| Plan Review Stops For Permit 21101171 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2021-12-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-12-22 |
Time |
11:00 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-12-22 |
Time |
10:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-12-07 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-12-07 |
Time |
07:18 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-12-07 |
Time |
07:02 |
Sent To |
|
|
| Notes |
| 2021-12-07 07:20:42 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | ASBESTOS REVIEW: | | | | | | FAILED PLAN REVIEW: | | | | | | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2022-01-06 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2022-01-06 |
Time |
09:24 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2022-01-06 |
Time |
09:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-12-22 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-12-22 |
Time |
11:18 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-12-22 |
Time |
10:57 |
Sent To |
|
|
| Notes |
| 2021-12-22 11:18:46 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | BUILDING REVIEW DENIED: | | | | | | | | | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A | | | DEMO PERMIT PER FLORIDA BUILDING | | | CODE, BUILDING 3303, THIS PROJECT APPEARS TO BE FOR A | | | PARTIAL DEMO, THEREFORE EACH ITEM BELOW MAY NOT BE | | | REQUIRED. HOWEVER, EACH ITEM MUST HAVE A RESPONSE FOR | | | FURTHER REVIEW. | | | | | | 1. UTILITY RELEASE FLORIDA POWER & LIGHT (ELECTRIC) | | | RELEASE OF SERVICE CONFIRMATION | | | 2. OK | | | 3. UTILITY RELEASE ? CITY OF WEST PALM BEACH WATER | | | DEPARTMENT, REQUEST FOR METER PULL, ON | | | THEIR FORM "DEMOLITION APPLICATION" | | | (PLEASE PROVIDE THE COMPLETED FORM WITH THE | | | ACKNOWLEDGED RESPONSE FROM THE PUBLIC UTILITIES | | | DEPARTMENT.) | | | 4. OK PER PLUMBING REVIEW. | | | 5. OK | | | 6. OK, USING AUTHORIZED HAULER. | | | 7. OK | | | 8. PROVIDE A STORMWATER POLLUTION PREVENTION PLAN. | | | (PLEASE INDICATE SILT FENCE AT OTHER AREAS SUCH AS | | | ALONG THE WOOD FENCE.) |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-12-07 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-12-07 |
Time |
07:22 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-12-07 |
Time |
07:02 |
Sent To |
|
|
| Notes |
| 2021-12-07 07:35:12 | PETER E VALENTI | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6673 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A | | | DEMO PERMIT PER FLORIDA BUILDING | | | CODE, BUILDING 3303, THIS PROJECT APPEARS TO BE FOR A | | | PARTIAL DEMO, THEREFORE EACH ITEM BELOW MAY NOT BE | | | REQUIRED. HOWEVER, EACH ITEM MUST HAVE A RESPONSE FOR | | | FURTHER REVIEW. | | | | | | 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC) | | | RELEASE OF SERVICE CONFIRMATION | | | 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS) | | | RELEASE OF SERVICE CONFIRMATION | | | 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER | | | DEPARTMENT, REQUEST FOR METER PULL, ON | | | THEIR FORM "DEMOLITION APPLICATION" | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | | UILDING-PERMIT-FORMS | | | WATERDOWN METHOD: | | | IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED | | | INFPRMATION OF THE WATER TRUCK SUCH AS: THE | | | GALLON CAPACITY OF THE WATER TANK AND A LETTER | | | INCLUDING A STATEMENT THAT THE WATER | | | USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY | | | AND WILL BE ON-SITE AT ALL TIMES | | | DURING DEMOLITION. | | | IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED, | | | THEN A PARTIAL RELEASE WILL BE NOTED | | | ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS | | | SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE | | | SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE | | | BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY | | | THE CITY?S UTILITIES DEPT, 561-822-2244. FAX THE | | | COMPLETED "DEMOLITION APPLICATION" FORM TO | | | 561-822-2183. | | | 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT | | | APPLICATION TO BUILDING DIVISION); | | | SCHEDULE A FINAL PLUMBING #703. | | | 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST | | | CONTROL COMPANY STATING THAT | | | DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED | | | FOR RODENTS. | | | 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART | | | MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS | | | IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR | | | THE FORM TO [email protected]. | | | 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF | | | THE STRUCTURE(S) TO BE DEMOLISHED, | | | FBC 107. | | | 8. PROVIDE A STORMWATER POLLUTION PREVENTION PLAN. | | | 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING | | | ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-12-27 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2021-12-27 |
Time |
10:50 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2021-12-27 |
Time |
10:50 |
Sent To |
|
|
| Notes |
| 2021-12-27 10:51:00 | DEMO ONLY 12/27/2021 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2021-12-09 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-12-09 |
Time |
08:48 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-12-09 |
Time |
08:47 |
Sent To |
|
|
| Notes |
| 2021-12-09 09:16:38 | WEST PALM BEACH PLAN REVIEW NEEDS AN ELECTRICAL PERMIT | | | APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL | | | PERMIT APPLICATION TO [email protected], [email protected], | | | AND [email protected] SO WE RECEIVE IT ALSO. WHEN THIS | | | EMAIL IS RECEIVED ONE OF THE REVIEWERS WILL APPROVE THE | | | PLAN REVIEW. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2021-12-30 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-12-30 |
Time |
|
Rev Time |
0.00 |
| Received By |
rrossano |
Date |
2021-12-30 |
Time |
|
Sent To |
I |
|
| Notes |
| 2021-12-30 13:55:06 | PASSED WITH PROVISOS: | | | | | | CONTRACTOR SHALL PROTECT STORMWATER INLET ON OLIVE AVE. | | | AT SW CORNER OF DESOTA USING FILTER FABRIC OR OTHER | | | BMP. | | | | | | ADDRESS ANY OTHER OUTSTANDING DISCIPLINES' COMMENTS. | | | | | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, | | | CITY OF WPB ENGINEERING SERVICES DEPARTMENT | | | DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: | | | (561) 246-9525 | | | EMAIL: [email protected] | | | HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING- | | | STANDARDS-DETAILS | | | CENTRAL OPERATIONS CENTER (DISPATCH): | | | 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
F |
Date |
2021-12-09 |
|
|
Cont ID |
|
| Sent By |
rrossano |
Date |
2021-12-09 |
Time |
|
Rev Time |
|
| Received By |
rrossano |
Date |
2021-12-09 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-12-09 08:06:14 | PLEASE PROVIDE STORMWATER POLLUTION PREVENTION PLAN - | | | SILT FENCE AROUND PROPERTY TO PREVENT DEBRIS RUNOFF; | | | PROTECT ROADWAY FROM TRACKING OF DIRT FROM TRUCKS | | | HAULING DEBRIS; PROTECT ANY STORM DRAIN INLETS IN | | | VICINITY USING BEST MANAGEMENT PRACTICES (FILTER | | | FABRIC, ETC.) | | | | | | THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS | | | PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES, | | | YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL | | | BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR | | | DEMOLITION WORK. INFORMATION CAN BE FOUND HERE: | | | HTTP://WWW.SUNSHINE811.COM/ | | | | | | PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED | | | BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION | | | PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL, | | | FPU, ASBESTOS ETC. | | | | | | TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN | | | REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND | | | WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT | | | FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING | | | BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN | | | REVIEW TIME. | | | | | | ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T | | | UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST | | | PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO | | | DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE | | | AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN | | | REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES | | | WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S | | | ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN | | | REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS. | | | | | | FOR QUESTIONS ABOUT YOUR FAILED PLAN REVIEW AND HOW TO | | | RESUBMIT, EMAIL [email protected] AND A BUILDING DIVISION TEAM | | | MEMBER WILL HELP YOU. | | | | | | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR | | | CONCERNS, THANKS. | | | RICK ROSSANO, SENIOR PROJECT COORDINATOR, | | | CITY OF WPB ENGINEERING SERVICES DEPARTMENT | | | DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE: | | | (561) 246-9525 | | | EMAIL: [email protected] | | | HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING- | | | STANDARDS-DETAILS | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2021-12-12 |
|
|
Cont ID |
|
| Sent By |
abelisle |
Date |
2021-12-12 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
abelisle |
Date |
2021-12-12 |
Time |
11:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-12-09 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2021-12-09 |
Time |
09:38 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2021-12-09 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-12-30 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-12-30 |
Time |
14:19 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-12-22 |
Time |
07:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-12-13 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-12-13 |
Time |
10:03 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-12-01 |
Time |
15:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2021-12-07 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-12-07 |
Time |
14:12 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-12-07 |
Time |
14:12 |
Sent To |
|
|
| Notes |
| 2021-12-07 14:13:47 | APPROVED WITH PRIVISO: | | | MECHANICAL SUB PERMIT REQUIRED FOR THE DEMOLITION OF | | | THE MINI SPLIT. ME |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-12-12 |
|
|
Cont ID |
|
| Sent By |
abelisle |
Date |
2021-12-12 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
abelisle |
Date |
2021-12-12 |
Time |
11:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2021-12-07 |
|
|
Cont ID |
|
| Sent By |
pvalenti |
Date |
2021-12-07 |
Time |
07:14 |
Rev Time |
0.00 |
| Received By |
pvalenti |
Date |
2021-12-07 |
Time |
07:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-12-09 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2021-12-09 |
Time |
09:39 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2021-12-09 |
Time |
09:38 |
Sent To |
|
|
| Notes |
|
|