| Plan Review Stops For Permit 21110859 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
7 |
Status |
P |
Date |
2022-08-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-29 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-29 |
Time |
11:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
6 |
Status |
P |
Date |
2022-08-18 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-18 |
Time |
11:22 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-18 |
Time |
11:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
F |
Date |
2022-08-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-04 |
Time |
09:50 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-04 |
Time |
09:50 |
Sent To |
|
|
| Notes |
| 2022-08-04 10:04:03 | BATTERY STORAGE BUILDING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) PRODUCT APPROVAL (FL16039-R17) FOR THE ROOFING | | | SYSTEM - THE PRODUCT APPROVAL DOES NOT INCLUDE FRP | | | PANELS AS AN APPROVED SUBSTRATE. | | | | | | 2) PLEASE CIRCLE ROOFING SYSTEMS TO BE USED IN THE | | | ROOFING PRODUCT APPROVALS. | | | | | | 3) ROOFING SYSTEMS AND PRODUCT APPROVALS FOR SUCH MAY | | | BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE DEFERRED | | | ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED | | | SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED | | | SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN | | | THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION | | | AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL | | | WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL | | | ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING | | | OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN | | | RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS | | | ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE | | | BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL | | | ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN | | | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW | | | THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A | | | NOTATION INDICATING THAT THE DEFERRED SUBMITTAL | | | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL | | | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED | | | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE | | | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE | | | BUILDING OFFICIAL. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2022-07-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
09:09 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-22 |
Time |
09:03 |
Sent To |
|
|
| Notes |
| 2022-07-22 09:04:46 | BATTERY STORAGE BUILDING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) PRODUCT APPROVAL (NOA 22-0216.05) FOR THE ROOFING | | | SYSTEM - THE PRODUCT APPROVAL DOES NOT INCLUDE FRP | | | PANELS AS AN APPROVED SUBSTRATE. | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2022-06-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-06-23 |
Time |
10:37 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-06-23 |
Time |
10:14 |
Sent To |
|
|
| Notes |
| 2022-06-23 10:37:55 | BATTERY STORAGE BUILDING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) WIND DESIGN SHOWN - RISK CATEGORY II WIND SPEED | | | 167MPH - A RISK CATEGORY II REQUIRES A MINIMUM WIND | | | SPEED OF 170MPH - PER FBC WPB SECTION 120. | | | | | | 2) PRODUCT APPROVAL (NOA 22-0216.05) FOR THE ROOFING | | | SYSTEM - THE PRODUCT APPROVAL DOES NOT INCLUDE FRP | | | PANELS AS AN APPROVED SUBSTRATE. | | | | | | 3) PLEASE PROVIDE DETAILS FOR THE FOUNDATION SLAB FROM | | | A DESIGN PROFESSIONAL - SHOW THE WIND DESIGN DATA USED | | | ON THE SLAB DRAWINGS FBC 1603.1.4 | | | | | | 4) A BUILDING WITH A CONSTRUCTION TYPE OF VB REQUIRES A | | | 1 HOUR FIRE RATED EXTERIOR WALL WHEN THE SET BACK FROM | | | THE PROPERTY LINE IS 5' - PLEASE SEE FBC TABLE 602 | | | | | | 5) PLEASE SHOW THE BUILDING OCCUPANCY CLASSIFICATION | | | PER FBC CHAPTER 3 - (H) OCCUPANCY CLASSIFICATION | | | REQUIRES ADDITIONAL INFORMATION FBC 414.1.3 INFORMATION | | | REQUIRED. | | | A REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL | | | IDENTIFYING THE MAXIMUM EXPECTED QUANTITIES OF | | | HAZARDOUS MATERIALS TO BE STORED, USED IN A CLOSED | | | SYSTEM AND USED IN AN OPEN SYSTEM, AND SUBDIVIDED TO | | | SEPARATELY ADDRESS HAZARDOUS MATERIAL CLASSIFICATION | | | CATEGORIES BASED ON TABLES 307.1(1) AND 307.1(2). THE | | | METHODS OF PROTECTION FROM SUCH HAZARDS, INCLUDING BUT | | | NOT LIMITED TO CONTROL AREAS, FIRE PROTECTION SYSTEMS | | | AND GROUP H OCCUPANCIES SHALL BE INDICATED IN THE | | | REPORT AND ON THE CONSTRUCTION DOCUMENTS. THE OPINION | | | AND REPORT SHALL BE PREPARED BY A QUALIFIED PERSON, | | | FIRM OR CORPORATION APPROVED BY THE BUILDING OFFICIAL | | | AND PROVIDED WITHOUT CHARGE TO THE ENFORCING AGENCY. | | | | | | FOR BUILDINGS AND STRUCTURES WITH AN OCCUPANCY IN GROUP | | | H, SEPARATE FLOOR PLANS SHALL BE SUBMITTED IDENTIFYING | | | THE LOCATIONS OF ANTICIPATED CONTENTS AND PROCESSES SO | | | AS TO REFLECT THE NATURE OF EACH OCCUPIED PORTION OF | | | EVERY BUILDING AND STRUCTURE. | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-02-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-02-16 |
Time |
09:54 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-02-16 |
Time |
09:39 |
Sent To |
|
|
| Notes |
| 2022-02-16 09:54:40 | BATTERY STORAGE BUILDING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) WIND DESIGN SHOWN - RISK CATEGORY II WIND SPEED | | | 167MPH - A RISK CATEGORY II REQUIRES A MINIMUM WIND | | | SPEED OF 170MPH - PER FBC WPB SECTION 120. | | | | | | 2) ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED | | | APPROVED BY THE BUILDING DESIGNER OF RECORD - FBC WPB | | | 107.3.4 | | | | | | 3) PLEASE PROVIDE THE COMPLETE (FRONT PAGES AND THE | | | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE | | | PRODUCT APPROVALS FOR THE ROOFING SYSTEM. | | | | | | 4) PRODUCT APPROVALS PROVIDED FOR THE EXTERIOR SWING | | | DOORS AND OVERHEAD ROLLING DOOR SHOWS ATTACHMENT TO | | | WOOD, METAL AND CONCRETE SUBSTRATE - THE ATTACHMENT TO | | | FRP FRAMING WILL REQUIRE A SITE SPECIFIC ATTACHMENT | | | DETAIL FROM A DESIGN PROFESSIONAL. | | | | | | 5) PLEASE PROVIDE DETAILS FOR THE FOUNDATION SLAB FROM | | | A DESIGN PROFESSIONAL - SHOW THE WIND DESIGN DATA USED | | | ON THE SLAB DRAWINGS FBC 1603.1.4 | | | | | | 6) PLEASE SHOW THE DIMENSIONS FROM THE PROPERTY LINE | | | AND OTHER BUILDINGS TO THE SHED - PLEASE PROVIDE A SITE | | | PLAN SHOWING THE FOLLOWING INFORMATION 107.2.5 SITE | | | PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED WITH THE | | | APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY A SITE | | | PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF NEW | | | CONSTRUCTION AND EXISTING STRUCTURES ON THE SITE, | | | DISTANCES FROM LOT LINES, THE ESTABLISHED STREET GRADES | | | AND THE PROPOSED FINISHED GRADES, DEPICTING THE | | | PROPOSED LOT DRAINAGE AND, AS APPLICABLE, FLOOD HAZARD | | | AREAS, FLOODWAYS, AND DESIGN FLOOD ELEVATIONS; AND IT | | | SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND | | | INCLUDED ON A BOUNDARY LINE SURVEY. | | | | | | 7) PLEASE SHOW THE BUILDING OCCUPANCY CLASSIFICATION | | | PER FBC CHAPTER 3 - (H) OCCUPANCY CLASSIFICATION | | | REQUIRES ADDITIONAL INFORMATION FBC 414.1.3 INFORMATION | | | REQUIRED. | | | A REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL | | | IDENTIFYING THE MAXIMUM EXPECTED QUANTITIES OF | | | HAZARDOUS MATERIALS TO BE STORED, USED IN A CLOSED | | | SYSTEM AND USED IN AN OPEN SYSTEM, AND SUBDIVIDED TO | | | SEPARATELY ADDRESS HAZARDOUS MATERIAL CLASSIFICATION | | | CATEGORIES BASED ON TABLES 307.1(1) AND 307.1(2). THE | | | METHODS OF PROTECTION FROM SUCH HAZARDS, INCLUDING BUT | | | NOT LIMITED TO CONTROL AREAS, FIRE PROTECTION SYSTEMS | | | AND GROUP H OCCUPANCIES SHALL BE INDICATED IN THE | | | REPORT AND ON THE CONSTRUCTION DOCUMENTS. THE OPINION | | | AND REPORT SHALL BE PREPARED BY A QUALIFIED PERSON, | | | FIRM OR CORPORATION APPROVED BY THE BUILDING OFFICIAL | | | AND PROVIDED WITHOUT CHARGE TO THE ENFORCING AGENCY. | | | | | | FOR BUILDINGS AND STRUCTURES WITH AN OCCUPANCY IN GROUP | | | H, SEPARATE FLOOR PLANS SHALL BE SUBMITTED IDENTIFYING | | | THE LOCATIONS OF ANTICIPATED CONTENTS AND PROCESSES SO | | | AS TO REFLECT THE NATURE OF EACH OCCUPIED PORTION OF | | | EVERY BUILDING AND STRUCTURE. | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-12-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-12-27 |
Time |
10:02 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-12-27 |
Time |
09:25 |
Sent To |
|
|
| Notes |
| 2021-12-27 09:38:36 | BATTERY STORAGE BUILDING | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) WIND DESIGN SHOWN - RISK CATEGORY II WIND SPEED | | | 167MPH - A RISK CATEGORY II REQUIRES A MINIMUM WIND | | | SPEED OF 170MPH - PER FBC WPB SECTION 120. | | | | | | 2) PLEASE SHOW THE EXTERIOR WALL PANEL ATTACHMENTS OR | | | PROVIDE A MIAMI DADE OR FLORIDA STATE PRODUCT APPROVAL | | | FBC WPB 107.2.4 | | | | | | 3) PLEASE SHOW OR PROVIDE A STATEMENT FOR THE EXTERIOR | | | WALL WEATHER PROTECTION - FBC 1403.2 WEATHER | | | PROTECTION. | | | EXTERIOR WALLS SHALL PROVIDE THE BUILDING WITH A | | | WEATHER-RESISTANT EXTERIOR WALL ENVELOPE. | | | | | | 4) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE | | | INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE | | | PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS, EXTERIOR | | | DOORS AND ROOFING SYSTEMS. - ALL PRODUCT APPROVALS NEED | | | TO BE REVIEWED AND MARKED APPROVED BY THE BUILDING | | | DESIGNER OF RECORD - FBC WPB 107.3.4 | | | | | | 5) PLEASE PROVIDE A SITE PLAN SHOWING THE FOLLOWING | | | INFORMATION 107.2.5 SITE PLAN. THE CONSTRUCTION | | | DOCUMENTS SUBMITTED WITH THE APPLICATION FOR PERMIT | | | SHALL BE ACCOMPANIED BY A SITE PLAN SHOWING TO SCALE | | | THE SIZE AND LOCATION OF NEW CONSTRUCTION AND EXISTING | | | STRUCTURES ON THE SITE, DISTANCES FROM LOT LINES, THE | | | ESTABLISHED STREET GRADES AND THE PROPOSED FINISHED | | | GRADES, DEPICTING THE PROPOSED LOT DRAINAGE AND, AS | | | APPLICABLE, FLOOD HAZARD AREAS, FLOODWAYS, AND DESIGN | | | FLOOD ELEVATIONS; AND IT SHALL BE DRAWN IN ACCORDANCE | | | WITH AN ACCURATE AND INCLUDED ON A BOUNDARY LINE | | | SURVEY. | | | | | | 6) PLEASE PROVIDE A SURVEY. | | | | | | 7) PLEASE SHOW THE BUILDING OCCUPANCY CLASSIFICATION | | | PER FBC CHAPTER 3 - (H) OCCUPANCY CLASSIFICATION | | | REQUIRES ADDITIONAL INFORMATION FBC 414.1.3 INFORMATION | | | REQUIRED. | | | A REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL | | | IDENTIFYING THE MAXIMUM EXPECTED QUANTITIES OF | | | HAZARDOUS MATERIALS TO BE STORED, USED IN A CLOSED | | | SYSTEM AND USED IN AN OPEN SYSTEM, AND SUBDIVIDED TO | | | SEPARATELY ADDRESS HAZARDOUS MATERIAL CLASSIFICATION | | | CATEGORIES BASED ON TABLES 307.1(1) AND 307.1(2). THE | | | METHODS OF PROTECTION FROM SUCH HAZARDS, INCLUDING BUT | | | NOT LIMITED TO CONTROL AREAS, FIRE PROTECTION SYSTEMS | | | AND GROUP H OCCUPANCIES SHALL BE INDICATED IN THE | | | REPORT AND ON THE CONSTRUCTION DOCUMENTS. THE OPINION | | | AND REPORT SHALL BE PREPARED BY A QUALIFIED PERSON, | | | FIRM OR CORPORATION APPROVED BY THE BUILDING OFFICIAL | | | AND PROVIDED WITHOUT CHARGE TO THE ENFORCING AGENCY. | | | | | | FOR BUILDINGS AND STRUCTURES WITH AN OCCUPANCY IN GROUP | | | H, SEPARATE FLOOR PLANS SHALL BE SUBMITTED IDENTIFYING | | | THE LOCATIONS OF ANTICIPATED CONTENTS AND PROCESSES SO | | | AS TO REFLECT THE NATURE OF EACH OCCUPIED PORTION OF | | | EVERY BUILDING AND STRUCTURE. | | | | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2022-02-10 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-02-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
bdolan |
Date |
2022-02-10 |
Time |
12:32 |
Sent To |
|
|
| Notes |
| 2022-02-10 12:36:12 | THIS PLAN WAS REVIEWED AND APPROVED BY THE FIRE | | | DEPARTMENT, WITH THE FOLLOWING COMMENTS: | | | | | | THE CONTENTS OF THE STORAGE SHED MAY NECESSITATE | | | PLACARDING FOR POSSIBLE HAZARDS, TO BE DETERMINED | | | DURING FIELD INSPECTION. | | | | | | PER CITY CODES, ALL WORK IS SUBJECT TO FIELD | | | INSPECTIONS AND APPROVAL. | | | | | | LT. BRIAN DOLAN | | | DIVISION OF FIRE PREVENTION | | | 561-804-4752 | | | [email protected] | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-11-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
jcclark |
Date |
2021-11-22 |
Time |
13:14 |
Sent To |
|
|
| Notes |
| 2021-11-22 14:00:56 | THIS PLAN WAS REVIEWED AND FAILED BY JOSEPH CLARK, | | | DIVISION OF FIRE PREVENTION, WITH THE FOLLOWING | | | COMMENTS: | | | 1. NO VISIBLE SITE PLAN IS LOCATED SHOWING WHERE THE | | | SHED WILL BE LOCATED IN RELATION TO THE BUILDINGS, | | | WHERE HYDRANTS WOULD BE LOCATED, THE PURPOSE OF THE | | | SHED ON PROPERTY. | | | 2. AS PER A CONVERSATION WITH PROVIDENCE ENGINEERING | | | CORP., THEY STATED THE KNOWN PURPOSE WAS FOR EV BATTERY | | | STORAGE AND OTHER VEHICLE PARTS. PLEASE CONFIRM | | | COMPLIANCE WITH NFPA 1 52.3.2.6.4.1. | | | 3. NO DOCUMENTED SIGNAGE IF FOUND ON THE PLAN NOTES. | | | SEE NFPA 52.3.2.6.5.2. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
P |
Date |
2022-08-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-29 |
Time |
11:41 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-23 |
Time |
06:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2022-08-18 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-18 |
Time |
11:32 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-09 |
Time |
16:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2022-08-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-04 |
Time |
10:09 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-27 |
Time |
15:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-07-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
09:13 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-13 |
Time |
16:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-06-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-06-23 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-06-08 |
Time |
13:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-03-25 |
Time |
16:05 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-02-09 |
Time |
09:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2022-01-14 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-01-14 |
Time |
09:12 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-11-18 |
Time |
16:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
6 |
Status |
P |
Date |
2022-08-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-29 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-29 |
Time |
11:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
5 |
Status |
P |
Date |
2022-08-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-04 |
Time |
10:06 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-04 |
Time |
10:06 |
Sent To |
|
|
| Notes |
| 2022-08-04 10:06:09 | SEE BUILDING REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
4 |
Status |
F |
Date |
2022-07-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
09:13 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-22 |
Time |
09:13 |
Sent To |
|
|
| Notes |
| 2022-07-22 09:13:24 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
F |
Date |
2022-06-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-06-23 |
Time |
10:38 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-06-23 |
Time |
10:38 |
Sent To |
|
|
| Notes |
| 2022-06-23 10:38:51 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2022-02-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-02-16 |
Time |
09:55 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-02-16 |
Time |
09:55 |
Sent To |
|
|
| Notes |
| 2022-02-16 10:01:05 | SEE BUILDING REVIEW |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2021-12-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-12-27 |
Time |
10:02 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-12-27 |
Time |
10:02 |
Sent To |
|
|
| Notes |
| 2021-12-27 10:02:51 | SEE BUILDING PLAN REVIEW |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
7 |
Status |
P |
Date |
2022-08-29 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-29 |
Time |
11:40 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-29 |
Time |
11:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
6 |
Status |
F |
Date |
2022-08-18 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-18 |
Time |
11:30 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-18 |
Time |
11:29 |
Sent To |
|
|
| Notes |
| 2022-08-18 11:32:34 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) THE FOUNDATION PLAN S000 DOES NOT SHOW AS DIGITALLY | | | SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
5 |
Status |
F |
Date |
2022-08-04 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-08-04 |
Time |
10:05 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-08-04 |
Time |
10:05 |
Sent To |
|
|
| Notes |
| 2022-08-04 10:05:28 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) SIGNED AND SEALED DRAWINGS DO NOT SHOW AS DIGITALLY | | | SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
F |
Date |
2022-07-22 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-07-22 |
Time |
09:12 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-07-22 |
Time |
09:12 |
Sent To |
|
|
| Notes |
| 2022-07-22 09:12:59 | SIGNATURE REVIEW | | | | | | CORRECTIONS NEEDED - | | | | | | 1) SIGNED AND SEALED DRAWINGS DO NOT SHOW AS DIGITALLY | | | SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | | SPECIFIC TYPE OF E-SIGNATURE). | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-06-23 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-06-23 |
Time |
10:47 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-06-23 |
Time |
10:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-02-16 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-02-16 |
Time |
10:15 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-02-16 |
Time |
10:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2021-12-27 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-12-27 |
Time |
10:07 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-12-27 |
Time |
10:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2022-07-15 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2022-07-15 |
Time |
14:26 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2022-07-15 |
Time |
14:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2022-06-16 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2022-06-16 |
Time |
11:55 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2022-06-16 |
Time |
11:26 |
Sent To |
|
|
| Notes |
| 2022-06-16 11:55:29 | FAILED | | | | | | 1) PRIOR TO ZONING APPROVAL OF THIS PERMIT, A LANDSCAPE | | | PERMIT FOR THE NEW LANDSCAPE ISLAND INSTALLATION NEEDS | | | TO BE SUBMITTED TO THE BUILDING DIVISION. | | | | | | 2) THE PROPOSED BATTERY STORAGE BUILDING SIDE DOOR IS | | | SHOWN ON THE LEFT SIDE ON THE FLOOR AND ELEVATION | | | PLANS; HOWEVER, THE SITE AND LANDSCAPE PLANS INCLUDE | | | THE NOTCH IN THE ISLAND ON THE RIGHT SIDE OF THE | | | BUILDING. | | | | | | EITHER | | | | | | A, PROVIDE UPDATED SHEETS 100, 200 AND 300 SHOWING THE | | | DOOR ON THE OPPOSITE SIDE OF THE BUILDING, OR | | | | | | B. CORRECT THE SITE AND LANDSCAPE PLANS.TO CORRECTLY | | | DEPICT THE DOOR ORIENTATION. NOTE: IF THESE PLANS ARE | | | CHANGED, REVISED PLANS WILL NEED TO BE SUBMITTED TO | | | PLANNING FOR AN UPDATED MINOR AMENDMENT REVIEW. | | | | | | CONTACT ERIC SCHNEIDER @ 561 (822-1446) | | | [email protected] |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2022-03-25 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2022-03-25 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
eschneid |
Date |
2022-03-25 |
Time |
13:21 |
Sent To |
|
|
| Notes |
| 2022-03-25 13:22:24 | ZONING REVIEW ON HOLD UNTIL THE REQUIRED PLANNED | | | DEVELOPMENT AMENDMENT IS SUBMITTED AND REVIEWED. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2022-01-13 |
|
|
Cont ID |
|
| Sent By |
eshneide |
Date |
2022-01-13 |
Time |
17:15 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2022-01-13 |
Time |
17:14 |
Sent To |
|
|
| Notes |
| 2022-01-13 17:20:41 | FAILED | | | | | | 1) PROVIDE A SURVEY AND A SITE PLAN SHOWING WHERE THE | | | PROPOSED STRUCTURE IS TO BE LOCATED. | | | | | | 2) THE ADDITION OF A STRUCTURE ON THE PROPERTY REQUIRES | | | THE SUBMITTAL TO AND APPROVAL BY THE PLANNING DIVISION | | | OF A PLANNED DEVELOPMENT AMENDMENT. | | | | | | 3) DESCRIBE THE EXACT USE OF THE BUILDING. THE USE OF | | | THE BUILDING WILL DETERMINE IF THE PLANNED DEVELOPMENT | | | AMENDMENT CAN BE PROCESSED AT STAFF LEVEL OR REQUIRES | | | CITY COMMISSION APPROVAL. | | | | | | 4) ADDITIONAL ZONING COMMENTS WILL BE ISSUED WHEN THE | | | INFORMATION REQUIRED IN COMMENTS #1 AND #3 IS PROVIDED. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] |
|
|