| Plan Review Stops For Permit 21091063 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2022-01-18 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-01-18 |
Time |
08:03 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-01-18 |
Time |
08:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-11-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-11-08 |
Time |
08:31 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-11-08 |
Time |
08:25 |
Sent To |
|
|
| Notes |
| 2021-11-08 08:29:12 | PORTE COCHERE | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) DRAWING S2.2 DETAIL 17 SECTION B/B - PLEASE SHOW THE | | | TRUSS HANGER NUMBER (SIMPSON XXXX?) | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-10-14 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-10-14 |
Time |
13:39 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-10-13 |
Time |
10:11 |
Sent To |
|
|
| Notes |
| 2021-10-14 13:39:40 | PORTE COCHERE | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | 1) PLEASE PROVIDE A SOILS REPORT (GEOTECHNICAL REPORT) | | | FBC 1803.2 | | | | | | 2) PLEASE SHOW TRUSS STRAPPING DESIGNATIONS AND | | | FASTENING REQUIREMENTS FBC 1609.1 | | | | | | 3) PLEASE SHOW THE ROOF SLOPES FOR THE SLOPE ROOF AND | | | THE LOW SLOPE (FLAT DECK) FBC 1507.2.2 - 1507.10.1 | | | | | | 4) PLEASE SHOW THE ROOF SHEATHING DETAILS DECKING TYPE | | | AND FASTENER SIZE AND ON CENTER SPACING - FBC WPB | | | 107.2.1 | | | | | | 5) PLEASE SHOW THE EXTERIOR PARAPET AND SOFFIT CLADDING | | | ATTACHMENT DETAILS OR PROVIDE A MIAMI DADE OR FLORIDA | | | STATE PRODUCT APPROVAL. FBC 1609.1 | | | | | | 6) PLEASE PROVIDE A SITE PLAN THAT SHOWS THE STRUCTURES | | | SET BACKS FROM THE PROPERTY LINES. FBC WPB 107.2.5 | | | | | | 7) PLEASE PROVIDE A COMPLETE (FRONT PAGES AND THE | | | INSTALLATION INSTRUCTIONS) PRODUCT APPROVAL FOR THE | | | ROOF SHINGLES - ALL PRODUCT APPROVALS NEED TO BE | | | REVIEWED AND MARKED APPROVED BY THE DESIGNER OF RECORD | | | FBC WPB 107.3.4 | | | | | | 8) ROOFING UNDERLAYMENT SHOWN FOR THE SHINGLE ROOF | | | NEEDS TO MEET THE REQUIREMENTS OF FBC 1507.1.1 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2022-01-27 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-01-27 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-01-27 |
Time |
09:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-10-15 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-10-15 |
Time |
14:32 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-10-15 |
Time |
14:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2022-01-18 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2022-01-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2022-01-18 |
Time |
13:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2021-09-30 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-09-30 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-09-30 |
Time |
16:30 |
Sent To |
|
|
| Notes |
| 2021-09-30 16:32:39 | FIRE PROVISO: | | | | | | PROVIDE A LOW HEIGHT WARNING SIGN DUE TO | | | HEIGHT IS BELOW 13'6" MIN. FOR FIRE APPARATUS | | | TO USE. | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2022-01-27 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2022-01-27 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2022-01-14 |
Time |
12:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-11-16 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-11-16 |
Time |
11:48 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-11-03 |
Time |
15:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-10-15 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-10-15 |
Time |
14:32 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-09-28 |
Time |
10:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2021-11-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-11-08 |
Time |
08:29 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-11-08 |
Time |
08:29 |
Sent To |
|
|
| Notes |
| 2021-11-08 08:30:39 | ROOFING TO BE DEFERRED |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2022-01-18 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2022-01-18 |
Time |
08:08 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2022-01-18 |
Time |
08:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2021-11-08 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-11-08 |
Time |
08:37 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-11-08 |
Time |
08:37 |
Sent To |
|
|
| Notes |
| 2021-11-08 08:41:45 | SIGNATURE REVIEW | | | | | | DRAWINGS S2.2, X0.1, A10.2, E0.01, T1.0 DO NOT SHOW AS | | | DIGITALLY SIGNED IN ADOBE READER - | | | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-10-14 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-10-14 |
Time |
13:41 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-10-14 |
Time |
13:41 |
Sent To |
|
|
| Notes |
| 2021-10-14 13:42:46 | SIGNATURE REVIEW | | | | | | ALL OF THE SIGNED AND SEALED DRAWINGS IN PROJECTDOX DO | | | NOT SHOW AS DIGITALLY SIGNED IN ADOBE READER - SIGNED | | | AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | | DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR | | | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | | E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES | | | NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN | | | DROP OFF THE ORIGINAL SIGNED AND SEALED | | | DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING | | | DIVISION AT THE CITY HALL. | | | | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2022-01-20 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2022-01-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2022-01-20 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2021-11-16 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2021-11-16 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2021-11-16 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-11-16 09:19:13 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) UPDATED SIGNED AND SEALED SURVEY OF THE PROPERTY | | | REQUIRED. [10/13/2021 REPEAT COMMENT: SURVEY NOT | | | PROVIDED IN THE LATEST RESUBMITTAL.] | | | | | | | | | NOTES: | | | | | | * PLAN SHOWS THAT THERE ARE IMPROVEMENTS TO THE | | | PAVING/PARKING LOT STRIPING. THE SCOPE OF WORK DOES NOT | | | COVER THE PARKING LOT. A SEPARATE PERMIT IS REQUIRED | | | FOR THE STRIPING OF ACCESSIBLE PARKING SPACES AS NOTED | | | IN THE SITE PLAN. | | | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | * ZONE: MF32 | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-10-13 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2021-10-13 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
2021-10-13 |
Time |
|
Sent To |
|
|
| Notes |
| 2021-10-13 14:19:34 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) UPDATED SIGNED AND SEALED SURVEY OF THE PROPERTY | | | REQUIRED. | | | | | | 2.) SHOW LOCATION OF THE SCOPE OF WORK IN THE SITE | | | PLAN. ALSO SHOW SETBACK DIMENSIONS (WHERE NECESSARY) | | | WITHIN THE SITE PLAN TO DEMONSTRATE COMPLIANCE WITH THE | | | SETBACK REQUIREMENTS OF THE CITY'S ZONING AND LAND | | | DEVELOPMENT REGULATIONS (ZLDRS). [ZLDR S.94-77, | | | S,.94-304 AND S.94-305] | | | | | | | | | NOTES: | | | | | | * ANY REVISIONS MAY RESULT IN ADDITIONAL COMMENTS. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | * ZONE: MF32 | | | |
|
|