| Plan Review Stops For Permit 21120288 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2021-12-07 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2021-12-07 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2021-12-07 |
Time |
16:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2022-12-30 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2022-12-30 |
Time |
10:13 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2022-12-30 |
Time |
10:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2022-06-24 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2022-06-24 |
Time |
08:38 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2022-06-24 |
Time |
08:38 |
Sent To |
|
|
| Notes |
| 2022-06-24 08:38:51 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS. | | | INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE | | | MATERIAL, AND DESCRIPTION ON THE SITE PLAN. CONTACT | | | JANICE TARBILL, [email protected] FOR AS-BUILT | | | INFORMATION. INCLUDE AS-BUILT INFORMATION IN YOUR | | | RESUBMITTAL. | | | 2) PROFILE PROVIDED DOES NOT ACCURATELY SHOW CITY | | | UTILITIES. INCLUDE UTILITY TYPE, PIPE SIZE, PIPE | | | MATERIAL AND CROSSIND DATA FOR ALL UTILITIES. | | | 3) ALL ROADWAY, SIDEWALK, AND SWALE RESTORATIONS ARE | | | REQUIRED PER CITY STANDARD. | | | | | | SUZANNE BERGLUND | | | [email protected] | | | 561-494-1075 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2023-02-10 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-02-10 |
Time |
11:48 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2023-01-03 |
Time |
15:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-12-30 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-12-30 |
Time |
13:33 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-11-02 |
Time |
06:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-06-27 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-06-27 |
Time |
08:45 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-12-07 |
Time |
12:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
N |
Date |
2022-12-30 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-12-30 |
Time |
13:33 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-12-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-12-17 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-12-17 |
Time |
16:23 |
Sent To |
|
|
| Notes |
| 2021-12-17 16:24:09 | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | COMMUNICATIONS APPLICATIONS - NEW PROCESS EFFECTIVE | | | 12/6/2021 | | | | | | 1. FOR ALL FUTURE SUBMITTALS, PRIOR TO SUBMISSION, | | | CONTACT [email protected] TO OBTAIN THE CORRECT ADDRESS | | | FOR YOUR APPLICATION. SHE WILL ASSIGN AN ADDRESS VIA | | | EMAIL. WHEN YOU SUBMIT THE APPLICATION, INCLUDE THE | | | EMAIL AS AN ATTACHMENT. | | | | | | 2. FOR ALL FUTURE SUBMITTALS, TO SUBMIT THE | | | COMMUNICATIONS APPLICATION, EMAIL THE COMPLETED | | | APPLICATION TO [email protected]. THEY WILL | | | GENERATE YOUR APPLICATION AND SEND YOU INSTRUCTIONS TO | | | UPLOAD YOUR PLANS. | | | | | | 3. FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR | | | ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE | | | SIGNED, SEALED, DATED ORIGINALS. IT APPEARS THAT THE | | | DOCUMENTS SUBMITTED PAPER TO THE BUILDING DIVISION WERE | | | DIGITALLY SIGNED PLANS THAT WERE PRINTED. | | | | | | IF THIS APPLICATION FAILS REVIEW - WHEN RESUBMITTING, | | | UPLOAD INDIVIDUALLY SIGNED AND SEALED DRAWINGS IF | | | POSSIBLE. IF YOU CANNOT OBTAIN PLANS IN THAT FORMAT, | | | UPLOAD THE SINGLE MULTIPAGE DIGITALY SIGNED PDF TO THE | | | SIGNATURE FOLDER. | | | | | | IF THIS APPLICATION PASSES REVIEW - UPLOAD THE | | | DIGITALLY SIGNED DOCUMENTS (SHOULD BE IDENTICAL TO THE | | | DOCUMENTS REVIEWED) TO THE SIGNATURE FOLDER. | | | | | | IF THE ENGINEER DOES NOT HAVE A DIGITAL SIGNATURE, | | | PLEASE CONTACT ME DIRECTLY TO DISCUSS OPTIONS. | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2023-02-10 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-02-10 |
Time |
11:00 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-02-10 |
Time |
11:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2022-12-16 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2022-12-16 |
Time |
09:33 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2022-12-16 |
Time |
09:29 |
Sent To |
|
|
| Notes |
| 2022-12-16 09:33:46 | PROPOSAL MEETS ZONING STANDARDS FOR WCF POLE STEALTH | | | DESIGN, LOCATION, HEIGHT, COLOR, AND ELECTRIC ROUTE. | | | | | | ***FAIL STATUS IS ONLY SO PERMIT KICKS-BACK TO ZONING | | | AFTER ENGINEERING REVIEW.*** | | | UPON ENGINEERING PASS, ZONING STAFF SHALL PREPARE WCF | | | APPROVAL LETTER. | | | | | | CHRIS KIMMERLY, AICP | | | URBAN DESIGN PLANNER | | | 822-1426 [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-01-03 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2022-01-03 |
Time |
10:33 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2022-01-03 |
Time |
10:25 |
Sent To |
|
|
| Notes |
| 2022-01-03 10:27:05 | 1. PROPOSED POLE LOCATION MAY CONFLICT WITH RECENTLY | | | APPROVED AC MARRIOT HOTEL PROJECT. WILL REQUIRE UPDATED | | | PLANS/DRAWINGS. POTENTIAL POLE CONFLICT WITH PARKING | | | STRUCTURE/VALET OPERATION ENTRANCE, LANDSCAPING (STREET | | | TREES), STRUCTURAL SOIL, OR STREET LIGHTING. OVERLAY | | | POLE PLAN ONTO APPROVED AC MARRIOTT PLANS. MAY HAVE TO | | | SHIFT OR SUGGEST ALTERNATIVE POLE LOCATION. PLEASE | | | COORDINATE TO PRODUCE REVISED PLANS. | | | | | | AC MARRIOT ENGINEER/ARCHITECT/DEV. CONTACT | | | CIVIL: THOMAS ENGINEERING GROUP - JASON GUNTHER | | | (561)203-7503 WWW.THOMASENGINEERINGGROUP.COM | | | | | | ARCHITECT: LK ARCHITECTURE - HOWIE BEAUCHAMP | | | (316)268-0230 | | | | | | OWNER: HIBISCUS VENTURES LLC - JOE SULLIVAN | | | (561)883-5959 | | | | | | 2. PLEASE ALIGN PROPOSED POLE WITH THE APPROVED AC | | | MARRIOT PLANS FOR STREET TREES AND STREET LIGHTING. | | | | | | 3. POLE COLOR SHALL MATCH THE PROPOSED STREET LIGHT | | | POLES ALONG GARDENIA. | | | | | | 4. PLEASE PROVIDE THE NECESSARY PUBLIC UTILITY LETTERS | | | GRANTING APPROVAL OF THE BORE PITS AND UNDERGROUND | | | ELECTRICAL FOR THIS PROPOSED POLE LOCATION IN RELATION | | | TO EXISTING COM LINES. | | | | | | 5. THE POLE STEALTH DESIGN MEETS CITY STANDARDS. | | | | | | | | | | | | CHRIS KIMMERLY @ (561)822-1426 | | | [email protected] | | | |
|
|