Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2021-12-01 Cont ID  
Sent By cthroop Date 2021-12-01 Time 08:23 Rev Time 0.00
Received By cthroop Date 2021-12-01 Time 06:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-12-21 Cont ID  
Sent By cthroop Date 2021-12-21 Time 13:01 Rev Time 0.00
Received By cthroop Date 2021-12-21 Time 12:02 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-12-01 Cont ID  
Sent By cthroop Date 2021-12-01 Time 08:44 Rev Time 0.00
Received By cthroop Date 2021-12-01 Time 06:11 Sent To  
Notes
2021-12-01 08:54:06BUILDING DEMO PLAN REVIEW
  
 CHRISTOPHER S. THROOP, C.B.O., CFM
 PLANS EXAMINER II PX3169/SFP306
 INSPECTOR BN4338
 BUILDING OFFICIAL BU1635
 ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935
 DEVELOPMENT SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 (561) 805-6726
 [email protected]
  
 CODES IN EFFECT:
 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST
 PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE,
 CHAPTER 1 ADMINISTRATION
 2017 NEC
  
 1ST REVIEW
  
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
  
  
 DEMO CHECKLIST
  
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
 (SEE ELECTRICAL REVIEW COMMENTS FOR DIRECTIONS)
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 (FPU RELEASE SUBMITTED FOR REVIEW HAS NOT BEEN
 APPROVED)
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON THEIR FORM
 "DEMOLITION APPLICATION"
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION); SCHEDULE A FINAL
 PLUMBING INSPECTION #703.
 (SEE PLUMBING REVIEW COMMENTS FOR DIRECTIONS)
  
 5. EXTERMINATION LETTER
 (COMPLETE).
  
 6. COMPLETE THE DEMO DEBRIS FORM:
 DEMO DEBRIS FORM SUBMITTED FOR REVIEW IS FOR DESOTO
 COUNTY.
 (I UPLOADED THE CITY'S DEMO DEBRIS FORM TO THE
 SUPPORTING DOC'S FOLDER FOR YOUR REVIEW AND USE).
  
 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF
 THE STRUCTURE(S) TO BE DEMOLISHED, FBC 107.
 (COMPLETE).
  
 8.PROVIDE A STORMWATER POLLUTION PREVENTION PLAN.
 YOU MAY USE THE SURVEY. SHOW SILT FENCEING OR OTHER
 APPROVED METHODS
 (SEE ENGINEERING REVIEW COMMENTS).
  
 9.ASBESTOS
 (COMPLETE)
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-12-13 Cont ID  
Sent By jleahy Date 2021-12-13 Time 15:05 Rev Time 0.00
Received By jleahy Date 2021-12-13 Time 15:05 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-12-13 Cont ID  
Sent By jleahy Date 2021-12-13 Time 12:12 Rev Time 0.00
Received By jleahy Date 2021-12-13 Time 12:11 Sent To  
Notes
2021-12-13 12:13:16WEST PALM BEACH PLAN REVIEW NEEDS AN ELECTRICAL PERMIT
 APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL
 PERMIT APPLICATION TO [email protected], [email protected],
 AND [email protected] SO WE RECEIVE IT ALSO. WHEN THIS
 EMAIL IS RECEIVED ONE OF THE REVIEWERS WILL APPROVE THE
 PLAN REVIEW.
  
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2021-12-20 Cont ID  
Sent By rrossano Date 2021-12-20 Time   Rev Time 0.00
Received By rrossano Date 2021-12-20 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2021-11-29 Cont ID  
Sent By rrossano Date 2021-11-29 Time   Rev Time 0.00
Received By rrossano Date 2021-11-29 Time   Sent To  
Notes
2021-11-29 14:02:18PLEASE PROVIDE STORMWATER POLLUTION PREVENTION PLAN -
 SILT FENCE AROUND PROPERTY TO PREVENT DEBRIS RUNOFF;
 PROTECT ROADWAY FROM TRACKING OF DIRT FROM TRUCKS
 HAULING DEBRIS; PROTECT ANY STORM DRAIN INLETS IN
 VICINITY USING BEST MANAGEMENT PRACTICES (FILTER
 FABRIC, ETC.)
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON?T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ?WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE?? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT YOUR FAILED PLAN REVIEW AND HOW TO
 RESUBMIT, EMAIL [email protected] AND A BUILDING DIVISION TEAM
 MEMBER WILL HELP YOU.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-10-21 Cont ID  
Sent By rrossano Date 2021-10-21 Time   Rev Time  
Received By rrossano Date 2021-10-21 Time   Sent To  
Notes
2021-10-21 13:37:05PLEASE PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS
 REQUIRED BY BUILDING DEPT. - STORMWATER POLLUTION
 PREVENTION PLAN, AND UTILITY SIGNOFFS - WATER/SEWER,
 PEST, FPL, FPU, ASBESTOS ETC.
 PROTECT ROADWAY FROM TRACKING OF DIRT FROM TRUCKS
 HAULING DEBRIS.
 PROTECT ANY STORM DRAIN INLETS IN VICINITY USING BEST
 MANAGEMENT PRACTICES (FILTER FABRIC, ETC.)
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, SENIOR PROJECT COORDINATOR,
 CITY OF WPB ENGINEERING SERVICES DEPARTMENT
 DIRECT: (561) 494-1098, FAX: (561) 494-1116, MOBILE:
 (561) 246-9525
 EMAIL: [email protected]
 HTTPS://WWW.WPB.ORG/GOVERNMENT/ENGINEERING/ENGINEERING-
 STANDARDS-DETAILS
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-12-01 Cont ID  
Sent By pleduc Date 2021-12-01 Time   Rev Time 0.00
Received By pleduc Date 2021-12-01 Time 10:16 Sent To  
Notes
2021-12-01 10:21:31FIRE PROVISO:
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP
 DRAWINGS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2021-12-16 Cont ID  
Sent By ccole Date 2021-12-16 Time 11:38 Rev Time 0.00
Received By ccole Date 2021-12-16 Time 10:38 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2021-12-01 Cont ID  
Sent By ccole Date 2021-12-01 Time 12:01 Rev Time 0.00
Received By ccole Date 2021-12-01 Time 12:01 Sent To  
Notes
2021-12-01 12:02:181ST REVIEW FBC-2020 FUEL GAS
 PERMIT-21091099
 12/01/2021
  
 CODES IN EFFECT:
 FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020
 FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE SUBMITTED FPU UTILITIES DEMOLITION REQUEST FORM
 HAS NOT BEEN SIGNED OFF BY FPU. PLEASE SUBMIT A SIGNED
 AND DATED APPROVED RELEASE FORM TO VERIFY THE SERVICE
 HAS BEEN DEACTIVATED.
  
 2) SHEET AD.1.1, KEYNOTE D6: PROVIDE ADDITIONAL
 INFORMATION- SHOW THE GAS MAIN CAP LOCATION. WILL IT BE
 IN THE BUILDING, AT THE METER?
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-10-21 Cont ID  
Sent By amhamilt Date 2021-10-21 Time 16:05 Rev Time 0.00
Received By amhamilt Date 2021-10-21 Time 16:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-12-21 Cont ID  
Sent By cthroop Date 2021-12-21 Time 13:02 Rev Time 0.00
Received By cthroop Date 2021-12-15 Time 06:35 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-12-13 Cont ID  
Sent By jleahy Date 2021-12-13 Time 12:13 Rev Time 0.00
Received By jleahy Date 2021-11-10 Time 16:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-11-03 Cont ID  
Sent By lmarchan Date 2021-11-03 Time 12:13 Rev Time 0.00
Received By lmarchan Date 2021-10-13 Time 06:35 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-12-01 Cont ID  
Sent By medwards Date 2021-12-01 Time 09:50 Rev Time 0.00
Received By medwards Date 2021-12-01 Time 09:50 Sent To  
Notes
2021-12-01 09:53:23MECHANICAL IS APPROVED: A MECHANICAL SUB PERMIT IS
 REQUIRED FOR THE MECHANICAL DEMO. ME

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-12-16 Cont ID  
Sent By ccole Date 2021-12-16 Time 11:38 Rev Time 0.00
Received By ccole Date 2021-12-16 Time 10:39 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-12-01 Cont ID  
Sent By ccole Date 2021-12-01 Time 13:07 Rev Time 0.00
Received By ccole Date 2021-12-01 Time 11:21 Sent To  
Notes
2021-12-01 13:12:501ST REVIEW FBC-2020 PLUMBING
 PERMIT- 21091099
 12/01/2021
  
 CODES IN EFFECT:
 FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020
 FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) PLEASE SUBMIT A SIGNED AND APPROVED WPB WATER
 UTILITIES RELEASE FORM. PLEASE NOTE THE PLANS APPEAR TO
 SHOW A PARTIAL DEMOLITION, HOWEVER THE FORM ALLOWS THE
 OPTION OF DISCONNECTING THE WATER SERVICE OR KEEPING IT
 ACTIVE DURING THE DEMOLITION PROCESS.
  
 2) PLEASE NOTE THE FOLLOWING REQUIREMENTS FOR BUILDING
 OR PARTIAL BUILDING DEMOLITION:
 *IF A WATER TRUCK IS DESIRED FOR WATERING DOWN SITE,
 DETAILS WILL BE REQUIRED.
 *IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED ON THEIR FORM.
 PLEASE NOTE THAT A SEPARATE PERMIT IS REQUIRED FOR AN
 RPZ BACKFLOW PREVENTER DEVICE AT THE PROPERTY, AND THE
 INSTALLATION MUST HAVE A FINAL PASSED INSPECTION
 INCLUDING TESTING AND CERTIFICATION OF THE DEVICE BY
 THE WPB UTILITIES DEPARTMENT PRIOR TO SCHEDULING THE
 FINAL DEMOLITION INSPECTION. FOR FURTHER INFORMATION
 ABOUT THE BACKFLOW PREVENTER PLEASE CONTACT THE
 UTILITIES DEPT. AT 561-822-2244.
 *FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 3) SHEET AD.1.1, KEYNOTE 5: PROVIDE ADDITIONAL
 INFORMATION- SHOW THE MAIN WATER CAP LOCATION- IN THE
 BUILDING, AT THE METER? WILL THE SERVICE BE
 DISCONNECTED?
  
 4) AD.1.1: PROVIDE ROOF AND STORM DRAIN DEMOLITION
 NOTES AND DETAILS- SECTION 107.2.1 WPB.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-12-21 Cont ID  
Sent By cthroop Date 2021-12-21 Time 13:01 Rev Time 0.00
Received By cthroop Date 2021-12-21 Time 12:02 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-12-01 Cont ID  
Sent By cthroop Date 2021-12-01 Time 08:44 Rev Time 0.00
Received By cthroop Date 2021-12-01 Time 06:11 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-10-27 Cont ID  
Sent By amhamilt Date 2021-10-27 Time 17:04 Rev Time 0.00
Received By amhamilt Date 2021-10-27 Time 17:04 Sent To  
Notes
***NONE***