804-4748
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-03-14 Cont ID  
Sent By rmcphers Date 2022-03-14 Time 11:39 Rev Time 0.00
Received By rmcphers Date 2022-03-03 Time 15:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-01-24 Cont ID  
Sent By jleahy Date 2022-01-24 Time 15:15 Rev Time 0.00
Received By jleahy Date 2021-12-22 Time 13:29 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-03-14 Cont ID  
Sent By rmcphers Date 2022-03-14 Time 11:39 Rev Time 0.00
Received By rmcphers Date 2022-03-14 Time 11:39 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-01-20 Cont ID  
Sent By rmcphers Date 2022-01-20 Time 16:07 Rev Time 0.00
Received By rmcphers Date 2022-01-20 Time 16:07 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-03-11 Cont ID  
Sent By ckimmerl Date 2022-03-11 Time 10:49 Rev Time 0.00
Received By ckimmerl Date 2022-03-11 Time 10:49 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-01-24 Cont ID  
Sent By aaponte Date 2022-01-24 Time 10:04 Rev Time 0.00
Received By ckimmerl Date 2022-01-24 Time 10:04 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved