Plan Review Details - Permit 21101177
Plan Review Stops For Permit 21101177
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2022-01-05 Cont ID  
Sent By jgomez Date 2022-01-05 Time 14:15 Rev Time 0.00
Received By jgomez Date 2022-01-05 Time 13:39 Sent To  
Notes
2022-01-05 13:44:22SORRY JULIO,
 I MISUNDERSTOOD, WE WILL HAVE TO USE THE INSTALL
 SECTION THAT GIVES US THE -127.5 PSF THIS THE LAST
 INSTALL METHOD ON THE NOA
 THANK YOU!
 JENNIFER PASCUA LEAD PERMIT COORDINATOR ? SOUTH CENTRAL
 AND BUILDPRO
 LIZ GREY DIRECTOR OF PERMITTING
 SUNPRO SOLAR | GOSUNPRO.COM
 DIRECT: (985) 759-0013
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2022-01-05 Cont ID  
Sent By jgomez Date 2022-01-05 Time 09:56 Rev Time 0.00
Received By jgomez Date 2022-01-05 Time 09:45 Sent To  
Notes
2022-01-05 10:07:00RESIDENTIAL (R3) ROOFING REVISION SECOND BUILDING
 REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 REVISION #21101177
  
 ORIGINAL COMMENT:
 1- FLAT ROOF NOA 20-0131.01 SUBMITTED: CLEARLY MARK
 WHICH APPROVED ASSEMBLY IS GOING TO BE INSTALLED TO
 VERIFY COMPLIANCE WITH THE DESIGN PRESSURES OF SEC.
 R301.2.1 FBC-RESIDENTIAL. NOTE: IF THE SELECTED
 ASSEMBLY DOESN'T MEET THE DESIGN PRESSURES FOR ALL ROOF
 ZONES, THEN SIGNED AND SEALED RAS 117 CALCULATIONS ARE
 REQUIRED. SEE GENERAL LIMITATION #7 ON LAST PAGE OF
 NOA. ASSEMBLIES WITH GENERAL LIMITATION #9 CAN NOT BE
 USED IF THEY DON'T MEET THE DESIGN PRESSURES FOR ALL
 ROOF ZONES.
  
 RESP0NSE:
 PER EMAIL FROM JENNIFER PASCUA LEAD PERMIT COORDINATOR
 - SOUTH CENTRAL AND BUILDPRO, THEY ARE USING THE FIRST
 APPROVED ASSEMBLY ON PAGE 7 OF 18 . THE MAXIMUM DESIGN
 PRESSURES FOR THIS ASSEMBLY IS -52.5PSF. SELECTED
 ASSEMBLY DOESN'T MEET THE DESIGN PRESSURES FOR ALL ROOF
 ZONES. PROVIDE SIGNED AND SEALED RAS 117 CALCULATIONS
 FOR NAIL ENHANCING AT PERIMETER AND CORNER AREAS AS
 REQUIRED BY GENERAL LIMITATION #7 ON LAST PAGE OF NOA.
 NEED THE CALCULATIONS TO MEET THE DESIGN PRESSURES
 REQUIRED BY SEC. R301.2.1 FBC-RESIDENTIAL.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-12-20 Cont ID  
Sent By jgomez Date 2021-12-20 Time 11:13 Rev Time 0.00
Received By jgomez Date 2021-12-20 Time 10:56 Sent To  
Notes
2021-12-20 11:13:52RESIDENTIAL (R3) ROOFING REVISION BUILDING REVIEW
 COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 REVISION #21101177
  
  
 NOTE: SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK
 SHALL COMPLY WITH THE MATERIALS AND METHODS
 REQUIREMENTS IN THE FLORIDA BUILDING CODE.
  
 1- FLAT ROOF NOA 20-0131.01 SUBMITTED: CLEARLY MARK
 WHICH APPROVED ASSEMBLY IS GOING TO BE INSTALLED TO
 VERIFY COMPLIANCE WITH THE DESIGN PRESSURES OF SEC.
 R301.2.1 FBC-RESIDENTIAL. NOTE: IF THE SELECTED
 ASSEMBLY DOESN'T MEET THE DESIGN PRESSURES FOR ALL ROOF
 ZONES, THEN SIGNED AND SEALED RAS 117 CALCULATIONS ARE
 REQUIRED. SEE GENERAL LIMITATION #7 ON LAST PAGE OF
 NOA. ASSEMBLIES WITH GENERAL LIMITATION #9 CAN NOT BE
 USED IF THEY DON'T MEET THE DESIGN PRESSURES FOR ALL
 ROOF ZONES.
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-01-05 Cont ID  
Sent By jgomez Date 2022-01-05 Time 14:16 Rev Time 0.00
Received By jgomez Date 2022-01-05 Time 13:39 Sent To I
Notes
2022-01-05 13:43:22SORRY JULIO,
 I MISUNDERSTOOD, WE WILL HAVE TO USE THE INSTALL
 SECTION THAT GIVES US THE -127.5 PSF THIS THE LAST
 INSTALL METHOD ON THE NOA
 THANK YOU!
 JENNIFER PASCUA LEAD PERMIT COORDINATOR ? SOUTH CENTRAL
 AND BUILDPRO
 LIZ GREY DIRECTOR OF PERMITTING
 SUNPRO SOLAR | GOSUNPRO.COM
 DIRECT: (985) 759-0013
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-01-05 Cont ID  
Sent By jgomez Date 2022-01-05 Time 10:07 Rev Time 0.00
Received By jgomez Date 2022-01-05 Time 09:45 Sent To I
Notes
2022-01-05 09:54:55GOOD MORNING MR. GOMEZ
 I AM REACHING OUT BECAUSE WE HAVE BEEN TRYING TO GET
 AHOLD OF SOMEONE WITH THE AHJ TO SPEAK WITH REGARDING
 THE MOST RECENT RESUBMIT TASK. THE PREVIOUS NOA WAS
 DENIED FOR NOT HAVING THE APPROVED ASSEMBLY CLEARLY
 MARKED, HOWEVER I WAS TOLD TO REACH OUT TO YOU DIRECTLY
 AND LET YOU KNOW THAT WE ARE USING THE FIRST APPROVED
 ASSEMBLY:
 MEMBRANE TYPE: APP/SBS MODIFIED, SELF-ADHERING
 DECK TYPE 1I: WOOD, INSULATED
 DECK DESCRIPTION: 19/32? OR GREATER PLYWOOD OR WOOD
 PLANK.
 SYSTEM TYPE A(1): ANCHOR SHEET MECHANICALLY FASTENED,
 OPTIONAL TOP LAYER ADHERED WITH APPROVED ADHESIVE
 WE ARE TRYING TO GET THIS COMPLETED ASAP SINCE THE
 HOMEOWNER IS GETTING QUITE FRUSTRATED SINCE A REROOF
 WAS NOT IN THE ORIGINAL PLANS. IS THERE ANY WAY THAT WE
 CAN EXPEDITE THIS APPROVAL?
 THANK YOU!
 JENNIFER PASCUA LEAD PERMIT COORDINATOR ? SOUTH CENTRAL
 AND BUILDPRO
 LIZ GREY DIRECTOR OF PERMITTING
 SUNPRO SOLAR | GOSUNPRO.COM
 DIRECT: (985) 759-0013
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-12-20 Cont ID  
Sent By jgomez Date 2021-12-20 Time 11:13 Rev Time 0.00
Received By jgomez Date 2021-12-14 Time 14:39 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved