Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2021-10-25 Cont ID  
Sent By jgomez Date 2021-10-25 Time 13:46 Rev Time 0.00
Received By jgomez Date 2021-10-25 Time 13:34 Sent To  
Notes
2021-10-25 13:34:4510/25/21 TALKED TO SCOTT POST TO GO OVER COMMENTS. HE
 SAID HE WILL INSTALL W-48 ASSEMBLY. JG.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2021-10-25 Cont ID  
Sent By jgomez Date 2021-10-25 Time 10:55 Rev Time 0.00
Received By jgomez Date 2021-10-25 Time 10:11 Sent To  
Notes
2021-10-25 10:14:17RESIDENTIAL (R3) RE-ROOF, THIRD BUILDING REVIEW
 COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21091314
  
 NOTE: SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK
 SHALL COMPLY WITH THE MATERIALS AND METHODS
 REQUIREMENTS IN THE FLORIDA BUILDING CODE.
  
  
 1- FLAT ROOF PRODUCT APPROVAL FL14672-R6 SUBMITTED:
 SELECTED ASSEMBLY W-46 IS A FULLY BONDED ROOF COVER
 ASSEMBLY. THE MAXIMUM DESIGN PRESSURES FOR THIS
 ASSEMBLY IS -75.0PSF. THIS ASSEMBLY DOESN'T MEET THE
 DESIGN PRESSURES FOR ALL ROOF ZONES. ACCORDING TO NOTE
 # 6 PM PAGE 1 OF 7 OF PRODUCT APPROVAL SUBMITTED, THIS
 ASSEMBLY CAN NOT BE USED BECAUSE IT DOESN'T ALLOW
 RATIONAL ANALYSIS. NEED TO SELECT ANOTHER ASSEMBLY THAT
 MEETS THE DESIGN PRESSURES OF ALL ROOF ZONES.
 NOTE: ANY ONE OF ASSEMBLIES W-48, W-49 AND W-50 WILL
 WORK.
 SEC. R301.2.1 FBC-RESIDENTIAL.
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-10-18 Cont ID  
Sent By jgomez Date 2021-10-18 Time 14:41 Rev Time 0.00
Received By jgomez Date 2021-10-18 Time 14:30 Sent To  
Notes
2021-10-18 14:32:15RESIDENTIAL (R3) RE-ROOF, SECOND BUILDING REVIEW
 COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21091314
  
 NOTE: SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK
 SHALL COMPLY WITH THE MATERIALS AND METHODS
 REQUIREMENTS IN THE FLORIDA BUILDING CODE.
  
 ORIGINAL COMMENT:
 1- PROVIDE COMPLETE PRODUCT APPROVALS FOR THE SHINGLES,
 SHINGLES UNDERLAYMENT AND FLAT ROOF. ONLY THE FLORIDA
 PRODUCT APPROVAL COVER PAGE WAS SUBMITTED. NEED TO
 SUBMIT THE INSTALLATION INSTRUCTIONS ALSO.
 FAC G20-3.001.
  
 RESPONSE:
 NEED TO PROVIDE COMPLETE PRODUCT APPROVAL FOR EACH ROOF
 MATERIAL: SHINGLES, SHINGLES UNDERLAYMENT AND FLAT
 ROOF.
 NOTE: NEED TO UPLOAD EACH PRODUCT APPROVAL ON A
 SEPARATE PDF. PLEASE DON'T UPLOAD EACH SHEET
 SEPARATELY. PLEASE CONTACT ME IF YOU HAVE ANY
 QUESTIONS.
  
 ORIGINAL COMMENT:
 2- FLAT ROOF PRODUCT APPROVAL SUBMITTED:
 CLEARLY MARK WHICH APPROVED ASSEMBLY IS GOING TO BE
 INSTALLED TO VERIFY COMPLIANCE WITH THE DESIGN
 PRESSURES OF SEC. R301.1 FBC-RESIDENTIAL. NOTE: IF THE
 SELECTED ASSEMBLY DOESN'T MEET THE DESIGN PRESSURES FOR
 ALL ROOF ZONES, THEN SIGNED AND SEALED RAS 117
 CALCULATIONS ARE REQUIRED.
 SEC. R301.2.1 FBC-RESIDENTIAL.
  
 RESPONSE:
 INFORMATION SHOWING THE SPECIFIC ASSEMBLY TO BE
 INSTALLED WAS NOT PROVIDED. UNABLE TO VERIFY IF
 PROPOSED ASSEMBLY WILL WORK OR IF ENGINEERING WILL BE
 REQUIRED. PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS.
  
 ORIGINAL COMMENT:
 3- SHINGLES UNDERLAYMENT PRODUCT APPROVAL SUBMITTED:
 PROVIDE SPECIFICATIONS CLEARLY SHOWING HOW COMPLYING
 WITH THE NEW 2020 CODE REQUIREMENT FOR ROOFING
 UNDERLAYMENT SEC. 1507.1.1.1 FBC-BUILDING.
 NOTE: CLEARLY MARK WHICH UNDERLAYMENT IS GOING TO BE
 USED.
  
 RESPONSE:
 PROVIDE COMPLETE PRODUCT APPROVAL AND MARK SELECTED
 UNDERLAYMENT.
  
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-10-05 Cont ID  
Sent By jgomez Date 2021-10-05 Time 10:50 Rev Time 0.00
Received By jgomez Date 2021-10-05 Time 09:44 Sent To  
Notes
2021-10-05 10:57:10RESIDENTIAL (R3) RE-ROOF, BUILDING REVIEW COMMENTS
 CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS.
 PERMIT #21091314
  
 NOTE: SEC. 702.6 FBC-EXISTING BUILDING. ALL NEW WORK
 SHALL COMPLY WITH THE MATERIALS AND METHODS
 REQUIREMENTS IN THE FLORIDA BUILDING CODE.
  
 1- PROVIDE COMPLETE PRODUCT APPROVALS FOR THE SHINGLES,
 SHINGLES UNDERLAYMENT AND FLAT ROOF. ONLY THE FLORIDA
 PRODUCT APPROVAL COVER PAGE WAS SUBMITTED. NEED TO
 SUBMIT THE INSTALLATION INSTRUCTIONS ALSO.
 FAC G20-3.001
  
 2- FLAT ROOF PRODUCT APPROVAL SUBMITTED:
 CLEARLY MARK WHICH APPROVED ASSEMBLY IS GOING TO BE
 INSTALLED TO VERIFY COMPLIANCE WITH THE DESIGN
 PRESSURES OF SEC. R301.1 FBC-RESIDENTIAL. NOTE: IF THE
 SELECTED ASSEMBLY DOESN'T MEET THE DESIGN PRESSURES FOR
 ALL ROOF ZONES, THEN SIGNED AND SEALED RAS 117
 CALCULATIONS ARE REQUIRED.
 SEC. R301.2.1 FBC-RESIDENTIAL.
  
 3- SHINGLES UNDERLAYMENT PRODUCT APPROVAL SUBMITTED:
 PROVIDE SPECIFICATIONS CLEARLY SHOWING HOW COMPLYING
 WITH THE NEW 2020 CODE REQUIREMENT FOR ROOFING
 UNDERLAYMENT SEC. 1507.1.1.1 FBC-BUILDING.
 NOTE: CLEARLY MARK WHICH UNDERLAYMENT IS GOING TO BE
 USED.
  
 4- NEED TO SPECIFY THE MEAN ROOF HEIGHT, ROOF PITCH, AS
 REQUIRED BY THE CITY POLICY FOR ALL ROOFING PERMITS.
 SEC. 107.2.1 CITY AMENDMENTS.
  
 5- PROVIDE ROOF SKETCH SHOWING ALL THE FLAT AND PITCHED
 ROOF AREAS. SEC. 107.2.1 CITY AMENDMENTS.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS REGARDING THESE COMMENTS,
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-10-25 Cont ID  
Sent By jgomez Date 2021-10-25 Time 13:46 Rev Time 0.00
Received By jgomez Date 2021-10-25 Time 13:34 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-10-25 Cont ID  
Sent By jgomez Date 2021-10-25 Time 10:55 Rev Time 0.00
Received By jgomez Date 2021-10-22 Time 09:43 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-10-18 Cont ID  
Sent By jgomez Date 2021-10-18 Time 15:01 Rev Time 0.00
Received By jgomez Date 2021-10-07 Time 16:57 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-10-05 Cont ID  
Sent By jgomez Date 2021-10-05 Time 10:57 Rev Time 0.00
Received By jgomez Date 2021-09-29 Time 08:25 Sent To I
Notes
***NONE***