Plan Review Details - Permit 21100260
Plan Review Stops For Permit 21100260
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-11-02 Cont ID  
Sent By pvalenti Date 2021-11-02 Time 15:26 Rev Time 0.00
Received By pvalenti Date 2021-11-02 Time 15:25 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-10-22 Cont ID  
Sent By jleahy Date 2021-10-22 Time 12:13 Rev Time 0.00
Received By jleahy Date 2021-10-22 Time 11:11 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-10-12 Cont ID  
Sent By pleduc Date 2021-10-12 Time   Rev Time 0.00
Received By pleduc Date 2021-10-12 Time 16:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2021-11-03 Time   Rev Time 0.00
Received By lmarchan Date 2021-11-03 Time 08:53 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-11-02 Cont ID  
Sent By ptharpe Date 2021-11-02 Time 15:26 Rev Time 0.00
Received By pvalenti Date 2021-10-08 Time 09:00 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-10-18 Cont ID  
Sent By medwards Date 2021-10-18 Time 06:23 Rev Time 0.00
Received By medwards Date 2021-10-18 Time 06:23 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-10-19 Cont ID  
Sent By lcrespo Date 2021-10-19 Time 17:57 Rev Time 0.00
Received By lcrespo Date 2021-10-19 Time 16:48 Sent To  
Notes
2021-10-19 17:57:4310/19/21 REVIEWED FOR CODE COMPLIANCE
 (PLUMBING/REVISION)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-11-03 Cont ID  
Sent By ccole Date 2021-11-03 Time 12:22 Rev Time 0.00
Received By ccole Date 2021-11-03 Time 11:57 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-10-25 Cont ID  
Sent By mpeterso Date 2021-10-25 Time 12:01 Rev Time 0.00
Received By mpeterso Date 2021-10-25 Time 12:04 Sent To  
Notes
2021-10-25 12:07:02019 LS1.01-LIFE SAFETY FIRST FLOOR PLAN-SIGNED APPEARS
 NOT TO BE SIGNED AND SEALED, PLEASE FOLLOW INSTRUCTIONS
 BELOW TO CORRECT THIS ISSUE.
  
 EITHER UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED PLAN
 TO THE SIGNATURE FOLDER WITH YOUR RESUBMITTAL (IF
 APPLICABLE) AND COMPLETE THE UPLOAD TASK IN PROJECTDOX,
 OR YOU CAN SUBMIT ONE ORIGINAL SIGNED AND SEALED PAPER
 ORIGINAL WITH A WET SIGNATURE TO THE BUILDING DIVISION.
 SIGNATURE DOCUMENTS ARE TYPICALLY REVIEWED WITHIN TWO
 BUSINESS DAYS AFTER SUBMITTAL; DIGITALLY SIGNED
 DOCUMENTS ARE PREFERRED.
  
 PLEASE EMAIL [email protected] AND CC TO
 [email protected]
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER