| Plan Review Stops For Permit 21100569 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2021-11-09 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2021-11-09 |
Time |
16:28 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2021-11-09 |
Time |
16:28 |
Sent To |
|
|
| Notes |
| 2021-11-09 16:28:49 | FRONT BUILDING 425 32ND ST |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2022-03-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-03-14 |
Time |
14:11 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-03-14 |
Time |
13:36 |
Sent To |
|
|
| Notes |
| 2022-03-14 14:12:46 | 3/14/22 DEFERRAL: SH WINDOW ON PLAN PAGE 01. SUBMIT | | | PRODUCT APPROVALS FOR REVIEW PRIOR TO INSTALLATION. CT |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-12-30 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2021-12-30 |
Time |
13:26 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2021-12-30 |
Time |
11:15 |
Sent To |
|
|
| Notes |
| 2021-12-30 13:29:04 | BUILDING PLAN REVIEW | | | | | | CHRISTOPHER S. THROOP, C.B.O., CFM | | | PLANS EXAMINER II PX3169/SFP306 | | | INSPECTOR BN4338 | | | BUILDING OFFICIAL BU1635 | | | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 | | | DEVELOPMENT SERVICES DEPARTMENT | | | CITY OF WEST PALM BEACH | | | (561) 805-6726 | | | [email protected] | | | | | | CODES IN EFFECT: | | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | | CHAPTER 1 ADMINISTRATION | | | NFPA 70 2017 EDITION NEC 2017 | | | | | | 1ST REVIEW | | | | | | RESULTS: DENIED | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | NOTICE: ROOFING PROVISO ON PG D-1. A SEPERATE ROOFING | | | PERMIT IS REQUIRED. CT | | | | | | 1. PROVIDE A SITE PLAN W/BOUNDRY LINE SURVEY. IDENTIFY | | | LOCATION OF WORK. | | | 107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED | | | WITH THE APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY | | | A SITE PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF | | | NEW CONSTRUCTION AND EXISTING STRUCTURES ON THE | | | SITE,... AND IT SHALL BE DRAWN IN ACCORDANCE WITH AN | | | ACCURATE AND INCLUDED BOUNDARY LINE SURVEY. | | | | | | | | | 2. PROVIDE A SITE DRAINAGE PLAN PER FBC R401.3 | | | IT SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND | | | INCLUDED BOUNDARY LINE SURVEY. | | | FBC R401.3 SITE DRAINAGE | | | | | | SURFACE DRAINAGE SHALL BE DIVERTED TO A STORM SEWER | | | CONVEYANCE OR OTHER APPROVED POINT OF COLLECTION THAT | | | DOES NOT CREATE A HAZARD. | | | LOTS SHALL BE GRADED TO DRAIN SURFACE WATER AWAY FROM | | | FOUNDATION WALLS. THE GRADE SHALL FALL A MINIMUM OF 6 | | | INCHES WITHIN THE FIRST 10 FEET. | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2022-05-18 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-05-18 |
Time |
19:26 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-05-18 |
Time |
19:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-03-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-03-14 |
Time |
13:56 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-03-14 |
Time |
13:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-12-14 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2021-12-14 |
Time |
19:52 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2021-12-14 |
Time |
18:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-03-28 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2022-03-28 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2022-03-28 |
Time |
11:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
F |
Date |
2021-11-10 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2021-11-10 |
Time |
11:20 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2021-11-10 |
Time |
11:20 |
Sent To |
|
|
| Notes |
| 2021-11-10 11:45:35 | THE PERMIT HAS FAILED FOR THE FOLLOWING REASON(S): | | | | | | PLEASE INDICATE IN PLANS THE REQUIRED CONDITIONS FROM | | | HISTORIC PRESERVATION SECTION--SHOW SCORE LINE IN | | | STUCCO ON ELEVATION, AND PROVIDE PRODUCT INFORMATION | | | FOR THE NEW WINDOW | | | | | | ANNE HAMILTON | | | HISTORIC PRESERVATION PLANNER | | | 561.822.1428 | | | [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-05-18 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-05-18 |
Time |
19:27 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2022-05-07 |
Time |
11:40 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-03-29 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-03-29 |
Time |
11:13 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-03-13 |
Time |
09:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-12-30 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2021-12-30 |
Time |
13:29 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2021-11-03 |
Time |
05:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2022-05-26 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2022-05-26 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-05-20 |
Time |
09:03 |
Sent To |
|
|
| Notes |
| 2022-05-20 09:04:03 | 5/20/22 EMAILED IMPACT FOR REVIEW-AO |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2022-05-18 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-05-18 |
Time |
13:15 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-05-18 |
Time |
13:15 |
Sent To |
|
|
| Notes |
| 2022-05-18 13:15:52 | IMPACT FEE QUESTIONNAIRE | | | | | | PALM BEACH COUNTY IMPACT FEES - DIGITAL SUBMITTALS | | | | | | PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE | | | DIGITALLY VIA PROJECT DOX UPON NOTIFICATION BY THIS | | | OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST | | | FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE | | | OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL | | | IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME | | | THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. OUR PERMIT | | | LIBRARIANS WILL SEND THE IMPACT FEE QUESTIONNAIRE TO | | | THE PALM BEACH COUNTY IMPACT FEE OFFICE ON YOUR BEHALF. | | | THE FORM CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZ | | | B/ADMINISTRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF | | | UPON APPROVAL AND PAYMENT OF FEES, PLEASE UPLOAD THE | | | RECEIPT TO PROJECT DOX OR EMAIL IT TO | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2022-03-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-03-14 |
Time |
14:12 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-03-14 |
Time |
13:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2021-11-09 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-11-09 |
Time |
11:22 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-11-09 |
Time |
11:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2022-03-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-03-14 |
Time |
14:13 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-03-14 |
Time |
13:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-11-03 |
|
|
Cont ID |
|
| Sent By |
abelisle |
Date |
2021-11-03 |
Time |
20:38 |
Rev Time |
0.00 |
| Received By |
abelisle |
Date |
2021-11-03 |
Time |
20:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2021-12-30 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2021-12-30 |
Time |
13:25 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2021-12-30 |
Time |
11:15 |
Sent To |
|
|
| Notes |
| 2021-12-30 13:26:20 | PROVISO ON PG D-1: A SEPERATE ROOFING PERMIT IS | | | REQUIRED. CT |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-05-18 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2022-05-18 |
Time |
19:26 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2022-03-14 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2022-03-14 |
Time |
14:13 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2022-03-14 |
Time |
13:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-12-30 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2021-12-30 |
Time |
13:14 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2021-12-30 |
Time |
12:01 |
Sent To |
|
|
| Notes |
| 2021-12-30 13:15:34 | SIGNATURE REVIEW | | | | | | CHRISTOPHER S. THROOP, C.B.O., CFM | | | PLANS EXAMINER II PX3169/SFP306 | | | INSPECTOR BN4338 | | | BUILDING OFFICIAL BU1635 | | | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 | | | DEVELOPMENT SERVICES DEPARTMENT | | | CITY OF WEST PALM BEACH | | | (561) 805-6726 | | | [email protected] | | | | | | CODES IN EFFECT: | | | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST | | | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, | | | CHAPTER 1 ADMINISTRATION | | | NEC2017 | | | | | | 1ST REVIEW | | | RESULTS: DENIED | | | | | | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT | | | | | | 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND | | | SUBMITTED FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED, | | | DATED ORIGINALS. A SCAN OF A WET SEAL AND SIGNATURE OR | | | DIGITAL SIGNATURE IS NOT CONSIDERED A DIGITAL | | | SIGNATURE. | | | | | | 2. EITHER UPLOAD A VALID DIGITALLY SIGNED DOCUMENT OR | | | DROP OFF (OR MAIL) ONE PAPER ORIGINAL WITH AN ORIGINAL | | | WET SEAL AND SIGNATURE TO: | | | | | | BUILDING DIVISION, FIRST FLOOR | | | CITY OF WEST PALM BEACH | | | 401 CLEMATIS ST | | | WEST PALM BEACH, FL 33401 | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2022-03-28 |
|
|
Cont ID |
|
| Sent By |
amhamilt |
Date |
2022-03-28 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2022-03-28 |
Time |
11:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-11-10 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
2021-11-10 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
amhamilt |
Date |
2021-11-10 |
Time |
11:20 |
Sent To |
|
|
| Notes |
| 2021-11-10 11:36:25 | THE PERMIT HAS FAILED FOR THE FOLLOWING REASON(S): | | | | | | PLEASE PROVIDE A SURVEY DETAILING REQUIRED SETBACKS | | | | | | ANNE HAMILTON | | | HISTORIC PRESERVATION PLANNER | | | 561.822.1428 | | | [email protected] |
|
|