Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2022-08-29 Cont ID  
Sent By rmcphers Date 2022-08-29 Time 11:40 Rev Time 0.00
Received By rmcphers Date 2022-08-29 Time 11:40 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2022-08-18 Cont ID  
Sent By rmcphers Date 2022-08-18 Time 11:22 Rev Time 0.00
Received By rmcphers Date 2022-08-18 Time 11:22 Sent To  
Notes
2022-08-18 11:27:11 
  
  
  
  
  
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2022-08-04 Cont ID  
Sent By rmcphers Date 2022-08-04 Time 09:50 Rev Time 0.00
Received By rmcphers Date 2022-08-04 Time 09:50 Sent To  
Notes
2022-08-04 10:04:03BATTERY STORAGE BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PRODUCT APPROVAL (FL16039-R17) FOR THE ROOFING
 SYSTEM - THE PRODUCT APPROVAL DOES NOT INCLUDE FRP
 PANELS AS AN APPROVED SUBSTRATE.
  
 2) PLEASE CIRCLE ROOFING SYSTEMS TO BE USED IN THE
 ROOFING PRODUCT APPROVALS.
  
 3) ROOFING SYSTEMS AND PRODUCT APPROVALS FOR SUCH MAY
 BE DEFERRED SUBMITTALS BY LISTING ITEMS TO BE DEFERRED
 ON THE CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED
 SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, DEFERRED
 SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF THE DESIGN
 THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION
 AND THAT ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL
 WITHIN A SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL
 ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING
 OFFICIAL. THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE SHALL LIST THE DEFERRED SUBMITTALS
 ON THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE
 BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED SUBMITTAL
 ITEMS SHALL BE SUBMITTED TO THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW
 THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A
 NOTATION INDICATING THAT THE DEFERRED SUBMITTAL
 DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL
 CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED
 SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE
 DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE
 BUILDING OFFICIAL.
  
  
  
  
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2022-07-22 Cont ID  
Sent By rmcphers Date 2022-07-22 Time 09:09 Rev Time 0.00
Received By rmcphers Date 2022-07-22 Time 09:03 Sent To  
Notes
2022-07-22 09:04:46BATTERY STORAGE BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PRODUCT APPROVAL (NOA 22-0216.05) FOR THE ROOFING
 SYSTEM - THE PRODUCT APPROVAL DOES NOT INCLUDE FRP
 PANELS AS AN APPROVED SUBSTRATE.
  
  
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2022-06-23 Cont ID  
Sent By rmcphers Date 2022-06-23 Time 10:37 Rev Time 0.00
Received By rmcphers Date 2022-06-23 Time 10:14 Sent To  
Notes
2022-06-23 10:37:55BATTERY STORAGE BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) WIND DESIGN SHOWN - RISK CATEGORY II WIND SPEED
 167MPH - A RISK CATEGORY II REQUIRES A MINIMUM WIND
 SPEED OF 170MPH - PER FBC WPB SECTION 120.
  
 2) PRODUCT APPROVAL (NOA 22-0216.05) FOR THE ROOFING
 SYSTEM - THE PRODUCT APPROVAL DOES NOT INCLUDE FRP
 PANELS AS AN APPROVED SUBSTRATE.
  
 3) PLEASE PROVIDE DETAILS FOR THE FOUNDATION SLAB FROM
 A DESIGN PROFESSIONAL - SHOW THE WIND DESIGN DATA USED
 ON THE SLAB DRAWINGS FBC 1603.1.4
  
 4) A BUILDING WITH A CONSTRUCTION TYPE OF VB REQUIRES A
 1 HOUR FIRE RATED EXTERIOR WALL WHEN THE SET BACK FROM
 THE PROPERTY LINE IS 5' - PLEASE SEE FBC TABLE 602
  
 5) PLEASE SHOW THE BUILDING OCCUPANCY CLASSIFICATION
 PER FBC CHAPTER 3 - (H) OCCUPANCY CLASSIFICATION
 REQUIRES ADDITIONAL INFORMATION FBC 414.1.3 INFORMATION
 REQUIRED.
 A REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL
 IDENTIFYING THE MAXIMUM EXPECTED QUANTITIES OF
 HAZARDOUS MATERIALS TO BE STORED, USED IN A CLOSED
 SYSTEM AND USED IN AN OPEN SYSTEM, AND SUBDIVIDED TO
 SEPARATELY ADDRESS HAZARDOUS MATERIAL CLASSIFICATION
 CATEGORIES BASED ON TABLES 307.1(1) AND 307.1(2). THE
 METHODS OF PROTECTION FROM SUCH HAZARDS, INCLUDING BUT
 NOT LIMITED TO CONTROL AREAS, FIRE PROTECTION SYSTEMS
 AND GROUP H OCCUPANCIES SHALL BE INDICATED IN THE
 REPORT AND ON THE CONSTRUCTION DOCUMENTS. THE OPINION
 AND REPORT SHALL BE PREPARED BY A QUALIFIED PERSON,
 FIRM OR CORPORATION APPROVED BY THE BUILDING OFFICIAL
 AND PROVIDED WITHOUT CHARGE TO THE ENFORCING AGENCY.
  
 FOR BUILDINGS AND STRUCTURES WITH AN OCCUPANCY IN GROUP
 H, SEPARATE FLOOR PLANS SHALL BE SUBMITTED IDENTIFYING
 THE LOCATIONS OF ANTICIPATED CONTENTS AND PROCESSES SO
 AS TO REFLECT THE NATURE OF EACH OCCUPIED PORTION OF
 EVERY BUILDING AND STRUCTURE.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-02-16 Cont ID  
Sent By rmcphers Date 2022-02-16 Time 09:54 Rev Time 0.00
Received By rmcphers Date 2022-02-16 Time 09:39 Sent To  
Notes
2022-02-16 09:54:40BATTERY STORAGE BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) WIND DESIGN SHOWN - RISK CATEGORY II WIND SPEED
 167MPH - A RISK CATEGORY II REQUIRES A MINIMUM WIND
 SPEED OF 170MPH - PER FBC WPB SECTION 120.
  
 2) ALL PRODUCT APPROVALS NEED TO BE REVIEWED AND MARKED
 APPROVED BY THE BUILDING DESIGNER OF RECORD - FBC WPB
 107.3.4
  
 3) PLEASE PROVIDE THE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE ROOFING SYSTEM.
  
 4) PRODUCT APPROVALS PROVIDED FOR THE EXTERIOR SWING
 DOORS AND OVERHEAD ROLLING DOOR SHOWS ATTACHMENT TO
 WOOD, METAL AND CONCRETE SUBSTRATE - THE ATTACHMENT TO
 FRP FRAMING WILL REQUIRE A SITE SPECIFIC ATTACHMENT
 DETAIL FROM A DESIGN PROFESSIONAL.
  
 5) PLEASE PROVIDE DETAILS FOR THE FOUNDATION SLAB FROM
 A DESIGN PROFESSIONAL - SHOW THE WIND DESIGN DATA USED
 ON THE SLAB DRAWINGS FBC 1603.1.4
  
 6) PLEASE SHOW THE DIMENSIONS FROM THE PROPERTY LINE
 AND OTHER BUILDINGS TO THE SHED - PLEASE PROVIDE A SITE
 PLAN SHOWING THE FOLLOWING INFORMATION 107.2.5 SITE
 PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED WITH THE
 APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY A SITE
 PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF NEW
 CONSTRUCTION AND EXISTING STRUCTURES ON THE SITE,
 DISTANCES FROM LOT LINES, THE ESTABLISHED STREET GRADES
 AND THE PROPOSED FINISHED GRADES, DEPICTING THE
 PROPOSED LOT DRAINAGE AND, AS APPLICABLE, FLOOD HAZARD
 AREAS, FLOODWAYS, AND DESIGN FLOOD ELEVATIONS; AND IT
 SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND
 INCLUDED ON A BOUNDARY LINE SURVEY.
  
 7) PLEASE SHOW THE BUILDING OCCUPANCY CLASSIFICATION
 PER FBC CHAPTER 3 - (H) OCCUPANCY CLASSIFICATION
 REQUIRES ADDITIONAL INFORMATION FBC 414.1.3 INFORMATION
 REQUIRED.
 A REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL
 IDENTIFYING THE MAXIMUM EXPECTED QUANTITIES OF
 HAZARDOUS MATERIALS TO BE STORED, USED IN A CLOSED
 SYSTEM AND USED IN AN OPEN SYSTEM, AND SUBDIVIDED TO
 SEPARATELY ADDRESS HAZARDOUS MATERIAL CLASSIFICATION
 CATEGORIES BASED ON TABLES 307.1(1) AND 307.1(2). THE
 METHODS OF PROTECTION FROM SUCH HAZARDS, INCLUDING BUT
 NOT LIMITED TO CONTROL AREAS, FIRE PROTECTION SYSTEMS
 AND GROUP H OCCUPANCIES SHALL BE INDICATED IN THE
 REPORT AND ON THE CONSTRUCTION DOCUMENTS. THE OPINION
 AND REPORT SHALL BE PREPARED BY A QUALIFIED PERSON,
 FIRM OR CORPORATION APPROVED BY THE BUILDING OFFICIAL
 AND PROVIDED WITHOUT CHARGE TO THE ENFORCING AGENCY.
  
 FOR BUILDINGS AND STRUCTURES WITH AN OCCUPANCY IN GROUP
 H, SEPARATE FLOOR PLANS SHALL BE SUBMITTED IDENTIFYING
 THE LOCATIONS OF ANTICIPATED CONTENTS AND PROCESSES SO
 AS TO REFLECT THE NATURE OF EACH OCCUPIED PORTION OF
 EVERY BUILDING AND STRUCTURE.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-12-27 Cont ID  
Sent By rmcphers Date 2021-12-27 Time 10:02 Rev Time 0.00
Received By rmcphers Date 2021-12-27 Time 09:25 Sent To  
Notes
2021-12-27 09:38:36BATTERY STORAGE BUILDING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) WIND DESIGN SHOWN - RISK CATEGORY II WIND SPEED
 167MPH - A RISK CATEGORY II REQUIRES A MINIMUM WIND
 SPEED OF 170MPH - PER FBC WPB SECTION 120.
  
 2) PLEASE SHOW THE EXTERIOR WALL PANEL ATTACHMENTS OR
 PROVIDE A MIAMI DADE OR FLORIDA STATE PRODUCT APPROVAL
 FBC WPB 107.2.4
  
 3) PLEASE SHOW OR PROVIDE A STATEMENT FOR THE EXTERIOR
 WALL WEATHER PROTECTION - FBC 1403.2 WEATHER
 PROTECTION.
 EXTERIOR WALLS SHALL PROVIDE THE BUILDING WITH A
 WEATHER-RESISTANT EXTERIOR WALL ENVELOPE.
  
 4) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS, EXTERIOR
 DOORS AND ROOFING SYSTEMS. - ALL PRODUCT APPROVALS NEED
 TO BE REVIEWED AND MARKED APPROVED BY THE BUILDING
 DESIGNER OF RECORD - FBC WPB 107.3.4
  
 5) PLEASE PROVIDE A SITE PLAN SHOWING THE FOLLOWING
 INFORMATION 107.2.5 SITE PLAN. THE CONSTRUCTION
 DOCUMENTS SUBMITTED WITH THE APPLICATION FOR PERMIT
 SHALL BE ACCOMPANIED BY A SITE PLAN SHOWING TO SCALE
 THE SIZE AND LOCATION OF NEW CONSTRUCTION AND EXISTING
 STRUCTURES ON THE SITE, DISTANCES FROM LOT LINES, THE
 ESTABLISHED STREET GRADES AND THE PROPOSED FINISHED
 GRADES, DEPICTING THE PROPOSED LOT DRAINAGE AND, AS
 APPLICABLE, FLOOD HAZARD AREAS, FLOODWAYS, AND DESIGN
 FLOOD ELEVATIONS; AND IT SHALL BE DRAWN IN ACCORDANCE
 WITH AN ACCURATE AND INCLUDED ON A BOUNDARY LINE
 SURVEY.
  
 6) PLEASE PROVIDE A SURVEY.
  
 7) PLEASE SHOW THE BUILDING OCCUPANCY CLASSIFICATION
 PER FBC CHAPTER 3 - (H) OCCUPANCY CLASSIFICATION
 REQUIRES ADDITIONAL INFORMATION FBC 414.1.3 INFORMATION
 REQUIRED.
 A REPORT SHALL BE SUBMITTED TO THE BUILDING OFFICIAL
 IDENTIFYING THE MAXIMUM EXPECTED QUANTITIES OF
 HAZARDOUS MATERIALS TO BE STORED, USED IN A CLOSED
 SYSTEM AND USED IN AN OPEN SYSTEM, AND SUBDIVIDED TO
 SEPARATELY ADDRESS HAZARDOUS MATERIAL CLASSIFICATION
 CATEGORIES BASED ON TABLES 307.1(1) AND 307.1(2). THE
 METHODS OF PROTECTION FROM SUCH HAZARDS, INCLUDING BUT
 NOT LIMITED TO CONTROL AREAS, FIRE PROTECTION SYSTEMS
 AND GROUP H OCCUPANCIES SHALL BE INDICATED IN THE
 REPORT AND ON THE CONSTRUCTION DOCUMENTS. THE OPINION
 AND REPORT SHALL BE PREPARED BY A QUALIFIED PERSON,
 FIRM OR CORPORATION APPROVED BY THE BUILDING OFFICIAL
 AND PROVIDED WITHOUT CHARGE TO THE ENFORCING AGENCY.
  
 FOR BUILDINGS AND STRUCTURES WITH AN OCCUPANCY IN GROUP
 H, SEPARATE FLOOR PLANS SHALL BE SUBMITTED IDENTIFYING
 THE LOCATIONS OF ANTICIPATED CONTENTS AND PROCESSES SO
 AS TO REFLECT THE NATURE OF EACH OCCUPIED PORTION OF
 EVERY BUILDING AND STRUCTURE.
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-02-10 Cont ID  
Sent By   Date 2022-02-10 Time   Rev Time 0.00
Received By bdolan Date 2022-02-10 Time 12:32 Sent To  
Notes
2022-02-10 12:36:12THIS PLAN WAS REVIEWED AND APPROVED BY THE FIRE
 DEPARTMENT, WITH THE FOLLOWING COMMENTS:
  
 THE CONTENTS OF THE STORAGE SHED MAY NECESSITATE
 PLACARDING FOR POSSIBLE HAZARDS, TO BE DETERMINED
 DURING FIELD INSPECTION.
  
 PER CITY CODES, ALL WORK IS SUBJECT TO FIELD
 INSPECTIONS AND APPROVAL.
  
 LT. BRIAN DOLAN
 DIVISION OF FIRE PREVENTION
 561-804-4752
 [email protected]
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date   Cont ID  
Sent By   Date 2021-11-22 Time   Rev Time 0.00
Received By jcclark Date 2021-11-22 Time 13:14 Sent To  
Notes
2021-11-22 14:00:56THIS PLAN WAS REVIEWED AND FAILED BY JOSEPH CLARK,
 DIVISION OF FIRE PREVENTION, WITH THE FOLLOWING
 COMMENTS:
 1. NO VISIBLE SITE PLAN IS LOCATED SHOWING WHERE THE
 SHED WILL BE LOCATED IN RELATION TO THE BUILDINGS,
 WHERE HYDRANTS WOULD BE LOCATED, THE PURPOSE OF THE
 SHED ON PROPERTY.
 2. AS PER A CONVERSATION WITH PROVIDENCE ENGINEERING
 CORP., THEY STATED THE KNOWN PURPOSE WAS FOR EV BATTERY
 STORAGE AND OTHER VEHICLE PARTS. PLEASE CONFIRM
 COMPLIANCE WITH NFPA 1 52.3.2.6.4.1.
 3. NO DOCUMENTED SIGNAGE IF FOUND ON THE PLAN NOTES.
 SEE NFPA 52.3.2.6.5.2.
  

Review Stop I INCOMING/PROCESSING
Rev No 7 Status P Date 2022-08-29 Cont ID  
Sent By rmcphers Date 2022-08-29 Time 11:41 Rev Time 0.00
Received By rmcphers Date 2022-08-23 Time 06:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2022-08-18 Cont ID  
Sent By rmcphers Date 2022-08-18 Time 11:32 Rev Time 0.00
Received By rmcphers Date 2022-08-09 Time 16:59 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2022-08-04 Cont ID  
Sent By rmcphers Date 2022-08-04 Time 10:09 Rev Time 0.00
Received By rmcphers Date 2022-07-27 Time 15:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2022-07-22 Cont ID  
Sent By rmcphers Date 2022-07-22 Time 09:13 Rev Time 0.00
Received By rmcphers Date 2022-07-13 Time 16:06 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-06-23 Cont ID  
Sent By rmcphers Date 2022-06-23 Time 10:47 Rev Time 0.00
Received By rmcphers Date 2022-06-08 Time 13:39 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-03-25 Cont ID  
Sent By lmarchan Date 2022-03-25 Time 16:05 Rev Time 0.00
Received By lmarchan Date 2022-02-09 Time 09:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-01-14 Cont ID  
Sent By lmarchan Date 2022-01-14 Time 09:12 Rev Time 0.00
Received By lmarchan Date 2021-11-18 Time 16:45 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 6 Status P Date 2022-08-29 Cont ID  
Sent By rmcphers Date 2022-08-29 Time 11:40 Rev Time 0.00
Received By rmcphers Date 2022-08-29 Time 11:40 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 5 Status P Date 2022-08-04 Cont ID  
Sent By rmcphers Date 2022-08-04 Time 10:06 Rev Time 0.00
Received By rmcphers Date 2022-08-04 Time 10:06 Sent To  
Notes
2022-08-04 10:06:09SEE BUILDING REVIEW

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status F Date 2022-07-22 Cont ID  
Sent By rmcphers Date 2022-07-22 Time 09:13 Rev Time 0.00
Received By rmcphers Date 2022-07-22 Time 09:13 Sent To  
Notes
2022-07-22 09:13:24SEE BUILDING PLAN REVIEW

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status F Date 2022-06-23 Cont ID  
Sent By rmcphers Date 2022-06-23 Time 10:38 Rev Time 0.00
Received By rmcphers Date 2022-06-23 Time 10:38 Sent To  
Notes
2022-06-23 10:38:51SEE BUILDING PLAN REVIEW

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2022-02-16 Cont ID  
Sent By rmcphers Date 2022-02-16 Time 09:55 Rev Time 0.00
Received By rmcphers Date 2022-02-16 Time 09:55 Sent To  
Notes
2022-02-16 10:01:05SEE BUILDING REVIEW

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2021-12-27 Cont ID  
Sent By rmcphers Date 2021-12-27 Time 10:02 Rev Time 0.00
Received By rmcphers Date 2021-12-27 Time 10:02 Sent To  
Notes
2021-12-27 10:02:51SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 7 Status P Date 2022-08-29 Cont ID  
Sent By rmcphers Date 2022-08-29 Time 11:40 Rev Time 0.00
Received By rmcphers Date 2022-08-29 Time 11:40 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 6 Status F Date 2022-08-18 Cont ID  
Sent By rmcphers Date 2022-08-18 Time 11:30 Rev Time 0.00
Received By rmcphers Date 2022-08-18 Time 11:29 Sent To  
Notes
2022-08-18 11:32:34SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) THE FOUNDATION PLAN S000 DOES NOT SHOW AS DIGITALLY
 SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 5 Status F Date 2022-08-04 Cont ID  
Sent By rmcphers Date 2022-08-04 Time 10:05 Rev Time 0.00
Received By rmcphers Date 2022-08-04 Time 10:05 Sent To  
Notes
2022-08-04 10:05:28SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) SIGNED AND SEALED DRAWINGS DO NOT SHOW AS DIGITALLY
 SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status F Date 2022-07-22 Cont ID  
Sent By rmcphers Date 2022-07-22 Time 09:12 Rev Time 0.00
Received By rmcphers Date 2022-07-22 Time 09:12 Sent To  
Notes
2022-07-22 09:12:59SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) SIGNED AND SEALED DRAWINGS DO NOT SHOW AS DIGITALLY
 SIGNED IN ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2022-06-23 Cont ID  
Sent By rmcphers Date 2022-06-23 Time 10:47 Rev Time 0.00
Received By rmcphers Date 2022-06-23 Time 10:47 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-02-16 Cont ID  
Sent By rmcphers Date 2022-02-16 Time 10:15 Rev Time 0.00
Received By rmcphers Date 2022-02-16 Time 10:15 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-12-27 Cont ID  
Sent By rmcphers Date 2021-12-27 Time 10:07 Rev Time 0.00
Received By rmcphers Date 2021-12-27 Time 10:07 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 4 Status P Date 2022-07-15 Cont ID  
Sent By eschneid Date 2022-07-15 Time 14:26 Rev Time 0.25
Received By eschneid Date 2022-07-15 Time 14:16 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 2022-06-16 Cont ID  
Sent By eschneid Date 2022-06-16 Time 11:55 Rev Time 0.25
Received By eschneid Date 2022-06-16 Time 11:26 Sent To  
Notes
2022-06-16 11:55:29FAILED
  
 1) PRIOR TO ZONING APPROVAL OF THIS PERMIT, A LANDSCAPE
 PERMIT FOR THE NEW LANDSCAPE ISLAND INSTALLATION NEEDS
 TO BE SUBMITTED TO THE BUILDING DIVISION.
  
 2) THE PROPOSED BATTERY STORAGE BUILDING SIDE DOOR IS
 SHOWN ON THE LEFT SIDE ON THE FLOOR AND ELEVATION
 PLANS; HOWEVER, THE SITE AND LANDSCAPE PLANS INCLUDE
 THE NOTCH IN THE ISLAND ON THE RIGHT SIDE OF THE
 BUILDING.
  
 EITHER
  
 A, PROVIDE UPDATED SHEETS 100, 200 AND 300 SHOWING THE
 DOOR ON THE OPPOSITE SIDE OF THE BUILDING, OR
  
 B. CORRECT THE SITE AND LANDSCAPE PLANS.TO CORRECTLY
 DEPICT THE DOOR ORIENTATION. NOTE: IF THESE PLANS ARE
 CHANGED, REVISED PLANS WILL NEED TO BE SUBMITTED TO
 PLANNING FOR AN UPDATED MINOR AMENDMENT REVIEW.
  
 CONTACT ERIC SCHNEIDER @ 561 (822-1446)
 [email protected]

Review Stop Z ZONING
Rev No 2 Status F Date 2022-03-25 Cont ID  
Sent By eschneid Date 2022-03-25 Time 13:21 Rev Time 0.00
Received By eschneid Date 2022-03-25 Time 13:21 Sent To  
Notes
2022-03-25 13:22:24ZONING REVIEW ON HOLD UNTIL THE REQUIRED PLANNED
 DEVELOPMENT AMENDMENT IS SUBMITTED AND REVIEWED.

Review Stop Z ZONING
Rev No 1 Status F Date 2022-01-13 Cont ID  
Sent By eshneide Date 2022-01-13 Time 17:15 Rev Time 0.25
Received By eschneid Date 2022-01-13 Time 17:14 Sent To  
Notes
2022-01-13 17:20:41FAILED
  
 1) PROVIDE A SURVEY AND A SITE PLAN SHOWING WHERE THE
 PROPOSED STRUCTURE IS TO BE LOCATED.
  
 2) THE ADDITION OF A STRUCTURE ON THE PROPERTY REQUIRES
 THE SUBMITTAL TO AND APPROVAL BY THE PLANNING DIVISION
 OF A PLANNED DEVELOPMENT AMENDMENT.
  
 3) DESCRIBE THE EXACT USE OF THE BUILDING. THE USE OF
 THE BUILDING WILL DETERMINE IF THE PLANNED DEVELOPMENT
 AMENDMENT CAN BE PROCESSED AT STAFF LEVEL OR REQUIRES
 CITY COMMISSION APPROVAL.
  
 4) ADDITIONAL ZONING COMMENTS WILL BE ISSUED WHEN THE
 INFORMATION REQUIRED IN COMMENTS #1 AND #3 IS PROVIDED.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]