Plan Review Details - Permit 21111268
Plan Review Stops For Permit 21111268
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-02-25 Cont ID  
Sent By pvalenti Date 2022-02-25 Time 15:47 Rev Time 0.00
Received By pvalenti Date 2022-02-25 Time 15:44 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-02-16 Cont ID  
Sent By pvalenti Date 2022-02-16 Time 16:45 Rev Time 0.00
Received By pvalenti Date 2022-02-16 Time 16:25 Sent To  
Notes
2022-02-16 17:00:17PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 FBC B 107.2.1, THE OPENING SCHEDULE SHEETS NEED TO BE
 CORRECTED AS THE VERTICAL ARE NOT ALL LINING UP WITH
 THE LENGTH OF SHUTTERS. IT APPEARS THAT MANY OF THE
 SPAN LENGTHS ARE TOO SHORT TO MEET THE LENGTH OF
 SHUTTER OPENINGS. PLEASE REVIEW AND RESUBMIT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-01-20 Cont ID  
Sent By pvalenti Date 2022-01-20 Time 09:08 Rev Time 0.00
Received By pvalenti Date 2022-01-20 Time 08:40 Sent To  
Notes
2022-01-20 09:10:56PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 FBC B 107.2.1, PLEASE PROVIDE THE PRODUCT APPROVALS FOR
 THE ACCORDIAN AND PANEL SHUTTERS. WITHIN THE PRODUCT
 APPROVALS CIRCLE THE OPTIONS THAT WILL BE USED.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-02-25 Cont ID  
Sent By pvalenti Date 2022-02-25 Time 15:48 Rev Time 0.00
Received By pvalenti Date 2022-02-18 Time 07:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-02-16 Cont ID  
Sent By pvalenti Date 2022-02-16 Time 17:00 Rev Time 0.00
Received By pvalenti Date 2022-01-21 Time 06:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-01-20 Cont ID  
Sent By pvalenti Date 2022-01-20 Time 09:11 Rev Time 0.00
Received By pvalenti Date 2021-12-03 Time 07:10 Sent To  
Notes
***NONE***