| 2021-11-23 09:06:23 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR EMAIL [email protected] AND REQUEST |
| | THAT IT BE CONVERTED TO PROJECTDOX. |
| | |
| | 1. SUBMITTED PRODUCT APPROVAL FL1654-R27 HAS BEEN |
| | REVISED TO FL1654-R28. PROVIDE THE FOLLOWING: COVER |
| | PAGE, EVALUATION REPORTS PAGES 1-5 TO INCLUDE |
| | LIMITATIONS PAGE(S) AND INSTALLATION INSTRUCTIONS FOR |
| | SYSTEM USED. SELECT SYSTEM THAT MEETS OR EXCEEDS |
| | EXPOSURE CATEGORY C MINIMUM DESIGN PRESSURE ZONE 3 |
| | REQUIREMENTS OF -108.17. SIGNED AND SEALED NAILING |
| | CALCULATIONS MAY BE REQUIRED. |
| | 2. SUBMITTED PRODUCT APPROVAL FL2569-R20 HAS BEEN |
| | REVISED TO FL2569-R23. PLEASE PROVIDE A COMPLETE SET. |
| | ALL APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| | IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| | AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| | APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. AS PER |
| | RULE 61G20-3. |
| | 3. FBC B 107.2.1 FOR CLARITY PLEASE PROVIDE A ROOF |
| | DIAGRAM/SKETCH WITH THE AREAS TO RECEIVE NEW ROOFING |
| | CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF SLOPE(S), |
| | ROOF HEIGHT. |
| | 4. WPB A 109.3 BUILDING PERMIT VALUATIONS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, |
| | QUANTITY ESTIMATES. VALUE TO INCLUDE LABOR AND |
| | MATERIALS, ARCHITECTURAL AND DESIGN FEES, OVERHEAD AND |
| | PROFIT. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMEMTS. |
| | |