Plan Review Details - Permit 21090851
Plan Review Stops For Permit 21090851
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2021-10-05 Cont ID  
Sent By cpuell Date 2021-10-05 Time 15:03 Rev Time 0.00
Received By cpuell Date 2021-10-05 Time 15:03 Sent To  
Notes
2021-10-05 15:04:00ADDRESS PRIVIOUSLY AGREED UPON

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-11-01 Cont ID  
Sent By rmcphers Date 2021-11-01 Time 16:37 Rev Time 0.00
Received By rmcphers Date 2021-11-01 Time 16:37 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-11-01 Cont ID  
Sent By fgiaquin Date 2021-11-01 Time 22:57 Rev Time 0.00
Received By fgiaquin Date 2021-11-01 Time 21:57 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2021-10-15 Cont ID  
Sent By rrossano Date 2021-10-15 Time   Rev Time  
Received By rrossano Date 2021-10-15 Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-10-08 Cont ID  
Sent By   Date 2021-10-08 Time   Rev Time 0.00
Received By bdolan Date 2021-10-08 Time 11:13 Sent To  
Notes
2021-10-08 11:20:05THE FOLLOWING COMMENTS WERE SUBMITTED BY LT. BRIAN
 DOLAN, DIVISION OF FIRE PREVENTION, WEST PALM BEACH
 FIRE RESCUE.
  
 ANY AND ALL WORK ON THE FIRE ALARM SYSTEM SHALL BE DONE
 BY A FIRE ALARM CONTRACTOR. A SEPARATE SHOP DRAWING
 COMPLIANT WITH NFPA 72 IS REQUIRED TO BE SUBMITTED,
 REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU
 PRIOR TO ANY INSTALLATION.
  
 ALL WORK ON THE FIRE SPRINKLER SYSTEM IAND/OR FIRE
 UNDERGROUND S REQUIRED TO BE COMPLETED BY A CERTIFIED
 CONTRACTOR AND SHALL COMPLY WITH APPLICABLE CODES.
 SEPARATE SHOP DRAWINGS, ARE REQUIRED TO BE SUBMITTED,
 REVIEWED AND APPROVED BY THE FIRE PREVENTION BUREAU
 PRIOR TO ANY INSTALLATION AND WORK ON THE SYSTEMS
  
 HYDROSTATIC TESTS. ALL PIPING AND ATTACHED
 APPURTENANCES SUBJECTED TO SYSTEM WORKING PRESSURE
 SHALL BE HYDROSTATICALLY TESTED AT 200 PSI (13.8 BAR)
 AND SHALL MAINTAIN THAT PRESSURE WITHOUT LOSS FOR 2
 HOURS.
  
  
 PER CITY CODES, ALL WORK IS SUBJECT TO FIELD
 INSPECTIONS AND APPROVAL.
  
 LT. BRIAN DOLAN
 DIVISION OF FIRE PREVENTION
 561-804-4752
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-11-01 Cont ID  
Sent By fgiaquin Date 2021-11-01 Time 22:57 Rev Time 0.00
Received By fgiaquin Date 2021-10-06 Time 11:19 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date 2021-10-21 Cont ID  
Sent By rbrown Date 2021-10-21 Time 19:22 Rev Time 0.00
Received By rbrown Date 2021-10-21 Time 19:21 Sent To  
Notes
2021-10-21 19:23:19PER 10/21/21 EMAIL FROM DERREK MOORE, IMPACT FEE
 OFFICE, IT IS OK TO ISSUE THE FOUNDATION PERMIT PRIOR
 TO PAYMENT OF IMPACT FEES WHICH MUST BE PAID PRIOR TO
 ISSUANCE OF BUILDING PERMIT 21070679.

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-10-25 Cont ID  
Sent By lcrespo Date 2021-10-25 Time 09:07 Rev Time 0.00
Received By lcrespo Date 2021-10-25 Time 09:07 Sent To  
Notes
2021-10-25 09:08:13FOUNDATION FOR NEW SFPGA BUILDING (BLDG PERMIT
 21070679)
  
 10/25/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-11-01 Cont ID  
Sent By rmcphers Date 2021-11-01 Time 16:50 Rev Time 0.00
Received By rmcphers Date 2021-11-01 Time 16:50 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-10-18 Cont ID  
Sent By jroach Date 2021-10-18 Time 11:17 Rev Time 0.00
Received By jroach Date 2021-10-18 Time 11:17 Sent To  
Notes
2021-10-18 11:18:44ZONING PLAN REVIEW
 ________________________________________
  
 DATE OF REVIEW: 10.18.2021
 PERMIT NO.: 21090851
 ________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ________________________________________
  
 THIS REVIEW IS FOR THE FOUNDATION OF THE SFPGA OFFICE
 BUILDING ONLY. THIS REVIEW HAS BEEN PASSED SUBJECT TO
 THE FOLLOWING PROVISOS:
  
 1. IN ADDITION TO PERMITS FOR THE STRUCTURE, SEPARATE
 PERMITS ARE ALSO REQUIRED FOR:
  
 1.1. LANDSCAPING
 1.2. FENCING/GATES
 1.3. SITE/PRIVACY WALLS
 1.4. SITE LIGHTING
 1.5. IRRIGATION
 1.6. GENERATOR
 1.7. SIGNAGE
 1.8. PARING LOT / STRIPING / HARDSCAPE
 1.9. SITE FIXTURES (I.E. BIKE RACKS, ETC.)
  
 2. THE WPB GOLF PARK DEVELOPMENT SHALL BE SUBJECT TO
 ALL DEVELOPMENT ORDER CONDITIONS, AS OUTLINED IN FORMAL
 SITE PLAN REVIEW (FSPR) CASE NO. 21-02, AND AS MAY BE
 AMENDED. ALL CONDITIONS OF APPROVAL IMPOSED BY FSPR
 CASE NO. 21-02, AS AMENDED, SHALL BE ADDRESSED WITHIN
 THE APPROPRIATE SPECIFIED TIMEFRAMES.
  
 3. A REVISION TO THE BUILDING AND LANDSCAPE PERMITS
 SHALL BE SUBMITTED AND APPROVED TO REVISE THE PLANS AND
 ACCURATELY REFLECT THE FOLLOWING:
  
 3.1 DETAIL ON THE MARKING FOR COMPACT PARKING SPACES.
 ________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved