Plan Review Details - Permit 21101181
Plan Review Stops For Permit 21101181
Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status P Date 2022-08-04 Cont ID  
Sent By scwelter Date 2021-10-27 Time 16:11 Rev Time 0.00
Received By scwelter Date 2022-08-04 Time 14:46 Sent To  
Notes
2022-08-04 14:46:00MASTER PERMIT 21091104 = PASSED
2021-10-27 16:12:26MASTER PERMIT - 21091104 - SUBJECT TO PUBLIC ART

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-04-03 Cont ID  
Sent By rmcphers Date 2023-04-03 Time 10:40 Rev Time 0.00
Received By rmcphers Date 2023-04-03 Time 10:40 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-09-15 Cont ID  
Sent By rmcphers Date 2022-09-15 Time 16:02 Rev Time 0.00
Received By rmcphers Date 2022-09-15 Time 16:02 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-12-14 Cont ID  
Sent By rmcphers Date 2021-12-14 Time 12:45 Rev Time 0.00
Received By rmcphers Date 2021-12-14 Time 11:31 Sent To  
Notes
2021-12-14 12:45:29BUILDING ADDITION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE NEW EXTERIOR WINDOWS, DOORS,
 ROOFING SYSTEM, ETC. ALL PRODUCT APPROVALS NEED TO BE
 REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER
 OF RECORD. FBC WPB 107.3.4
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-09-26 Cont ID  
Sent By jleahy Date 2022-09-26 Time 09:53 Rev Time 0.00
Received By jleahy Date 2022-09-23 Time 11:52 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-12-21 Cont ID  
Sent By jleahy Date 2021-12-21 Time 16:26 Rev Time 0.00
Received By jleahy Date 2021-12-21 Time 16:16 Sent To  
Notes
***NONE***

Review Stop E-LOWVOLT ELECTRICAL LOW VOLTAGE
Rev No 1 Status N Date 2022-09-26 Cont ID  
Sent By jleahy Date 2022-09-26 Time 09:53 Rev Time 0.00
Received By jleahy Date 2022-09-26 Time 09:53 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2023-03-30 Cont ID  
Sent By lquinone Date 2023-03-30 Time 09:15 Rev Time 0.00
Received By lquinone Date 2023-03-30 Time 09:17 Sent To  
Notes
2023-03-30 09:16:36ENGINEERING SUBMITTALL REVIEW- PASSED

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2022-08-29 Cont ID  
Sent By rrossano Date 2022-08-29 Time   Rev Time 0.00
Received By rrossano Date 2022-08-29 Time   Sent To  
Notes
2022-08-29 09:32:56UNDER FORMAL ENGINEERING SUBMITTAL REVIEW.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-11-08 Cont ID  
Sent By rrossano Date 2021-11-08 Time   Rev Time  
Received By rrossano Date 2021-11-08 Time   Sent To  
Notes
2021-11-08 11:44:35PLEASE PROVIDE STATUS OF SITE PLAN APPROVAL.
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2022-08-25 Cont ID  
Sent By pleduc Date 2022-08-25 Time   Rev Time 0.00
Received By pleduc Date 2022-08-25 Time 15:19 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-10-28 Cont ID  
Sent By pleduc Date 2021-10-28 Time   Rev Time 0.00
Received By pleduc Date 2021-10-28 Time 16:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-04-05 Cont ID  
Sent By lmarchan Date 2023-04-05 Time 12:15 Rev Time 0.00
Received By lmarchan Date 2023-03-29 Time 12:32 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-10-11 Cont ID  
Sent By lmarchan Date 2022-10-11 Time 11:22 Rev Time 0.00
Received By lmarchan Date 2022-08-24 Time 16:58 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-01-14 Cont ID  
Sent By lmarchan Date 2022-01-14 Time 14:30 Rev Time 0.00
Received By lmarchan Date 2021-10-27 Time 06:36 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2023-04-05 Cont ID  
Sent By aoliver Date 2023-04-05 Time 16:57 Rev Time 0.00
Received By aoliver Date 2022-10-11 Time 11:28 Sent To  
Notes
2023-04-06 10:19:51EXEMPT FROM IMPACT FEES. SEE EMAIL UPLOADED
2022-10-11 11:28:4510/11/22 EMAILED IMPACT OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2021-12-14 Cont ID  
Sent By rmcphers Date 2021-12-14 Time 12:47 Rev Time 0.00
Received By rmcphers Date 2021-12-14 Time 12:47 Sent To  
Notes
2021-12-14 12:48:39PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2022-09-06 Cont ID  
Sent By medwards Date 2022-09-06 Time 10:55 Rev Time 0.00
Received By medwards Date 2022-09-06 Time 10:55 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2021-11-22 Cont ID  
Sent By medwards Date 2021-11-22 Time 09:14 Rev Time 0.00
Received By medwards Date 2021-11-22 Time 09:14 Sent To  
Notes
2021-11-22 09:15:061ST REVIEW FBC-2020 MECHANICAL
 PERMIT-21101181
  
 CODES IN EFFECT:
  
 FBC B- FLORIDA BUILDING CODE
 FBC M- FLORIDA MECHANICAL CODE
 FBC EC- FLORIDA ENERGY CONSERVATION
 FBC FG- FLORIDA FUEL GAS
 FBC EX- FLORIDA EXISTING BUILDING CODE
 FBC RES- FLORIDA RESIDENTIAL BUILDING CODE
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE SHOW THE CONDENSATE DRAIN TERMINATION
 LOCATION. FBC M 307
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
 MICHAEL EDWARDS
 MECHANICAL EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL. 33401
 561-805-6728
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status P Date 2022-09-08 Cont ID  
Sent By ccole Date 2022-09-08 Time 16:08 Rev Time 0.00
Received By ccole Date 2022-09-08 Time 15:17 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-12-01 Cont ID  
Sent By ccole Date 2021-12-01 Time 17:53 Rev Time 0.00
Received By ccole Date 2021-12-01 Time 16:31 Sent To  
Notes
2021-12-01 17:54:101ST REVIEW FBC-2020 PLUMBING
 PERMIT- 21101181
 12/1/2021
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EC- FLORIDA ENERGY CONSERVATION CODE 7TH EDITION
 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) SHEET A-110 & A-420: SHOW THE CLEAR FLOOR SPACE
 DIAGRAMS AND DIMENSIONS FOR THE 3 NEW SINKS IN THE GAME
 ROOM, ARTS/CRAFT ROOM, AND THE 2-COMPARTMENT IN THE
 CLOSET- SECTION 606.2 FBC ACC.
  
 2) A-420: THE HEIGHT OF THE NEW GAME ROOM SINK FROM THE
 FINISHED FLOOR SHALL BE 34 INCHES, NOT 36 INCHES-
 SECTION 606.3 FBC ACC.
  
 3) A-420: PLEASE PROVIDE ELEVATION HEIGHT DETAILS FOR
 THE ARTS/CRAFT AND 2 COMPARTMENT SINKS- SECTION 606.3
 FBC ACC.
  
 4) P0.1 & P1.1: SUBMIT MANUFACTURER'S SPECIFICATIONS
 FOR THE NEW SINKS AND THE SEDIMENT TRAP- SECTION
 107.2.1 WPB. PLEASE NOTE A COMPLETE REVIEW OF THE
 PLUMBING SYSTEMS CANNOT BE COMPLETED WITHOUT THE
 SEDIMENT TRAP SPECS. PLEASE INDICATE WHAT TYPE OF
 SUBSTANCES WILL BE DRAINED INTO THE TRAP- SECTION
 1003.1 FBC P.
  
 5) P1.1: PROVIDE A SLAB REPAIR DETAIL- SECTION 107.2.1
 WPB.
  
 6) A1.30: PLEASE PROVIDE CIVIL PLANS SHOWING THE
 DISCHARGE LOCATIONS OF THE DOWNSPOUTS TO APPROVED
 DRAINAGE LOCATIONS SUCH STORM DRAINS, CATCH BASINS OR
 TO GRADED AREAS- SECTION 1101.2 FBC P.
  
 7) A5.20: PROVIDE DOWNSPOUT CONNECTION SUPPORT AND
 TERMINATION DETAILS. PLEASE NOTE THE SPOUTS SHALL
 TERMINATE NOT LESS THAN 1 FT. FROM THE BUILDING- 1101.6
 FBC P.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status N Date 2022-09-15 Cont ID  
Sent By rmcphers Date 2022-09-15 Time 16:05 Rev Time 0.00
Received By rmcphers Date 2022-09-15 Time 16:05 Sent To  
Notes
2022-09-15 16:06:14ROOFING SYSTEM TO BE DEFERRED

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2021-12-14 Cont ID  
Sent By rmcphers Date 2021-12-14 Time 12:47 Rev Time 0.00
Received By rmcphers Date 2021-12-14 Time 12:47 Sent To  
Notes
2021-12-14 12:47:47SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-04-03 Cont ID  
Sent By rmcphers Date 2023-04-03 Time 10:42 Rev Time 0.00
Received By rmcphers Date 2023-04-03 Time 10:42 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-09-15 Cont ID  
Sent By rmcphers Date 2022-09-15 Time 16:14 Rev Time 0.00
Received By rmcphers Date 2022-09-15 Time 16:14 Sent To  
Notes
2022-09-06 10:56:03MECHANICAL DIGITAL SIGNATURES APPROVED ME

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-10-29 Cont ID  
Sent By ptharpe Date 2021-10-29 Time 07:12 Rev Time 0.00
Received By ptharpe Date 2021-10-29 Time 07:09 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2022-10-11 Cont ID  
Sent By jroach Date 2022-10-11 Time 10:05 Rev Time 0.00
Received By jroach Date 2022-10-11 Time 10:01 Sent To  
Notes
2022-10-11 10:06:18ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 10.11.2022
 PERMIT NO.: 21101181
 ________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. SEPARATE PERMITS REQUIRED FOR:
  
 1.1. LANDSCAPING
 1.2. FENCING/GATES
 1.3. SITE/PRIVACY WALLS
 1.4. SITE LIGHTING
 1.5. IRRIGATION
 1.6. GENERATOR
 1.7. SIGNAGE
 1.8. PARING LOT / STRIPING / HARDSCAPE
 1.9. SITE FIXTURES (I.E. BIKE RACKS, ETC.)
  
 2. AT THE TIME OF SUBMITTAL OF THE PERMIT APPLICATION
 FOR FENCING/GATES SURROUNDING THE A/C EQUIPMENT
 PADS/AREA TO THE WEST OF THE PROPOSED GYMNASIUM, PLEASE
 NOTE THAT THIS EQUIPMENT NEEDS TO BE SCREENED FROM VIEW
 WITH A WALL OR OPAQUE FENCE CONSISTING OF BRICK,
 DECORATIVE CONCRETE, OTHER DECORATIVE MASONRY, OR
 COMPARABLY DURABLE WOOD/STEEL. CHAIN LINK FENCING WITH
 SLATS DOES NOT COMPLY WITH THIS REQUIREMENT.
  
 3. AT THE TIME OF SUBMITTAL OF THE PERMIT APPLICATION
 FOR THE BIKE RACKS, PLEASE NOTE THAT THE TYPE AND
 SPACING OF THE RACKS SHALL COMPLY WITH THE CITY?S
 STANDARDS AND DETAIL. PLEASE CONTACT THE CITY?S
 PLANNING DIVISION TO OBTAIN THE MINIMUM SPECIFICATIONS.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  

Review Stop Z ZONING
Rev No 1 Status F Date 2022-01-14 Cont ID  
Sent By jroach Date 2022-01-14 Time 13:38 Rev Time 0.00
Received By jroach Date 2022-01-14 Time 12:07 Sent To  
Notes
2022-01-14 13:38:21ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW:
 PERMIT NO.: 21101181
 ________________________________________
  
 REVIEW STATUS: FAILED
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. ALL LANDSCAPE PLANS, IRRIGATION PLANS, ETC. SHALL BE
 REMOVED FROM THE BUILDING PERMIT SUBMITTAL AS A
 SEPARATE LANDSCAPE PERMIT IS REQUIRED.
  
 2. PURSUANT TO THE APPROVAL OF FORMAL SITE PLAN REVIEW
 CASE NO. 19-06, THE FOLLOWING SHALL BE
 PROVIDED/COMPLETED:
  
 2.1. UTILITY LETTERS SHALL BE PROVIDED FROM ALL UTILITY
 COMPANIES.
  
 2.2. PER SEC. 94-233(C)(4) OF THE CITY'S ZLDRS, THE
 MAXIMUM FAR ALLOWED IS 0.2 - THE SITE DATA TABLE
 INDICATES 0.75 IS PERMITTED. PLEASE ADJUST THE PLAN
 ACCORDINGLY.
  
 2.3. PER SEC 94-233(B) OF THE CITY'S ZLDRS, THE MAXIMUM
 BUILDING HEIGHT PERMITTED IS 40 FEET - THE SITE DATA
 TABLE INDICATES 30 FEET. PLEASE ADJUST THE PLAN
 ACCORDINGLY.
  
 2.4. THE A/C EQUIPMENT PADS/AREA TO THE WEST OF THE
 PROPOSED GYMNASIUM NEEDS TO BE SCREENED FROM VIEW WITH
 A WALL OR OPAQUE FENCE CONSISTING OF BRICK, DECORATIVE
 CONCRETE, OTHER DECORATIVE MASONRY, OR COMPARABLY
 DURABLE WOOD/STEEL. CHAIN LINK FENCING WITH SLATS DOES
 NOT COMPLY WITH THIS REQUIREMENT. ADDITIONALLY, THE
 SHRUBS/HEDGES SHALL BE IN FRONT OF THE FENCE/WALL
 (BETWEEN THE SIDEWALK AND THE FENCE/WALL).
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved