|
 |
 |
 |
 |
 |
Plan Review Details - Permit 21101190
| Plan Review Stops For Permit 21101190 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-12-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-12-21 |
Time |
09:33 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-12-21 |
Time |
09:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2021-11-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-11-09 |
Time |
09:14 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-11-09 |
Time |
09:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-01-03 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-01-03 |
Time |
11:28 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-01-03 |
Time |
11:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-12-06 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-12-06 |
Time |
20:06 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2021-12-06 |
Time |
19:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2021-11-03 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-11-03 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-10-29 |
Time |
12:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-01-03 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-01-03 |
Time |
11:28 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2021-12-07 |
Time |
12:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
P |
Date |
2021-12-06 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2021-12-06 |
Time |
20:06 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2021-10-26 |
Time |
17:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2021-11-04 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-11-04 |
Time |
16:52 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-11-04 |
Time |
16:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2021-12-23 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2021-12-23 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2021-12-23 |
Time |
11:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2021-11-08 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2021-11-08 |
Time |
12:22 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2021-11-08 |
Time |
10:47 |
Sent To |
|
|
| Notes |
| 2021-11-08 12:22:54 | 1ST REVIEW FBC-2020 PLUMBING | | | PERMIT- 21101190 | | | 11/8/21 | | | | | | CODES IN EFFECT: | | | FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 | | | FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020 | | | FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION | | | 2020 | | | FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020 | | | FS- FLORIDA STATUTES | | | FAC- FLORIDA ADMINISTRATIVE CODE | | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | | | PLAN REVIEW RESULTS: DENIED. | | | | | | 1) SHEET A301: THE REVISED RESTROOM FLOOR PLANS SHOW | | | THE DOORS SWINGING INTO THE CLEAR FLOOR SPACES FOR THE | | | LAVATORIES WHICH IS NOT ALLOWED PER SECTION 603.2.3 FBC | | | ACC. PLEASE SEE EXCEPTION 2 FOR ADDITIONAL INFORMATION. | | | 2) A701 SANITARY RISER: THE WATER CLOSET AND LAVATORY | | | LOCATIONS IN THE EXECUTIVE RESTROOMS NEED TO BE | | | SWITCHED TO BE CONSISTENT WITH THE CHANGES IN THE FLOOR | | | PLANS- SECTION 107.2.1 WPB. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL/PLUMBING PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-12-21 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-12-21 |
Time |
09:33 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-12-21 |
Time |
09:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-11-09 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-11-09 |
Time |
09:14 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-11-09 |
Time |
09:14 |
Sent To |
|
|
| Notes |
| 2021-11-09 09:16:52 | SIGNATURE REVIEW | | | | | | DRAWINGS E-501, E-503, E-603 DO NOT SHOW AS DIGITALLY | | | SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |