| Plan Review Stops For Permit 21120578 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2022-01-05 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2022-01-05 |
Time |
12:07 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2022-01-05 |
Time |
12:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
3 |
Status |
P |
Date |
2023-06-08 |
|
|
Cont ID |
|
| Sent By |
cseifer |
Date |
2023-06-08 |
Time |
15:52 |
Rev Time |
0.00 |
| Received By |
cseifer |
Date |
2023-06-08 |
Time |
15:52 |
Sent To |
|
|
| Notes |
| 2023-06-08 15:52:14 | THE PLANS ARE COMPLIANT WITH CITY STANDARDS. | | | | | | CHLOE SEIFER | | | [email protected] |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2023-03-30 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-03-30 |
Time |
16:02 |
Rev Time |
0.00 |
| Received By |
eschneid |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2023-03-30 15:58:54 | FAILED ON BEHALF OF ENGINEERING SO CORRECT PLANS CAN BE | | | UPLOADED. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2022-06-23 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2022-06-23 |
Time |
17:09 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2022-06-23 |
Time |
17:09 |
Sent To |
|
|
| Notes |
| 2022-06-23 17:09:18 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS. | | | INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE | | | MATERIAL, AND DESCRIPTION ON THE SITE PLAN. CONTACT | | | JANICE TARBILL, [email protected] FOR AS-BUILT | | | INFORMATION. INCLUDE AS-BUILT INFORMATION IN YOUR | | | RESUBMITTAL. | | | 2) PROVIDE PROFILE FOR PROPOSED UNDERGROUND ELECTRIC | | | SHOWING ALL CROSSING DATA FOR OTHER UTILITIES. | | | | | | SUZANNE BERGLUND | | | [email protected] | | | 561-494-1075 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-06-15 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-06-15 |
Time |
06:54 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-06-05 |
Time |
08:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-03-30 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2023-03-30 |
Time |
16:05 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2023-01-23 |
Time |
06:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-06-27 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-06-27 |
Time |
08:34 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-12-13 |
Time |
12:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2021-12-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-12-17 |
Time |
12:56 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-12-17 |
Time |
12:56 |
Sent To |
|
|
| Notes |
| 2021-12-17 12:56:26 | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | COMMUNICATIONS APPLICATIONS - NEW PROCESS EFFECTIVE | | | 12/6/2021 | | | | | | 1. FOR ALL FUTURE SUBMITTALS, PRIOR TO SUBMISSION, | | | CONTACT [email protected] TO OBTAIN THE CORRECT ADDRESS | | | FOR YOUR APPLICATION. SHE WILL ASSIGN AN ADDRESS VIA | | | EMAIL. WHEN YOU SUBMIT THE APPLICATION, INCLUDE THE | | | EMAIL AS AN ATTACHMENT. | | | | | | 2. FOR ALL FUTURE SUBMITTALS, TO SUBMIT THE | | | COMMUNICATIONS APPLICATION, EMAIL THE COMPLETED | | | APPLICATION TO [email protected]. THEY WILL | | | GENERATE YOUR APPLICATION AND SEND YOU INSTRUCTIONS TO | | | UPLOAD YOUR PLANS. | | | | | | 3. FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR | | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | | SIGNED, SEALED, DATED ORIGINALS. IT APPEARS THAT THE | | | DOCUMENTS SUBMITTED PAPER TO THE BUILDING DIVISION WERE | | | DIGITALLY SIGNED PLANS THAT WERE PRINTED. | | | | | | IF THIS APPLICATION FAILS REVIEW - WHEN RESUBMITTING, | | | UPLOAD INDIVIDUALLY SIGNED AND SEALED DRAWINGS IF | | | POSSIBLE. IF YOU CANNOT OBTAIN PLANS IN THAT FORMAT, | | | UPLOAD THE SINGLE MULTIPAGE DIGITALY SIGNED PDF TO THE | | | SIGNATURE FOLDER. | | | | | | IF THIS APPLICATION PASSES REVIEW - UPLOAD THE | | | DIGITALLY SIGNED DOCUMENTS (SHOULD BE IDENTICAL TO THE | | | DOCUMENTS REVIEWED) TO THE SIGNATURE FOLDER. | | | | | | IF THE ENGINEER DOES NOT HAVE A DIGITAL SIGNATURE, | | | PLEASE CONTACT ME DIRECTLY TO DISCUSS OPTIONS. | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-06-14 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-06-08 |
Time |
16:05 |
Rev Time |
0.00 |
| Received By |
eschneid |
Date |
2023-06-08 |
Time |
16:05 |
Sent To |
|
|
| Notes |
| 2023-06-07 18:28:06 | THE POLE STYLE AND HEIGHT MEET CITY REQUIREMENTS. THE | | | POLE COLOR AT THIS LOCATION SHALL BE RAL/RAYCAP 7042 | | | TRAFFIC GREY A. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2023-03-30 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2023-03-30 |
Time |
15:56 |
Rev Time |
0.00 |
| Received By |
eschneid |
Date |
2023-03-30 |
Time |
15:02 |
Sent To |
|
|
| Notes |
| 2023-03-30 15:58:20 | FAILED SO CORRECT PLANS CAN BE UPLOADED. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-01-05 |
|
|
Cont ID |
|
| Sent By |
eshneide |
Date |
2022-01-05 |
Time |
16:09 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2022-01-05 |
Time |
15:28 |
Sent To |
|
|
| Notes |
| 2022-01-05 16:10:15 | FAILED | | | | | | 1) THIS LOCATION IS WITHIN A HISTORIC DISTRICT. PLEASE | | | PROVIDE A COPY OF THE STATE HISTORIC PRESERVATION | | | OFFICE APPROVAL OF THIS LOCATION. | | | | | | 2) THE POLE STYLE AND HEIGHT MEET CITY REQUIREMENTS. | | | THE POLE COLOR IS TO MATCH THE COLOR OF THE DECORATIVE | | | CONCRETE LIGHT POLE ADJACENT TO THE PROPOSED POLE | | | LOCATION. | | | | | | 3) THE PLANS SHOW A GAS LINE AND UNDERGROUND ELECTRIC | | | WITHIN 2 FEET OF THE POLE CAISSON AND THE BORE PIT FOR | | | THE UNDERGROUND ELECTRIC. IN ORDER TO VERIFY THAT THE | | | INSTALLATION WILL NOT INTERFERE WITH THE EXISTING | | | FACILITIES, PROVIDE A PUBLIC UTILITY LETTER OF NO | | | OBJECTION FROM FPU REGARDING THE INSTALLATION. | | | | | | 4) PROVIDE CROSS SECTIONS OF THE LOCATION OF THE | | | UNDERGROUND ELECTRIC FOR THE FULL LENGTH OF THE | | | INSTALLATION. THERE UNDERGROUND ELECTRIC MUST BE | | | CLEARLY SHOWN AVOIDING THE STREET TREE ROOT SYSTEMS AND | | | ANY INFRASTRUCTURE THAT IT CROSSES (EX: THE GAS LINE). | | | | | | 5) THE SURVEY NEEDS TO SHOW THE SAME UNDERGROUND | | | ELECTRIC PATH AS THE POWER ROUTE PLAN. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | |
|
|