Review Stop G GAS REVIEW
Rev No 2 Status P Date 2022-05-09 Cont ID  
Sent By rwbrown Date 2022-05-09 Time 08:41 Rev Time 0.00
Received By rwbrown Date 2022-05-09 Time 08:41 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2021-12-15 Cont ID  
Sent By lcrespo Date 2021-12-15 Time 07:34 Rev Time 0.00
Received By lcrespo Date 2021-12-15 Time 07:34 Sent To  
Notes
2021-12-15 10:11:3412/15/21 1ST LP GAS REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. THE VALUE LISTED ON THE APPLICATION FOR THE LP TANK
 INSTALLATION AND GAS LINES AND IN THE OVERALL VALUE IS
 LOW. IF IN THE OPINION OF THE BUILDING OFFICIAL, THE
 CLAIMED VALUATION OF THE BUILDING, ALTERATION,
 STRUCTURE, ELECTRICAL, GAS, MECHANICAL, OR PLUMBING
 SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED UNLESS THE
 APPLICANT CAN SHOW DETAILED, QUANTITY ESTIMATES, AND/OR
 BONA FIDE SIGNED CONTRACTS (EXCLUDING LAND VALUE) TO
 MEET THE APPROVAL OF THE BUILDING OFFICIAL. FOR
 PERMITTING PURPOSES, THE VALUATION OF BUILDINGS AND
 SYSTEMS SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE
 STRUCTURAL, ELECTRIC, PLUMBING, MECHANICAL, INTERIOR
 FINISH, RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN
 FEES, MARKETING COSTS, OVERHEAD, AND PROFIT; EXCLUDING
 ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE
 LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION COST
 ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS
 PUBLISHED BY INTERNATIONAL CODE CONGRESS. THE FINAL
 BUILDING PERMIT VALUATION SHALL BE SET BY THE BUILDING
 OFFICIAL. WOULD YOU PLEASE PROVIDE AN ITEMIZED COST
 BREAK DOWN OF THE JOB PER THE WPB AMENDMENTS TO THE FBC
 109.3 BUILDING PERMITS VALUATIONS?
  
 2. THE TIE-DOWN IS NOT ACCEPTABLE;
  
 A. IT REFER TO THE FLORIDA BUILDING CODE 6 TH EDITION
 AND WE ARE USING THE 7 TH EDITION.
  
 B. THE ENGINEER WHO PREPARED THE TANK TIE-DOWN DETAILS
 SHALL PROVIDE AN ELECTRONIC SIGNATURE AND SEAL THE
 DOCUMENT- FL. STATUTE 471.025 & FLORIDA ADMINISTRATIVE
 CODE SEC. 61G15-23.005. YOU MAY GO TO TIE DOWN AND
 PURCHASE AN UPDATED AND SEAL DOCUMENT OR VISIT
 HTTPS://WWW.ENGINEERINGEXPRESS.COM/ THEY MAY BE ABLE TO
 PROVIDE THIS DOCUMENT.
  
 C. SIGNED AND SEALED DRAWINGS NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW - OR -
 IF YOUR ENGINEER DOES NOT HAVE AN ELECTRONIC OR DIGITAL
 SIGNATURE - PLEASE DROP OFF THE ORIGINAL SIGNED AND
 SEALED DOCUMENT ALONG WITH A "PLAN REVIEW REQUEST FORM"
 EXPLAINING THE REASON FOR SUBMITTING THE DOCUMENT OR
 DRAWINGS. THE PLAN REVIEW REQUEST FORM CAN BE OBTAINED
 BY EMAILING [email protected] AND ASKING FOR THE FORM.
  
 3. WOULD YOU PLEASE SUBMIT MANUFACTURER?S SPECIFICATION
 SHEETS/INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH 2020 FBC FG SEC. 305.1.
  
 4. A SEPARATE PERMIT REQUIRED FOR GENERATOR PER THE WPB
 AMENDMENTS TO THE FBC SEC. 105.1.
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 WEST PALM BEACH AMENDMENTS 2017 FBC CHAPTER; UPON
 REQUEST.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-05-17 Cont ID  
Sent By jleahy Date 2022-05-17 Time 16:53 Rev Time 0.00
Received By jleahy Date 2022-05-05 Time 16:52 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-05-10 Cont ID  
Sent By vbroglia Date 2022-05-10 Time 16:10 Rev Time 0.00
Received By vbroglia Date 2022-05-05 Time 07:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-12-15 Cont ID  
Sent By lcrespo Date 2021-12-15 Time 07:36 Rev Time 0.00
Received By lcrespo Date 2021-12-10 Time 05:51 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2022-05-09 Cont ID  
Sent By rwbrown Date 2022-05-09 Time 08:43 Rev Time 0.00
Received By rwbrown Date 2022-05-09 Time 08:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2021-12-15 Cont ID  
Sent By lcrespo Date 2021-12-15 Time 07:36 Rev Time 0.00
Received By lcrespo Date 2021-12-15 Time 07:36 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-05-09 Cont ID  
Sent By rwbrown Date 2022-05-09 Time 08:43 Rev Time 0.00
Received By rwbrown Date 2022-05-09 Time 08:43 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-05-10 Cont ID  
Sent By vbroglia Date 2022-05-10 Time 15:33 Rev Time 0.00
Received By vbroglia Date 2022-05-10 Time 15:33 Sent To  
Notes
2022-05-10 16:09:4805/10/2022
  
 ALL EQUIPMENT SHALL BE MOUNTED ON THE GROUND AND
 SCREENED IN ACCORDANCE WITH THE SECTION 94-305(B) OF
 THE CITY?S ZONING AND LAND DEVELOPMENT REGULATIONS.
 SCREENING SHALL CONSIST OF A VISUALLY OPAQUE BARRIER
 WITH THE CHARACTER, ARCHITECTURAL DETAILING, AND COLOR
 SIMILAR TO THOSE UTILIZED IN THE ADJACENT BUILDING
 STRUCTURES. IN LIEU OF A SCREENED ENCLOSURE, MECHANICAL
 EQUIPMENT MAY OTHERWISE BE LOCATED WITHIN THE CONFINES
 OF AN ENCLOSED STRUCTURE OR BUILDING.