Plan Review Details - Permit 21091021
Plan Review Stops For Permit 21091021
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-12-20 Cont ID  
Sent By rmcphers Date 2021-12-20 Time 09:58 Rev Time 0.00
Received By rmcphers Date 2021-12-20 Time 09:58 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-11-01 Cont ID  
Sent By rmcphers Date 2021-11-01 Time 15:55 Rev Time 0.00
Received By rmcphers Date 2021-11-01 Time 15:55 Sent To  
Notes
2021-11-01 16:15:11PRESSUREIZATION
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
 1) CODE IN EFFECT CHANGED ON 1/1/21 - PLEASE REVISE THE
 PLANS TO SHOW THE DESIGN PER THE CODE IN EFFECT (2020
 FBC USING ASCE 7-16)
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2022-01-11 Cont ID  
Sent By jleahy Date 2022-01-11 Time 10:55 Rev Time 0.00
Received By jleahy Date 2022-01-10 Time 16:19 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-10-21 Cont ID  
Sent By jleahy Date 2021-10-21 Time 12:13 Rev Time 0.00
Received By jleahy Date 2021-10-21 Time 11:40 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-12-16 Cont ID  
Sent By cwalker Date 2021-12-16 Time   Rev Time 0.00
Received By cwalker Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-10-06 Cont ID  
Sent By pleduc Date 2021-10-06 Time   Rev Time 0.00
Received By pleduc Date 2021-10-04 Time 14:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-01-11 Cont ID  
Sent By jleahy Date 2022-01-11 Time 10:55 Rev Time 0.00
Received By jleahy Date 2021-12-15 Time 16:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-11-01 Cont ID  
Sent By rmcphers Date 2021-11-01 Time 16:00 Rev Time 0.00
Received By rmcphers Date 2021-09-30 Time 15:02 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-12-17 Cont ID  
Sent By medwards Date 2021-12-17 Time 08:37 Rev Time 0.00
Received By medwards Date 2021-12-17 Time 08:37 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-10-05 Cont ID  
Sent By medwards Date 2021-10-05 Time 15:48 Rev Time 0.00
Received By medwards Date 2021-10-05 Time 15:48 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-12-17 Cont ID  
Sent By medwards Date 2021-12-17 Time 08:37 Rev Time 0.00
Received By medwards Date 2021-12-17 Time 08:37 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-11-01 Cont ID  
Sent By rmcphers Date 2021-11-01 Time 15:55 Rev Time 0.00
Received By rmcphers Date 2021-11-01 Time 15:55 Sent To  
Notes
2021-11-01 16:00:07SIGNATURE REVIEW
  
 ALL DRAWINGS NEED TO BE SIGNED AND SEALED BY THE
 DESIGNER FBC WPB 107.1
  
 ALL OF THE DRAWINGS DO NOT SHOW AS DIGITALLY SIGNED IN
 ADOBE READER -
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN
 DROP OFF THE ORIGINAL SIGNED AND SEALED
 DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING
 DIVISION AT THE CITY HALL.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
  
  