| 2022-03-15 05:56:45 | BUILDING PLAN REVIEW |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | BU1635 BN4338 |
| | ASFPM CFM US-21-11935 |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | NFPA 70 2017 EDITION NEC 2017 |
| | |
| | 1ST REVIEW |
| | |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | NOTICE: INSUFFICIENT INFORMATION TO PERFORM A BUILDING |
| | PLAN REVIEW. |
| | |
| | 1. SURVEY IS BLURRY. CANNOT VERIFY ADDRESS, EASEMENTS |
| | OR LOCATION OF PROPOSED STRUCTURE TO LOT LINES OR |
| | EXISTING STRUCTURES. |
| | |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | 2. CANNOT DETERMINE WHAT TYPE OF STRUCTURE THE PROPOSED |
| | CARPORT IS. |
| | 2A) IF IT'S A PRE-MANUFACTURED STRUCTURE, PROVIDE A |
| | VALID FLORIDA PRODUCT APPROVAL. INCLUDE TIE-DOWN |
| | DETAILS PER FS 553, CHPT. 1. |
| | 2B) IF IT'S A SITE BUILT STRUCTURE, PROVIDE ALL |
| | REQUIRED PLANS AND SPECIFICATIONS. |
| | |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | 3. VALUE |
| | CITY OF WPB CHPT109.3 BUILDING PERMIT VALUATIONS. |
| | 1A. VALUE APPEARS LOW FOR THE PROPOSED SCOPE OF WORK. |
| | 1B. THE PERMIT VALUATION AND PERMIT FEE MUST BE |
| | COMMENSURATE WITH THE VALUATION AND FEE THAT A LICENSED |
| | CONTRACTOR WOULD PROVIDE. THIS INCLUDES ALL LABOR, |
| | MATERIALS AND RENTALS OF EQUIPMENT TO PERFORM THE SCOPE |
| | OF WORK. |
| | 1C. YOU MAY PROVIDE A COPY OF THE CONTRACT SIGNED BY |
| | THE OWNER OR A LIST OF LABOR, MATERIALS AND EQUIPMENT |
| | RENTAL TO VERIFY VALUE. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL |
| | |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| | |