Plan Review Details - Permit 21120301
Plan Review Stops For Permit 21120301
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2021-12-07 Cont ID  
Sent By cpuell Date 2021-12-07 Time 16:35 Rev Time 0.00
Received By cpuell Date 2021-12-07 Time 16:35 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2023-02-17 Cont ID  
Sent By sberglun Date 2023-02-17 Time 13:26 Rev Time 0.00
Received By sberglun Date 2023-02-17 Time 13:26 Sent To  
Notes
2023-02-17 13:28:001) PROPOSED POLE LOCATION IS ON TOP OF A GAS MAIN.
 PLEASE PROVIDE A LETTER FROM THE GAS COMPANY ALLOWING
 THE PLACEMENT OF THE POLE.
 SUZANNE BERGLUND
 [email protected]

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-06-23 Cont ID  
Sent By sberglun Date 2022-06-23 Time 16:55 Rev Time 0.00
Received By sberglun Date 2022-06-23 Time 16:52 Sent To  
Notes
2022-06-23 16:55:191) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS.
 INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE
 MATERIAL, AND DESCRIPTION ON THE SITE PLAN. CONTACT
 JANICE TARBILL, [email protected] FOR AS-BUILT
 INFORMATION. INCLUDE AS-BUILT INFORMATION IN YOUR
 RESUBMITTAL.
 2) PROVIDE PROFILE FOR PROPOSED UNDERGROUND ELECTRIC
 SHOWING ALL CROSSING DATA FOR OTHER UTILITIES.
 3) ALL ROADWAY, SIDEWALK, AND SWALE RESTORATIONS ARE
 REQUIRED PER CITY STANDARD.
 4) PLEASE ADD STREET NAMES TO PROPOSED ELECTRIC PLAN
  
 SUZANNE BERGLUND
 [email protected]
 561-494-1075
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-02-27 Cont ID  
Sent By lmarchan Date 2023-02-27 Time 09:43 Rev Time 0.00
Received By lmarchan Date 2023-01-11 Time 07:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-06-24 Cont ID  
Sent By aoliver Date 2022-06-24 Time 07:37 Rev Time 0.00
Received By aoliver Date 2021-12-07 Time 13:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2021-12-17 Cont ID  
Sent By shill Date 2021-12-17 Time 15:45 Rev Time 0.00
Received By shill Date 2021-12-17 Time 15:45 Sent To  
Notes
2021-12-17 15:45:24SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 COMMUNICATIONS APPLICATIONS - NEW PROCESS EFFECTIVE
 12/6/2021
  
 1. FOR ALL FUTURE SUBMITTALS, PRIOR TO SUBMISSION,
 CONTACT [email protected] TO OBTAIN THE CORRECT ADDRESS
 FOR YOUR APPLICATION. SHE WILL ASSIGN AN ADDRESS VIA
 EMAIL. WHEN YOU SUBMIT THE APPLICATION, INCLUDE THE
 EMAIL AS AN ATTACHMENT.
  
 2. FOR ALL FUTURE SUBMITTALS, TO SUBMIT THE
 COMMUNICATIONS APPLICATION, EMAIL THE COMPLETED
 APPLICATION TO [email protected]. THEY WILL
 GENERATE YOUR APPLICATION AND SEND YOU INSTRUCTIONS TO
 UPLOAD YOUR PLANS.
  
 3. FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR
 ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 SIGNED, SEALED, DATED ORIGINALS. IT APPEARS THAT THE
 DOCUMENTS SUBMITTED PAPER TO THE BUILDING DIVISION WERE
 DIGITALLY SIGNED PLANS THAT WERE PRINTED.
  
 IF THIS APPLICATION FAILS REVIEW - WHEN RESUBMITTING,
 UPLOAD INDIVIDUALLY SIGNED AND SEALED DRAWINGS IF
 POSSIBLE. IF YOU CANNOT OBTAIN PLANS IN THAT FORMAT,
 UPLOAD THE SINGLE MULTIPAGE DIGITALY SIGNED PDF TO THE
 SIGNATURE FOLDER.
  
 IF THIS APPLICATION PASSES REVIEW - UPLOAD THE
 DIGITALLY SIGNED DOCUMENTS (SHOULD BE IDENTICAL TO THE
 DOCUMENTS REVIEWED) TO THE SIGNATURE FOLDER.
  
 IF THE ENGINEER DOES NOT HAVE A DIGITAL SIGNATURE,
 PLEASE CONTACT ME DIRECTLY TO DISCUSS OPTIONS.
  
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 2023-02-24 Cont ID  
Sent By ckimmerl Date 2023-02-24 Time 15:04 Rev Time 0.00
Received By ckimmerl Date 2023-02-24 Time 14:18 Sent To  
Notes
2023-02-24 15:04:401. CONCRETE CAISSON IS SHOWN ON SURVEY TO CONFLICT WITH
 EXISTING GAS LINE, PLEASE PROVIDE THE NECESSARY PUBLIC
 UTILITY LETTER GRANTING APPROVAL OF THIS PROPOSED POLE
 LOCATION AND DEPTH.
  
 2. PROPOSED BORE PITS AND HANDHOLE APPEAR TO BE TOO
 CLOSE TO EXISTING PALM TREES, PLEASE PROVIDE DIMENSION
 OF CLEARANCE BETWEEN EXCAVATION WORK AND TREES.
 RECOMMENDED AT LEAST 5 FT. CLEARANCE FROM PALMS TO
 SAFELY PROVIDE A BUFFER TO THE ROOT SYSTEM.
  
 4. THE POLE STEALTH DESIGN, HEIGHT, AND COLOR MEETS
 CITY STANDARDS.
  
 CHRIS KIMMERLY, AICP
 URBAN DESIGN PLANNER
 (561)822-1426
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2022-01-03 Cont ID  
Sent By ckimmerl Date 2022-01-03 Time 13:29 Rev Time 0.00
Received By ckimmerl Date 2022-01-03 Time 13:28 Sent To  
Notes
2022-01-03 13:29:061. SITE SURVEY (B-1) REFERENCES OVERHEAD WOODEN
 DISTRIBUTION POLES THAT NO LONGER EXIST WITHIN CURRENT
 STREET VIEW/SITE CONDITIONS, CANNOT REFERENCE OR
 UTILIZE THESE POLES IN ORDER TO ESTABLISH THE HEIGHT OF
 THE ANTENNA POLE. ANTENNA POLE HEIGHT AND COLOR SHALL
 BE ANALOGOUS TO THE EXISTING DECORATIVE CITY STREET
 LAMPS.
  
 2. CONCRETE CAISSON IS SHOWN ON SURVEY TO CONFLICT WITH
 EXISTING GAS LINE, PLEASE PROVIDE THE NECESSARY PUBLIC
 UTILITY LETTER GRANTING APPROVAL OF THIS PROPOSED POLE
 LOCATION AND DEPTH.
  
 3. PROPOSED BORE PITS AND HANDHOLE ARE TOO CLOSE TO
 EXISTING PALM TREES, PLEASE ADJUST TO PROVIDE THE
 NECESSARY SPACING TO PROTECT ROOT/TREE VIABILITY.
 RECOMMENDED AT LEAST 8 FT. CLEARANCE FROM PALMS TO
 SAFELY PROVIDE A BUFFER TO THE ROOT SYSTEM.
  
 4. UNDERGROUND ELECTRICAL VARIES BETWEEN SURVEY (B-1)
 AND PROPOSED POWER ROUTE (P-1), CONFIRM/VALIDATE FINAL
 ELECTRIC ROUTE.
  
 5. PLEASE PROVIDE A TYPICAL CROSS-SECTION SHOWING THE
 DEPTH OF THE UNDERGROUND ELECTRICAL COMPONENTS.
  
 6. THE POLE STEALTH DESIGN MEETS CITY STANDARDS.
  
 CHRIS KIMMERLY @ (561)822-1426
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy