| Plan Review Stops For Permit 21100162 |
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
5 |
Status |
P |
Date |
2023-06-06 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2023-06-06 |
Time |
13:51 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2023-06-06 |
Time |
13:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
4 |
Status |
F |
Date |
2023-04-10 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2023-04-10 |
Time |
13:08 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2023-04-10 |
Time |
13:07 |
Sent To |
|
|
| Notes |
| 2023-04-10 13:08:14 | PLEASE ADDRESS ZONING COMMENTS REGARDING POWER SOURCE | | | OUTSIDE OF THE ROW. | | | SUZANNE BERGLUND | | | [email protected] |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
3 |
Status |
F |
Date |
2022-08-10 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2022-08-10 |
Time |
14:59 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2022-08-10 |
Time |
14:55 |
Sent To |
|
|
| Notes |
| 2022-08-10 14:58:46 | 1) CITY UTILITIES ARE SHOWN INCORRECTLY ON PLANS. | | | INCLUDE CITY UNDERGROUND UTILITIY PIPE SIZE, PIPE | | | MATERIAL, AND DESCRIPTION ON THE SITE PLAN. CONTACT | | | JANICE TARBILL, [email protected] FOR AS-BUILT | | | INFORMATION. INCLUDE AS-BUILT INFORMATION IN YOUR | | | RESUBMITTAL. | | | 2) POLE MUST BE 5' AWAY FROM CITY UTILITIES. | | | 3) VERIFY ADA ACCESSIBILITY IS MAINTAINED ON THE | | | SIDEWALK NEXT TO THE POLE LOCATION. | | | 2) PROVIDE PLAN FOR PROPOSED ELECTRIC ROUT AND PROFILE | | | SHOWING ALL CROSSING DATA FOR OTHER UTILITIES. | | | | | | SUZANNE BERGLUND | | | [email protected] | | | 561-494-1075 | | | |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2022-06-27 |
|
|
Cont ID |
|
| Sent By |
sberglun |
Date |
2022-06-27 |
Time |
13:55 |
Rev Time |
0.00 |
| Received By |
sberglun |
Date |
2022-06-27 |
Time |
13:53 |
Sent To |
|
|
| Notes |
| 2022-06-27 13:55:10 | 1) PROVIDE A SUEVEY PREPARED BY A FLORIDA LICENCED | | | SURVEYOR. | | | 2) PROVIDE HOW POWER WILL BE PROVIDED TO THE POLE. | | | SUZANNE BERGLUND | | | [email protected] | | | 561-951-1180 |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2021-11-23 |
|
|
Cont ID |
|
| Sent By |
gpatrie |
Date |
2021-11-23 |
Time |
10:55 |
Rev Time |
0.00 |
| Received By |
gpatrie |
Date |
2021-11-23 |
Time |
10:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2023-06-07 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2023-06-07 |
Time |
10:39 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2023-04-12 |
Time |
10:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2023-04-11 |
|
|
Cont ID |
|
| Sent By |
aoliver |
Date |
2023-04-11 |
Time |
08:09 |
Rev Time |
0.00 |
| Received By |
aoliver |
Date |
2022-09-01 |
Time |
08:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-08-12 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-08-12 |
Time |
16:50 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-07-12 |
Time |
09:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2022-06-27 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2022-06-27 |
Time |
15:54 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2022-01-31 |
Time |
06:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-11-29 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-11-29 |
Time |
14:11 |
Rev Time |
0.00 |
| Received By |
eschneid |
Date |
2021-10-05 |
Time |
11:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
5 |
Status |
P |
Date |
2023-06-06 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-06-06 |
Time |
12:16 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-06-06 |
Time |
12:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
F |
Date |
2023-01-25 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2023-01-25 |
Time |
11:09 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2023-01-25 |
Time |
10:28 |
Sent To |
|
|
| Notes |
| 2023-01-25 11:09:29 | 1. SURVEY AND SITE PLAN ILLUSTRATE THAT POWER IS BEING | | | PULLED FROM LOCATION OR POWER SOURCE THAT IS LOCATED | | | OUTSIDE RIGHT-OF-WAY AND ON PRIVATE PROPERTY. PLEASE | | | PROVIDE PROOF OF WORK BEING DONE WITHIN GENERAL UTILITY | | | EASEMENT, IN ORDER TO PULL POWER FROM THIS LOCATION. | | | OTHERWISE POWER MUST BE OBTAINED FROM ANOTHER SOURCE. | | | | | | 2. PLEASE PROVIDE POWER ROUTE DETAILS ILLUSTRATING | | | GENERAL PATH AND DEPTH OF CONDUIT OR ELECTRICAL | | | CONNECTIONS IN RELATION TO CITY UTILITIES. | | | | | | 3. POLE LOCATION, HEIGHT, AND STEALTH DESIGN MEETS CITY | | | STANDARDS. | | | | | | CHRIS KIMMERLY, AICP | | | URBAN DESIGN PLANNER | | | (561)822-1426 [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2022-07-26 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2022-07-26 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2022-07-26 |
Time |
14:37 |
Sent To |
|
|
| Notes |
| 2022-07-26 14:37:50 | 1. PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED | | | SURVEYOR, WHICH SHOWS THE POLE LOCATION, ELECTRIC | | | ROUTE, AND THE RIGHT-OF-WAY LINE SO THAT STAFF CAN | | | VERIFY THAT THE WIRELESS COMMUNICATION FACILITY IS | | | WITHIN THE RIGHT-OF-WAY AND NOT ON PRIVATE PROPERTY. | | | - SURVEY PROVIDED DOES NOT SHOW ENTIRE SCOPE OF PROJECT | | | OR AFFECTED ROW. PLEASE SHOW A COMPLETE SURVEY WITH | | | POLE LOCATION AND POWER ROUTE. | | | - | | | 2. OVERALL SITE PLAN SHOULD SHOW SCOPE OF THE ENTIRE | | | PROJECT, SHOW POWER ROUTE AND WHERE POWER IS COMING | | | FROM. | | | | | | 3. PLEASE INCLUDE POLE HEIGHT IN PHOTO SIM SHEETS. | | | | | | 4. PLEASE PROVIDE THE NECESSARY PUBLIC/PRIVATE UTILITY | | | LETTERS GRANTING APPROVAL OF THE BORE PITS, HANDHOLES, | | | AND UNDERGROUND ELECTRICAL FOR THE PROPOSED POLE | | | LOCATION. | | | | | | 5. POLE LOCATION, HEIGHT, AND STEALTH DESIGN MEETS CITY | | | STANDARDS. | | | | | | | | | CHRIS KIMMERLY, AICP | | | URBAN DESIGN PLANNER | | | (561)822-1426 [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2022-02-10 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2022-02-10 |
Time |
14:49 |
Rev Time |
0.00 |
| Received By |
ckimmerl |
Date |
2022-02-10 |
Time |
14:38 |
Sent To |
|
|
| Notes |
| 2022-02-10 14:39:14 | 1. PROPOSED POLE LOCATION WILL CONFLICT WITH RECENTLY | | | SUBMITTED SOLANA 8-STORY MULTIFAMILY RESIDENTIAL | | | PROJECT. WILL REQUIRE UPDATED PLANS AND DRAWINGS. | | | POTENTIAL POLE CONFLICT WITH PROPOSED BUILDING | | | ENTRANCE, LANDSCAPING (STREET TREES), STRUCTURAL SOIL, | | | OR STREET LIGHTING. PLEASE COORDINATE WITH PROPOSED | | | PROJECT AND RELOCATE OR OVERLAY POLE PLAN ONTO | | | SUBMITTED SOLANA PLANS. | | | - STAFF RECOMMENDS A SHIFT IN POLE LOCATION TO BE | | | CLOSER TO THE CURB ALONG DATURA ST. (IN BETWEEN FIRST | | | SET OF PROPOSED LANDSCAPE BEDS AND IN LINE WITH STREET | | | TREES OR EXISTING POLES/HYDRANT) OR SUGGEST AN | | | ALTERNATIVE POLE LOCATION. PLEASE COORDINATE TO PRODUCE | | | REVISED PLANS. | | | SOLANA PROJECT ARCHITECT CONTACT: MODIS ARCHITECTS | | | 786.879.8882 [email protected] | | | STAFF WILL PROVIDE PRELIMINARY/SUBMITTED SITE PLAN FOR | | | SOLANA PROJECT TO TIMOTHY P HEWITT OF DRAFTPROS, INC. | | | | | | 2. PLEASE PROVIDE THE NECESSARY PUBLIC UTILITY LETTERS | | | GRANTING APPROVAL OF THE BORE PITS, HANDHOLES, AND | | | UNDERGROUND ELECTRICAL FOR THE PROPOSED POLE LOCATION. | | | | | | 3. THE POLE STEALTH DESIGN MEETS CITY STANDARDS. | | | | | | PROJECT'S PROPOSED UNDERGROUNDING ELECTRIC/COMPONENTS | | | AND DETAILS ARE INCLUDED UNDER SEPARATE PERMIT | | | #22020540 AND SHALL BE REVIEWED ACCORDINGLY | | | | | | CHRIS KIMMERLY @ (561)822-1426 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-11-29 |
|
|
Cont ID |
|
| Sent By |
ckimmerl |
Date |
2021-11-29 |
Time |
14:10 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-11-29 |
Time |
11:29 |
Sent To |
|
|
| Notes |
| 2021-11-29 14:10:11 | FAILED | | | | | | 1) PROVIDE A SURVEY, PREPARED BY A FLORIDA LICENSED | | | SURVEYOR, WHICH SHOWS THE POLE LOCATION AND THE | | | RIGHT-OF-WAY LINE SO THAT STAFF CAN VERIFY THAT THE | | | WIRELESS COMMUNICATION FACILITY IS WITHIN THE | | | RIGHT-OF-WAY AND NOT ON PRIVATE PROPERTY. THE SURVEY | | | MUST SHOW THE SETBACKS OF THE PROPOSED POST TO THE EDGE | | | OF THE RIGHT-OF-WAY AND THE EDGE OF THE SIDEWALK, AS | | | WELL AS THE SIDEWALK WIDTH. | | | | | | 2) THE SURVEY MUST INCLUDE THE HEIGHTS OF UTILITY POLES | | | (INCLUDING LIGHT POLES) ALONG DATURA STREET, SO THAT | | | STAFF CAN VERIFY THAT THE PROPOSED 25 FOOT TALL POLE | | | COMPLIES WITH THE POLE HEIGHTS LOCATED ALONG DATURA | | | STREET. NOTE: THERE IS A COBRA HEAD LIGHT POLE EAST OF | | | THE SITE THAT WILL MOST LIKELY SET YOUR MAXIMUM POLE | | | HEIGHT. | | | | | | 3) THE POLE COLOR WILL NEED TO MATCH THAT DECORATIVE | | | STREET LIGHTS ON THE NORTH SIDE OF DATURA STREET (IT IS | | | A SPECKLED GREY). | | | | | | 4) THE PROPOSED POLE COMPLIES WITH CITY CONCEALMENT | | | REQUIREMENTS. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] |
|
|