Plan Review Details - Permit 21120294
| Plan Review Stops For Permit 21120294 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2021-12-07 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2021-12-07 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2021-12-07 |
Time |
16:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
F |
Date |
2023-04-18 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2023-04-18 |
Time |
10:44 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2023-04-18 |
Time |
10:44 |
Sent To |
|
|
| Notes |
| 2023-04-18 10:44:28 | PENDING COORDINATION WITH CHASE STREET STREETSCAPE | | | PROJECT. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2022-02-02 |
|
|
Cont ID |
|
| Sent By |
gpatrie |
Date |
2022-02-02 |
Time |
07:01 |
Rev Time |
|
| Received By |
gpatrie |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2022-02-02 07:01:29 | THE POLE LOCATION IS IN CONFLIC WITH EXISTINE CITY | | | UTILITIES AND NEED T BE RE LOCATED. | | | | | | CONTACT: [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2023-04-19 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-04-19 |
Time |
07:09 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-01-30 |
Time |
08:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-02-03 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-02-03 |
Time |
07:10 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-12-07 |
Time |
13:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-12-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-12-17 |
Time |
17:27 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-12-17 |
Time |
17:27 |
Sent To |
|
|
| Notes |
| 2021-12-17 17:27:20 | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | COMMUNICATIONS APPLICATIONS - NEW PROCESS EFFECTIVE | | | 12/6/2021 | | | | | | 1. FOR ALL FUTURE SUBMITTALS, PRIOR TO SUBMISSION, | | | CONTACT [email protected] TO OBTAIN THE CORRECT ADDRESS | | | FOR YOUR APPLICATION. SHE WILL ASSIGN AN ADDRESS VIA | | | EMAIL. WHEN YOU SUBMIT THE APPLICATION, INCLUDE THE | | | EMAIL AS AN ATTACHMENT. | | | | | | 2. FOR ALL FUTURE SUBMITTALS, TO SUBMIT THE | | | COMMUNICATIONS APPLICATION, EMAIL THE COMPLETED | | | APPLICATION TO [email protected]. THEY WILL | | | GENERATE YOUR APPLICATION AND SEND YOU INSTRUCTIONS TO | | | UPLOAD YOUR PLANS. | | | | | | 3. FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR | | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | | SIGNED, SEALED, DATED ORIGINALS. IT APPEARS THAT THE | | | DOCUMENTS SUBMITTED PAPER TO THE BUILDING DIVISION WERE | | | DIGITALLY SIGNED PLANS THAT WERE PRINTED. | | | | | | IF THIS APPLICATION FAILS REVIEW - WHEN RESUBMITTING, | | | UPLOAD INDIVIDUALLY SIGNED AND SEALED DRAWINGS IF | | | POSSIBLE. IF YOU CANNOT OBTAIN PLANS IN THAT FORMAT, | | | UPLOAD THE SINGLE MULTIPAGE DIGITALY SIGNED PDF TO THE | | | SIGNATURE FOLDER. | | | | | | IF THIS APPLICATION PASSES REVIEW - UPLOAD THE | | | DIGITALLY SIGNED DOCUMENTS (SHOULD BE IDENTICAL TO THE | | | DOCUMENTS REVIEWED) TO THE SIGNATURE FOLDER. | | | | | | IF THE ENGINEER DOES NOT HAVE A DIGITAL SIGNATURE, | | | PLEASE CONTACT ME DIRECTLY TO DISCUSS OPTIONS. | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2023-04-18 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2023-04-18 |
Time |
10:45 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2023-04-18 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2023-04-18 10:45:43 | PENDING COORDINATION WITH CHASE STREET PROJECT. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-01-03 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2022-01-03 |
Time |
11:39 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2022-01-03 |
Time |
11:33 |
Sent To |
|
|
| Notes |
| 2022-01-03 11:39:33 | 1. PROVIDED SURVEY IS NOT ACCURATE/COMPLETE. PLEASE | | | PROVIDE A COMPLETE SURVEY SHOWING THE FULL SCOPE OF | | | WORK. | | | | | | 2. PROPOSED BORE PITS AND HANDHOLE ARE TOO CLOSE TO | | | EXISTING PALM TREES, PLEASE ADJUST TO PROVIDE THE | | | NECESSARY SPACING TO PROTECT ROOT/TREE VIABILITY. | | | RECOMMENDED AT LEAST 8 FT. CLEARANCE FROM PALMS TO | | | SAFELY PROVIDE A BUFFER TO THE ROOT SYSTEM. | | | | | | 3. POLE & UNDERGROUND ELECTRIC SHOWN ON DRAWINGS TO | | | CONFLICT WITH EXISTING SANITATION/SEWER LINE, PLEASE | | | PROVIDE THE NECESSARY PUBLIC UTILITY LETTERS GRANTING | | | APPROVAL OF THIS PROPOSED BORE PITS, UNDERGROUND | | | ELECTRIC, AND POLE LOCATION. | | | | | | 4. PROPOSED UNDERGROUND ELECTRIC RUNS THROUGH PRIVATE | | | PROPERTY, REQUIRES AN UTILITY EASEMENT, OR REROUTE | | | THROUGH THE PUBLIC ROW. | | | | | | 5. THE POLE STEALTH DESIGN MEETS CITY STANDARDS. | | | | | | | | | CHRIS KIMMERLY @ (561)822-1426 | | | [email protected] | | | |
|
|
|