Plan Review Stops For Permit 21090740
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2021-09-24 Cont ID  
Sent By rmcdouga Date 2021-09-24 Time 17:16 Rev Time 0.00
Received By rmcdouga Date 2021-09-24 Time 17:16 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-09-24 Cont ID  
Sent By rmcdouga Date 2021-09-24 Time 17:26 Rev Time 0.00
Received By rmcdouga Date 2021-09-24 Time 17:26 Sent To  
Notes
2021-09-24 17:28:04ELECTRICAL AND MECHANICAL SUB-PERMITS ARE REQUIRED. NO
 PLUMBING WORK IS SHOWN ON THE PLANS.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-09-29 Cont ID  
Sent By jleahy Date 2021-09-29 Time 11:01 Rev Time 0.00
Received By jleahy Date 2021-09-29 Time 11:01 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-09-28 Cont ID  
Sent By jleahy Date 2021-09-28 Time 11:28 Rev Time 0.00
Received By jleahy Date 2021-09-28 Time 11:21 Sent To  
Notes
2021-09-28 11:29:28ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 WEST PALM BEACH PLAN REVIEW NEEDS AN ELECTRICAL PERMIT
 APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL
 PERMIT APPLICATION TO [email protected] AND
 [email protected] SO WE RECEIVE IT ALSO. WHEN THIS EMAIL
 IS RECEIVED ONE OF THE REVIEWERS WILL APPROVE THE PLAN
 REVIEW.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-09-23 Cont ID  
Sent By pleduc Date 2021-09-23 Time   Rev Time 0.00
Received By pleduc Date 2021-09-23 Time 09:23 Sent To  
Notes
2021-09-23 09:28:27FIRE PROVISO:
  
 MAINTAIN FIRE SPRINKLER & FIRE ALARM SYSTEMS
 THROUGHOUT DEMO AND RE-CONSTRUCTION.
  
 ALL FIRE SPRINKLER & FIRE ALARM WORK. INCLUDING DEMO,
 SHALL BE DONE UNDER SEPARATE PERMITS & SHOP DRAWINGS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-09-28 Cont ID  
Sent By jleahy Date 2021-09-28 Time 11:30 Rev Time 0.00
Received By jleahy Date 2021-09-16 Time 13:18 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-09-27 Cont ID  
Sent By medwards Date 2021-09-27 Time 07:18 Rev Time 0.00
Received By medwards Date 2021-09-27 Time 07:18 Sent To  
Notes
***NONE***

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status N Date 2021-09-24 Cont ID  
Sent By rmcdouga Date 2021-09-24 Time 17:20 Rev Time 0.00
Received By rmcdouga Date 2021-09-24 Time 17:20 Sent To  
Notes
2021-09-24 17:20:50PROJECT IS NOT IN A SPECIAL FLOOD HAZARD AREA.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-09-17 Cont ID  
Sent By pvalenti Date 2021-09-17 Time 08:13 Rev Time 0.00
Received By pvalenti Date 2021-09-17 Time 08:12 Sent To  
Notes
2021-09-17 08:15:23 
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 SIGNATURE REVIEW APPROVED BY SUBMITTED PAPER PLAN
 SHEET. PAPER PLAN SHEET SIGNED/SEALED ROUTED TO
 STORAGE.