| Plan Review Stops For Permit 21110176 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2021-12-01 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2021-12-01 |
Time |
10:53 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2021-12-01 |
Time |
10:53 |
Sent To |
|
|
| Notes |
| 2021-12-01 10:58:31 | ADDRESS IS CORRECT FOR THE PROJECT |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2022-05-12 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-05-12 |
Time |
08:29 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-05-12 |
Time |
06:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2022-04-12 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-04-12 |
Time |
13:57 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-04-12 |
Time |
09:20 |
Sent To |
|
|
| Notes |
| 2022-04-12 16:12:41 | SECOND BUILDING AUDIT FOR PERMIT #21110176 | | | PRIVATE PROVIDER | | | SEC. 553.791 F.S. | | | | | | NEW SINGLE FAMILY RESIDENCE | | | CODE IN EFFECT: FBC-RESIDENTIAL,7TH EDITION, 2020. | | | | | | ORIGINAL COMMENT: | | | 1- ROOF SHEATHING NAILING SPACING SPECIFIED ON SHEET | | | S-2 DOESN'T COMPLY WITH TABLE R803.2.3.1 | | | FBC-RESIDENTIAL. REVISE AS REQUIRED. | | | | | | RESPONSE: | | | (A)REPEAT COMMENT. ROOF SHEATHING NAILING SPACING | | | SPECIFICATIONS SHOWN ON THE RIGHT HAND SIDE OF ROOF | | | DIAGRAMS STILL DON'T COMPLY WITH TABLE R803.2.3.1 | | | FBC-RESIDENTIAL. SEE TABLE AND REVISE AS REQUIRED. | | | | | | (B)ROOF SHEATHING NAILING SPACING SPECIFICATIONS SHOWN | | | ON THE RIGHT HAND SIDE OF ROOF DIAGRAMS IS MISSING ROOF | | | ZONE 2N. | | | SEC. R803.2.3.1 FBC-RESIDENTIAL. | | | | | | (C)ROOF SHEATHING NAILING SPACING SPECIFICATIONS SHOWN | | | ON THE RIGHT HAND SIDE OF ROOF DIAGRAMS ARE SHOWING TWO | | | DIFFERENT NAILING SPACING SPECIFICATIONS FOR ROOF ZONE | | | 2E AND 2R. THIS IS NO CLEAR. PROVIDE ONLY ONE NAILING | | | SPECIFICATION TO AVOID CONFLICTS. SEC. 107.2.1 CITY | | | AMENDMENTS. | | | | | | 2- OK. | | | 3- OK. | | | 4- OK. | | | | | | ORIGINAL COMMENT: | | | 5- WIND DESIGN INFORMATION ON SHEET A-1 IS NOT CLEAR. | | | ULTIMATE WIND SPEED AND NOMINAL WIND SPEED UNDER WALL | | | PRESSURES DON'T MATCH THE ULTIMATE WIND SPEED AND | | | NOMINAL WIND SPEED UNDER WIND DESIGN BASIS SHOWN ON THE | | | SAME SHEET. REVISE/CLARIFY AS REQUIRED. WHICH ONE IS | | | THE CORRECT DESIGN CRITERIA FOR THIS HOUSE? SEC. | | | R301.2.1 FBC-RESIDENTIAL. | | | NOTE: REVISE WINDOWS/DOORS DESIGN PRESSURES ACCORDINGLY | | | TO AVOID CONFLICTS/DELAYS. | | | | | | RESPONSE: | | | ONE OF THE WINDOWS "C" ON BEDROOM #2 IS LOCATED IN ZONE | | | 5. THEREFORE, THE DESIGN PRESSURES FOR THIS WINDOW IS | | | INCORRECT AS SPECIFIED ON THE WINDOW SCHEDULE AND | | | PRODUCT APPROVAL SUBMITTAL AFFIDAVIT UNDER "DESIGN | | | PRESSURES". REVISE AS REQUIRED. | | | | | | 6- ENERGY CALCULATIONS: | | | A)OK. | | | | | | ORIGINAL COMMENT: | | | B)DOOR INFORMATION SPECIFIED ON PAGE 3 DOESN'T MATCH | | | PLANS AND PRODUCT APPROVALS. SEC. R101.5.1.1.2 | | | FBC-ENERGY CONSERVATION. REVISE AS REQUIRED. THERE IS | | | NOT INSULATED DOOR ON THE SOUTH SIDE. THIS IS A | | | METAL/GLASS FRENCH DOOR. NOTE: GLAZING IN DOORS NEEDS | | | TO BE INCLUDED IN THE WINDOW GLAZING AREA. SEE SEC. | | | R405.5.3 FBC-ENERGY CONSERVATION. | | | | | | RESPONSE: | | | REPEAT COMMENT. DOOR ON THE SOUTH SIDE WAS CHANGED TO | | | WOOD. PLANS AND PRODUCT APPROVAL SUBMITTED DON'T | | | SPECIFY WOOD DOOR. REVISE AS REQUIRED. | | | NOTE: A METAL DOOR (2.67'X 8.0') WAS ADDED TO THE | | | WINDOW LIST, THEN IT IS NOT CLEAR WHERE IS THE WOOD | | | DOOR LOCATED AT. PLEASE CHECK, REVISE AS REQUIRED TO | | | AVOID CONFLICTS. SEC. R101.5.1.1.2 FBC-ENERGY | | | CONSERVATION. | | | | | | ORIGINAL COMMENT: | | | C)WINDOW OVERHANG DEPTH AND SEPARATION INFORMATION | | | SHOWN ON PAGE 3 DOESN'T MATCH PLANS. SEC. R101.5.1.1.2 | | | FBC-. ENERGY CONSERVATION. REVISE AS REQUIRED TO MATCH. | | | | | | RESPONSE: | | | REPEAT COMMENT. WINDOW OVERHANG DEPTH AND SEPARATION | | | INFORMATION DOESN'T MATCH PLANS. SEE FRONT ELEVATION | | | AND REVISE AS REQUIRED. | | | | | | ORIGINAL COMMENT: | | | D)WINDOW AREA SHOWN ON PAGE 3 DOESN'T MATCH PLANS. SEC. | | | R101.5.1.1.2 FBC-. ENERGY CONSERVATION. REVISE AS | | | REQUIRED TO MATCH. | | | | | | RESPONSE: | | | REPEAT COMMENT. WINDOW AREA FOR BEDROOM #2 DOESN'T | | | MATCH PLANS. REVISE AS REQUIRED TO MATCH. | | | | | | | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2022-02-24 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-02-24 |
Time |
13:34 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-02-24 |
Time |
08:38 |
Sent To |
|
|
| Notes |
| 2022-02-24 13:38:59 | BUILDING AUDIT FOR PERMIT #21110176 | | | PRIVATE PROVIDER | | | SEC. 553.791 F.S. | | | | | | NEW SINGLE FAMILY RESIDENCE | | | CODE IN EFFECT: FBC-RESIDENTIAL,7TH EDITION, 2020. | | | | | | 1- ROOF SHEATHING NAILING SPACING SPECIFIED ON SHEET | | | S-2 DOESN'T COMPLY WITH TABLE R803.2.3.1 | | | FBC-RESIDENTIAL. REVISE AS REQUIRED. | | | | | | 2- GABLE END UPLIFT DIAGRAM SHOWN ON SHEET S-2 DOESN'T | | | MATCH ROOF ZONES ZONES SPECIFIED ON FIGURE R301.2(7) | | | FBC-RESIDENTIAL. REVISE AS REQUIRED. | | | | | | 3- PLANS DON'T PROVIDE SPECIFICATIONS SHOWING HOW | | | COMPLYING WITH THE NEW 2020 CODE REQUIREMENT FOR | | | ROOFING UNDERLAYMENT SEC. R905.1.1.1 FBC-RESIDENTIAL. | | | NOTE: CLEARLY SPECIFY WHICH METHOD OF SEC. R905.1.1.1 | | | FBC-RESIDENTIAL IS GOING TO BE USED. AND PROVIDE | | | PRODUCT APPROVAL AS REQUIRED BY F.A.C. 61G20-3.001 | | | | | | 4-STUCCO SPECIFICATIONS ON THE TYPICAL GABLE END DETAIL | | | AND WALL SECTIONS ON SHEET A-3 DON'T COMPLY WITH SEC. | | | R703.7.3 FBC-RESIDENTIAL. NEED TO SPECIFY TWO WATER | | | RESISTIVE BARRIERS WHEN STUCCO IS APPLIED TO WOOD. | | | | | | 5- WIND DESIGN INFORMATION ON SHEET A-1 IS NOT CLEAR. | | | ULTIMATE WIND SPEED AND NOMINAL WIND SPEED UNDER WALL | | | PRESSURES DON'T MATCH THE ULTIMATE WIND SPEED AND | | | NOMINAL WIND SPEED UNDER WIND DESIGN BASIS SHOWN ON THE | | | SAME SHEET. REVISE/CLARIFY AS REQUIRED. WHICH ONE IS | | | THE CORRECT DESIGN CRITERIA FOR THIS HOUSE? SEC. | | | R301.2.1 FBC-RESIDENTIAL. | | | NOTE: REVISE WINDOWS/DOORS DESIGN PRESSURES ACCORDINGLY | | | TO AVOID CONFLICTS/DELAYS. | | | | | | 6- ENERGY CALCULATIONS: | | | A)ROOF TYPE SPECIFIED ON PAGE 2 DOESN'T MATCH PLANS. | | | THIS IS A HIP ROOF. REVISE AS REQUIRED. REVISE AS | | | REQUIRED. SEC. R101.5.1.1.2 FBC-RESIDENTIAL. | | | | | | B)DOOR INFORMATION SPECIFIED ON PAGE 3 DOESN'T MATCH | | | PLANS AND PRODUCT APPROVALS. SEC. R101.5.1.1.2 | | | FBC-ENERGY CONSERVATION. REVISE AS REQUIRED. THERE IS | | | NOT INSULATED DOOR ON THE SOUTH SIDE. THIS IS A | | | METAL/GLASS FRENCH DOOR. NOTE: GLAZING IN DOORS NEEDS | | | TO BE INCLUDED IN THE WINDOW GLAZING AREA. SEE SEC. | | | R405.5.3 FBC-ENERGY CONSERVATION. | | | | | | C)E) WINDOW OVERHANG DEPTH AND SEPARATION INFORMATION | | | SHOWN ON PAGE 3 DOESN'T MATCH PLANS. SEC. R101.5.1.1.2 | | | FBC-. ENERGY CONSERVATION. REVISE AS REQUIRED TO MATCH. | | | | | | D)WINDOW AREA SHOWN ON PAGE 3 DOESN'T MATCH PLANS. SEC. | | | R101.5.1.1.2 FBC-. ENERGY CONSERVATION. REVISE AS | | | REQUIRED TO MATCH. | | | | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2022-02-23 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-02-23 |
Time |
11:26 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-02-23 |
Time |
11:21 |
Sent To |
|
|
| Notes |
| 2022-02-23 11:26:51 | ELECTRICAL AUDIT COMPLETE JLEAHY |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
10 |
Status |
N |
Date |
2022-05-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-05-18 |
Time |
09:53 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-05-13 |
Time |
15:28 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
9 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-05-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-05-06 |
Time |
07:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
8 |
Status |
N |
Date |
2022-04-27 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-04-27 |
Time |
13:17 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-04-26 |
Time |
06:21 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2022-04-12 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-04-12 |
Time |
16:13 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-04-05 |
Time |
07:07 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2022-03-29 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-03-29 |
Time |
12:47 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-03-23 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2022-03-03 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-03-03 |
Time |
06:58 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-02-11 |
Time |
08:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2022-02-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-02-11 |
Time |
08:01 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-01-26 |
Time |
09:51 |
Sent To |
|
|
| Notes |
| 2022-02-04 09:37:23 | ZONING REVIEW REQUIRED FOR NEW SHEETS PRIOR TO ROUTING | | | TO BUILDING DIVISION AUDIT . ZONING PASSED 12/27/21, | | | SHEETS C1, M1 UPLOADED 1/17/22 AND 1/18/22 - SH | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-01-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-01-21 |
Time |
09:19 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-01-18 |
Time |
17:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-01-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-01-03 |
Time |
16:32 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2021-12-27 |
Time |
11:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-12-27 |
Time |
|
Rev Time |
0.00 |
| Received By |
cdecoeur |
Date |
2021-11-29 |
Time |
10:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2022-04-05 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-04-05 |
Time |
08:53 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-03-23 |
Time |
08:19 |
Sent To |
|
|
| Notes |
| 2022-04-05 08:53:35 | RECEIPT MU-2022-014700 - $0.00 DUE | | 2022-03-23 08:19:30 | 3/23/22 EMAILED IMPACT OFFICE FOR REVIEW. LEM |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2021-12-27 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-12-27 |
Time |
07:52 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-12-27 |
Time |
07:52 |
Sent To |
|
|
| Notes |
| 2021-12-27 07:53:57 | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION WILL OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM | | | CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS | | | TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2022-04-11 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-04-11 |
Time |
06:00 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-04-11 |
Time |
06:00 |
Sent To |
|
|
| Notes |
| 2022-04-11 06:01:18 | MECHANICAL AUDIT APPROVED ME |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2022-04-08 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-04-08 |
Time |
11:08 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-04-08 |
Time |
11:08 |
Sent To |
|
|
| Notes |
| 2022-04-08 11:09:19 | MECHANICAL AUDIT APPROVED ME |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2022-03-03 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-03-03 |
Time |
06:57 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-03-03 |
Time |
06:57 |
Sent To |
|
|
| Notes |
| 2022-03-03 06:58:00 | MECHANICAL AUDIT APPROVED. ME |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2022-02-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2022-02-23 |
Time |
09:45 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2022-02-23 |
Time |
09:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
8 |
Status |
P |
Date |
2022-05-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-05-18 |
Time |
09:53 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-05-18 |
Time |
09:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
7 |
Status |
P |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-05-07 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2022-05-07 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
6 |
Status |
F |
Date |
2022-04-27 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-04-27 |
Time |
13:02 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-04-27 |
Time |
09:46 |
Sent To |
|
|
| Notes |
| 2022-04-27 13:17:31 | PRIVATE PROVIDER SEC. 553.791 F.S. | | | | | | PRIVATE PROVIDER PLAN REVIEW COMPLIANCE AFFIDAVIT | | | SIGNED ON 4/25/2022 AND DRAWING A-1 LIST THERMATRU | | | FLORIDA PRODUCT APPROVAL FL21138.1. | | | A DIFFERENT PRODUCT APPROVAL FL-21138.21 WAS VERSIONED | | | IN PROJECTDOX ON 4/20/2022 BY NICHOLIS HEINE. UPLOADED | | | PRODUCT APPROVAL, AFFIDAVIT AND ARCHITECT'S | | | SPECIFICATIONS NEED TO MATCH. | | | | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
5 |
Status |
P |
Date |
2022-04-08 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2022-04-08 |
Time |
11:00 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2022-04-08 |
Time |
11:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
4 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-03-29 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2022-03-29 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-03-29 12:46:59 | PP AFFIDAVIT AUDIT | | | | | | 1) SUPPORTING DOCUMENT- NOA NO. 17-1212.21 EXPIRED ON | | | 12/27/2021 (THIS IS NOT A TURN DOWN FOR THE AFFIDAVIT | | | BUT RATHER A NOTE TO HELP WITH THE BUILDING AUDIT) | | | 2) THE AHRI SHEET IN THE SUPPORTING DOCUMENTS IS NOT ON | | | THE PP AFFIDAVIT. | | | 3) THE PRODUCT APPROVALS MENTIONED ON THE A-1 SHEET | | | DOES NOT MATCH THE NOA?S SUBMITTED IN THE SUPPORTING | | | DOCUMENTS. | | | 4) THE SURVEY SUBMITTED IN THE DRAWINGS FOLDER IS NOT | | | LISTED ON THE PP AFFIDAVIT. | | | 5) SHEET S-1 DOES NOT HAVE A REVISION DATE. | | | 6) SHEET S-2 DOES HAVE A REVISION DATE OF 03/06/2022 | | | BUT THIS SHEET IS NOT LISTED ON THE PP AFFIDAVIT. | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
3 |
Status |
P |
Date |
2022-02-14 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-02-14 |
Time |
11:07 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-02-14 |
Time |
10:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
2 |
Status |
F |
Date |
2022-01-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2022-01-21 |
Time |
09:13 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2022-01-21 |
Time |
09:13 |
Sent To |
|
|
| Notes |
| 2022-01-21 09:19:16 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FS553.791(1)H | | | | | | SHEET SP-1, SURVEY, AND SURVEY SITE PLAN WERE SUBMITTED | | | BUT DO NOT APPEAR ON THE AFFIDAVIT. EITHER HAVE THE | | | DOCUMENT(S) REMOVED OR INCLUDE ON THE AFFIDAVIT. | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
| Rev No |
1 |
Status |
F |
Date |
2021-11-24 |
|
|
Cont ID |
|
| Sent By |
dbattles |
Date |
2021-11-24 |
Time |
08:31 |
Rev Time |
0.00 |
| Received By |
dbattles |
Date |
2021-11-24 |
Time |
08:31 |
Sent To |
|
|
| Notes |
| 2021-11-24 08:31:57 | CREDENTIALS-OK | | | REVIEW PRIVATE PROVIDER PLAN REVIEW AFFIDAVIT UPON | | | OTHER AGENCY APPROVALS. | | | DYLAN BATTLES | | | 561-805-6718 | | | [email protected] | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2022-02-23 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-02-23 |
Time |
18:24 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-02-23 |
Time |
18:23 |
Sent To |
|
|
| Notes |
| 2022-02-23 18:26:57 | 1)SHINGLES NOA 20-0527.05 | | | 2)ROOF HIP & RIDGE NOA 21-0112.01. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
4 |
Status |
P |
Date |
2022-05-18 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-05-18 |
Time |
09:43 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-05-18 |
Time |
09:43 |
Sent To |
|
|
| Notes |
| 2022-05-18 09:43:49 | ALL DRAWINGS DIGITALLY SIGNED. JG. |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
F |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2022-05-12 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2022-05-12 |
Time |
|
Sent To |
|
|
| Notes |
| 2022-05-12 08:48:51 | FS481, THE NEW PAGES SUBMITTED ARE NOT DIGITALLY SIGNED | | | AS REQUIRED BY FLORIDA STATUTE. | | | | | | DOCUMENTS PREPARED BY AN ARCHITECT AND SUBMITTED FOR | | | PUBLIC RECORD ARE TO BE SIGNED, SEALED, DATED | | | ORIGINALS. | | | | | | CHECK ALL PAGES. | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-02-23 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2022-02-23 |
Time |
18:23 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2022-02-23 |
Time |
18:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2022-01-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2022-01-03 |
Time |
13:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2022-01-03 |
Time |
13:28 |
Sent To |
|
|
| Notes |
| 2022-01-03 13:29:27 | ARCHITECT'S DIGITAL SIGNATURE IS VERIFIED. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-02-11 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2022-02-11 |
Time |
09:38 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2022-02-11 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-12-27 |
|
|
Cont ID |
|
| Sent By |
av |
Date |
2021-12-27 |
Time |
13:48 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2021-12-27 |
Time |
13:48 |
Sent To |
|
|
| Notes |
|
|