Plan Review Details - Permit 21091145
Plan Review Stops For Permit 21091145
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-10-28 Cont ID  
Sent By cthroop Date 2021-10-28 Time 11:06 Rev Time 0.00
Received By cthroop Date 2021-10-28 Time 10:58 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-09-30 Cont ID  
Sent By rmcdouga Date 2021-09-30 Time 10:14 Rev Time 0.00
Received By cthroop Date 2021-10-28 Time 10:58 Sent To  
Notes
2021-09-30 10:40:18PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THIS ROOF HAS A SLOPE OF 3:12, DOUBLE UNDERLAYMENT
 IS REQUIRED BY FBC-R 905.2.2. FOR ROOF SLOPES FROM TWO
 UNITS VERTICAL IN 12 UNITS HORIZONTAL (2:12) AND LESS
 THAN FOUR UNITS VERTICAL IN 12 UNITS HORIZONTAL (4:12),
 DOUBLE UNDERLAYMENT APPLICATION IS REQUIRED IN
 ACCORDANCE WITH SECTION R905.1.1. THIS MEETS THE
 UNDERLAYMENT REQUIREMENT OF FBC-R905.1.1.1 METHOD #4.
  
 2) THE MAXIMUM DESIGN PRESSURE OF -52.5 PSF IS NOT
 ADEQUATE FOR PERIMETER AND CORNER ROOF PRESSURES.
 SUBMIT SIGNED AND SEALED ENHANCED FASTENING
 CALCULATIONS FOR THE GAF MODIFIED BITUMEN ROOF SYSTEM
 WITH FASTENING OPTION #3 ON PAGE 51 OF NOA NO.
 18-0919.12.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-11-09 Cont ID  
Sent By lcrespo Date 2021-11-09 Time 11:44 Rev Time 0.00
Received By lcrespo Date 2021-11-08 Time 12:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-10-28 Cont ID  
Sent By cthroop Date 2021-10-28 Time 11:07 Rev Time 0.00
Received By cthroop Date 2021-10-07 Time 08:08 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-09-30 Cont ID  
Sent By rmcdouga Date 2021-09-30 Time 10:14 Rev Time 0.00
Received By rmcdouga Date 2021-09-30 Time 05:47 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-11-09 Cont ID  
Sent By lcrespo Date 2021-11-09 Time 11:44 Rev Time 0.00
Received By lcrespo Date 2021-11-09 Time 11:44 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-10-28 Cont ID  
Sent By cthroop Date 2021-10-28 Time 11:07 Rev Time 0.00
Received By cthroop Date 2021-10-28 Time 11:06 Sent To  
Notes
2021-10-28 11:07:56SIGNATURE REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 NEC2017
  
 1ST REVIEW
 RESULTS: DENIED
  
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
 RE: ENHANCED FASTENER CALCULATIONS
  
 1. DOCUMENTS PREPARED BY AN ARCHITECT OR ENGINEER AND
 SUBMITTED FOR PUBLIC RECORD ARE TO BE SIGNED, SEALED,
 DATED ORIGINALS. A SCAN OF A WET SEAL AND SIGNATURE OR
 DIGITAL SIGNATURE IS NOT CONSIDERED A DIGITAL
 SIGNATURE.
  
 2. EITHER UPLOAD A VALID DIGITALLY SIGNED DOCUMENT OR
 DROP OFF (OR MAIL) ONE PAPER ORIGINAL WITH AN ORIGINAL
 WET SEAL AND SIGNATURE TO:
  
 BUILDING DIVISION, FIRST FLOOR
 CITY OF WEST PALM BEACH
 401 CLEMATIS ST
 WEST PALM BEACH, FL 33401
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved