Review Stop AD ADDRESSING
Rev No 3 Status P Date 2021-11-01 Cont ID  
Sent By cpuell Date 2021-11-01 Time 09:49 Rev Time 0.00
Received By cpuell Date 2021-11-01 Time 09:49 Sent To  
Notes
***NONE***

Review Stop AD ADDRESSING
Rev No 2 Status P Date 2021-10-18 Cont ID  
Sent By cpuell Date 2021-10-18 Time 10:06 Rev Time 0.00
Received By cpuell Date 2021-10-18 Time 10:06 Sent To  
Notes
2021-10-18 10:06:55WORK BEING DONE ON 235 DYER RD # B

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2021-10-05 Cont ID  
Sent By cpuell Date 2021-10-05 Time 11:55 Rev Time 0.00
Received By cpuell Date 2021-10-05 Time 11:42 Sent To  
Notes
2021-10-05 11:56:37PLEASE CONFIRM THAT WORK IS BEING DONE ON 235 DYER RD #
 B. PLEASE EMAIL [email protected] OR CALL 561-805-6659

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-11-01 Cont ID  
Sent By cthroop Date 2021-11-01 Time 12:36 Rev Time 0.00
Received By cthroop Date 2021-11-01 Time 12:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-10-18 Cont ID  
Sent By cthroop Date 2021-10-18 Time 11:42 Rev Time 0.00
Received By cthroop Date 2021-10-18 Time 11:34 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-09-25 Cont ID  
Sent By cthroop Date 2021-09-25 Time 12:00 Rev Time 0.00
Received By cthroop Date 2021-09-25 Time 11:36 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2021-10-18 Cont ID  
Sent By jleahy Date 2021-10-18 Time 13:19 Rev Time 0.00
Received By jleahy Date 2021-10-18 Time 13:19 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-10-14 Cont ID  
Sent By jleahy Date 2021-10-14 Time 13:14 Rev Time 0.00
Received By jleahy Date 2021-10-06 Time 14:35 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-09-25 Cont ID  
Sent By cthroop Date 2021-09-25 Time 12:00 Rev Time 0.00
Received By cthroop Date 2021-09-25 Time 11:36 Sent To  
Notes
***NONE***

Review Stop E-LOWVOLT ELECTRICAL LOW VOLTAGE
Rev No 1 Status P Date 2021-09-25 Cont ID  
Sent By cthroop Date 2021-09-25 Time 12:00 Rev Time 0.00
Received By cthroop Date 2021-09-25 Time 11:51 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2021-09-20 Cont ID  
Sent By lcrespo Date 2021-09-20 Time 14:15 Rev Time 0.00
Received By lcrespo Date 2021-09-20 Time 14:15 Sent To  
Notes
2021-09-20 14:16:15GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT
 BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND
 PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  
 NOTE: YOU MAY CHOOSE TO HAVE A GAS REVIEW DONE THIS
 TIME AND ADDRESS THE COMMENTS ABOVE. THIS WILL HAVE THE
 GAS APPROVE FOR A SUB PERMIT, OR IF YOU DECIDED NOT TO
 ADDRESS THESE COMMENTS, PLEASE PUT A NOTE ON THE GAS
 HEATER (A SEPARATE PERMIT BY A LICENSED CONTRACTOR FOR
 THE GAS SYSTEM). THEN PLEASE TAKE OFF ANY GAS SHOWN ON
 PLANS; THESE COMMENTS CAN BE FORWARD TO THE GAS
 CONTRACTOR FOR REFERENCE. AN N WILL BE PUT ON THIS
 REVIEW, WHICH STANDS FOR NOT REQUIRED, BUT A SUB PERMIT
 WON'T BE ISSUED ONCE A REVIEW IS DONE FOR THAT SUB
 PERMIT, SO PLEASE BE ADVISED ON THIS PROCEDURE.
  

Review Stop HIST HISTORICAL
Rev No 1 Status N Date 2021-10-18 Cont ID  
Sent By fmittner Date 2021-10-18 Time 13:13 Rev Time 0.00
Received By fmittner Date 2021-10-18 Time 13:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-11-01 Cont ID  
Sent By lcrespo Date 2021-11-01 Time 12:41 Rev Time 0.00
Received By lcrespo Date 2021-11-01 Time 07:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status P Date 2021-10-18 Cont ID  
Sent By jleahy Date 2021-10-18 Time 13:25 Rev Time 0.00
Received By jleahy Date 2021-10-04 Time 09:42 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-09-25 Cont ID  
Sent By cthroop Date 2021-09-25 Time 12:01 Rev Time 0.00
Received By cthroop Date 2021-09-16 Time 10:10 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2021-11-01 Cont ID  
Sent By lcrespo Date 2021-11-01 Time 12:40 Rev Time 0.00
Received By lcrespo Date 2021-11-01 Time 12:40 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2021-10-06 Cont ID  
Sent By lcrespo Date 2021-10-06 Time 11:27 Rev Time 0.00
Received By lcrespo Date 2021-10-06 Time 11:27 Sent To  
Notes
2021-10-06 11:33:0510/06/21 2ND PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE NOW,
 AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE GENERATED
 UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SECOND REQUEST, A WASHING MACHINE HOOK-UP FOR THIS
 UNIT AS REQUIRED IN THE 2020 FBC SEC. P TABLE 403.1
  
 3. ON SHEET A-5B FOR THE SECOND FLOOR SHOWS A TANK-LESS
 WATER HEATER, AND THE LOCATION IS ON THE SECOND FLOOR
 IS NOT ACCESSIBLE FOR SERVICE PER MANUFACTURERS
 SPECIFICATION. WOULD YOU PLEASE PROVIDE A DIFFERENT
 LOCATION AND GIVE THE DISTANCE OF ANY OPERABLE DOORS OR
 WINDOWS IN RELATION TO THE WATER HEATER? THE SITE OF
 THE WATER HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS. THE HOUSE PLAN CAN BE
 HAND-DRAWN PER THE WPB AMENDMENTS TO THE FBC SEC.
 107.2.1. INFORMATION ON CONSTRUCTION DOCUMENTS.
  
 4. HOT WATER LINES NOT IN CONDITION SPACE NEED TO BE
 INSULATED WITH A MINIMUM R-3 PER THE 2020 FBC SEC. RE
 403.5.3. WOULD YOU PLEASE PLACE A NOTE ON PLANS?
  
 5. A SUB GAS PERMIT IS REQUIRED BY A LICENSED
 CONTRACTOR FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS
 TO THE FBC SEC. 105.1. WOULD YOU PLEASE PLACE A NOTE ON
 PLANS?
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, DESCRIBING THE REVISION MADE,
 IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE THE
 CHANGES CAN BE FOUND, WILL HELP EXPEDITE YOUR PERMIT.
 THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-10-18 Cont ID  
Sent By lcrespo Date 2021-09-20 Time 14:14 Rev Time 0.00
Received By lcrespo Date 2021-09-20 Time 14:14 Sent To  
Notes
2021-09-20 14:14:2310/18/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-10-18 Cont ID  
Sent By lcrespo Date 2021-10-18 Time 11:25 Rev Time 0.00
Received By lcrespo Date 2021-10-18 Time 11:25 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-09-25 Cont ID  
Sent By cthroop Date 2021-09-25 Time 12:01 Rev Time 0.00
Received By cthroop Date 2021-09-25 Time 11:36 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-10-28 Cont ID  
Sent By fmittner Date 2021-10-18 Time 13:13 Rev Time 0.00
Received By fmittner Date 2021-10-28 Time 12:57 Sent To  
Notes
2021-10-18 13:14:00PLANS SHOW ADDITION OF COOKTOP. NO ADDITIONAL UNITS
 PERMITTED ON SITE.