| Plan Review Stops For Permit 21110999 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2022-04-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-04-07 |
Time |
08:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-04-07 |
Time |
08:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-03-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-03-14 |
Time |
13:15 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-03-14 |
Time |
13:15 |
Sent To |
|
|
| Notes |
| 2022-03-14 13:30:03 | PLAN | | | REVIEW COMMENTS | | | | | | 2ND REVIEW: FBC SEVENTH EDITION (2020) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) NOT RESOLVED. [THE DIMENSIONS AND WEIGHT OF THE | | | GENERATOR IN THE PAD ENGINEERING IS MORE THAN THE | | | GENERATOR SHOWN PAGE 4 OF THE GENERATOR | | | SPECIFICATIONS.] THE GENERATOR PAD CALCULATIONS ARE FOR | | | A GENERATOR THAT WEIGHS 850 POUNDS. THE SPECIFICATIONS | | | FOR THE 22KW GENERAC GENERATOR HAS THE UNIT'S WEIGHT AS | | | 466 POUNDS. FBC AMENDMENTS 107.2.1 | | | | | | 2) RESOLVED. | | | | | | 3) RESOLVED. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-01-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-01-28 |
Time |
11:06 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-01-28 |
Time |
11:06 |
Sent To |
|
|
| Notes |
| 2022-01-28 11:06:09 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE GENERATOR PAD CALCULATIONS ARE FOR A GENERATOR | | | THAT WEIGHS 850 POUNDS. THE SPECIFICATIONS FOR THE 22KW | | | GENERAC GENERATOR HAS THE UNIT'S WEIGHT AS 466 POUNDS. | | | FBC AMENDMENTS 107.2.1 | | | | | | 2) THE VULT WIND SPEED IS 180 MPH ON THE PAD | | | CALCULATIONS AND 190 MPH ON THE PAD DRAWING. FBC | | | AMENDMENTS 107.2.1 | | | | | | 3) THE DESIGN NOTES ON THE DRAWING HAS THE 2021 FBC. | | | THE CORRECT CODE EDITION IS THE 2020 FBC. IT APPEARS | | | THAT THIS MAY HAVE BEEN ALTERED BY SOMEONE OTHER THAN | | | THE ENGINEER. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-01-20 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-01-20 |
Time |
13:52 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-01-20 |
Time |
13:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2021-12-27 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-12-27 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-12-27 |
Time |
11:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-04-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-04-07 |
Time |
08:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-03-22 |
Time |
07:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-03-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-03-14 |
Time |
13:30 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-02-17 |
Time |
06:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-01-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-01-28 |
Time |
11:06 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-12-17 |
Time |
09:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2021-12-27 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-12-27 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-12-27 |
Time |
11:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-04-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-04-07 |
Time |
08:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-04-07 |
Time |
08:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-03-14 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-03-14 |
Time |
13:13 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-03-14 |
Time |
13:13 |
Sent To |
|
|
| Notes |
| 2022-03-14 13:14:55 | THE GENERATOR PAD DRAWING HAS THE ENGINEER'S DIGITAL | | | SIGNATURE. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2022-01-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-01-28 |
Time |
10:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-01-28 |
Time |
10:28 |
Sent To |
|
|
| Notes |
| 2022-01-28 10:31:04 | THE GENERATOR PAD CALCULATIONS AND DRAWINGS DO NOT HAVE | | | THE ENGINEER'S DIGITAL SIGNATURE. ELECTRONICALLY | | | SUBMITTED DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT | | | OR ENGINEER'S DIGITAL SIGNATURE ON THEM. YOU ALSO HAVE | | | THE OPTION TO SUBMIT THE SIGNED AND SEALED PAPER | | | VERSION OF DRAWINGS. AFTER THE ELECTRONIC PLANS HAVE | | | BEEN APPROVED, YOU CAN SUBMIT THE CORRESPONDING PAPER | | | DRAWINGS AT THE BUILDING DEPARTMENT TO BE VERIFIED. THE | | | ARCHITECT OR ENGINEER'S ORIGINAL HANDWRITTEN SIGNATURE | | | AND SEAL IS REQUIRED TO BE ON THE DRAWINGS. NO | | | PHOTOCOPY OR OTHER FACSIMILES OF THE SIGNATURE ARE | | | ACCEPTABLE. FS 481 & 61G1 OR FS 471 & 61G15 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-02-24 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2022-02-24 |
Time |
16:31 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2022-02-24 |
Time |
16:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-12-23 |
|
|
Cont ID |
|
| Sent By |
vbroglia |
Date |
2021-12-23 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
vbroglia |
Date |
2021-12-23 |
Time |
13:39 |
Sent To |
|
|
| Notes |
| 2021-12-23 13:46:23 | 12/23/21 FAILED. PLEASE PROVIDE THE REAR AND SIDE | | | SETBACKS OF THE GENARATOR | | | | | | VALENTINA BROGLIA | | | ASSOCIATE PLANNER | | | 561-822-1442 | | | [email protected] | | | |
|
|