Plan Review Details - Permit 21090284
Plan Review Stops For Permit 21090284
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-11-24 Cont ID  
Sent By rmcphers Date 2021-11-24 Time 10:57 Rev Time 0.00
Received By rmcphers Date 2021-11-24 Time 10:57 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2021-11-03 Cont ID  
Sent By rmcphers Date 2021-11-03 Time 07:33 Rev Time 0.00
Received By rmcphers Date 2021-11-03 Time 07:33 Sent To  
Notes
2021-11-03 07:34:56CANOPY
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED -
 1) DRAWING E 1 SHOWS 2017 FBC - CODE IN EFFECT CHANGED
 ON 1/1/2021 - PLEASE REVISE THE PLANS TO SHOW THE CODE
 IN EFFECT (2020 FBC USING ASCE 7-16)

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-10-01 Cont ID  
Sent By rmcphers Date 2021-10-01 Time 15:46 Rev Time 0.00
Received By rmcphers Date 2021-10-01 Time 15:34 Sent To  
Notes
2021-10-01 15:46:24CANOPY
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED -
 1) CODE IN EFFECT CHANGED ON 1/1/2021 - PLEASE REVISE
 THE PLANS TO SHOW THE CODE IN EFFECT (2020 FBC USING
 ASCE 7-16)

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-09-10 Cont ID  
Sent By pleduc Date 2021-09-10 Time   Rev Time 0.00
Received By pleduc Date 2021-09-10 Time 10:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-11-24 Cont ID  
Sent By rmcphers Date 2021-11-24 Time 10:57 Rev Time 0.00
Received By rmcphers Date 2021-11-18 Time 13:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-11-03 Cont ID  
Sent By rmcphers Date 2021-11-03 Time 07:35 Rev Time 0.00
Received By rmcphers Date 2021-10-25 Time 13:02 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-10-01 Cont ID  
Sent By rmcphers Date 2021-10-01 Time 15:46 Rev Time 0.00
Received By rmcphers Date 2021-09-07 Time 13:58 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-11-19 Cont ID  
Sent By mpeterso Date 2021-11-19 Time 07:45 Rev Time 0.00
Received By mpeterso Date 2021-11-19 Time 07:45 Sent To  
Notes
2021-11-19 07:47:49PAPER PLANS LABELED "E1,E2 AND E3" HAVE BEEN SUBMITTED
 AND APPROVED WITH A WET SIGNATURE AND SEAL

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2021-10-25 Cont ID  
Sent By mpeterso Date 2021-10-25 Time 13:40 Rev Time 0.00
Received By mpeterso Date 2021-10-25 Time 13:40 Sent To  
Notes
2021-10-25 13:52:25IT APPEARS AS THAT ON 9/7/2021 (1) PAPER PLAN WAS
 SUBMITTED, (E-3 SECTIONS) ,THAT HAD THE REQUIRED SEAL
 AND WET SIGNATURE.THEN ON 10/25/2021, (2) ADDITIONAL
 PAPER PLANS WERE SUBMITTED. THESE PLANS DO NOT HAVE AN
 ENGINEERS SEAL AND ONLY HAVE A COPY OF A DIGITAL
 SIGNATURE OF DORTHY BANZANSZEWSKI P.E.
 PAPER PLANS REQUIRE AN ENGINEERS SEAL WITH A WET
 SIGNATURE AS NOTED BELOW. PLEASE FOLLOW THE
 INSTRUCTIONS BELOW TO CORRECT THIS ISSUE.
  
 FS471/FS481 DOCUMENTS PREPARED BY AN ARCHITECT OR
 ENGINEER AND SUBMITTED FOR PUBLIC RECORD ARE TO BE
 SIGNED, SEALED, DATED ORIGINALS OR DIGITALLY SEALED AND
 SIGNED.
  
 EITHER UPLOAD A DIGITALLY OR ELECTRONICALLY SIGNED PLAN
 TO THE SIGNATURE FOLDER WITH YOUR RESUBMITTAL (IF
 APPLICABLE) AND COMPLETE THE UPLOAD TASK IN PROJECTDOX,
 OR YOU CAN SUBMIT ONE ORIGINAL SIGNED AND SEALED PAPER
 ORIGINAL WITH A WET SIGNATURE TO THE BUILDING DIVISION.
 SIGNATURE DOCUMENTS ARE TYPICALLY REVIEWED WITHIN TWO
 BUSINESS DAYS AFTER SUBMITTAL; DIGITALLY SIGNED
 DOCUMENTS ARE PREFERRED.
  
 PLEASE EMAIL [email protected] AND CC TO
 [email protected]
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-09-07 Cont ID  
Sent By ccole Date 2021-09-07 Time 18:27 Rev Time 0.00
Received By ccole Date 2021-09-07 Time 18:22 Sent To  
Notes
2021-09-07 18:29:03 
 REVIEW OF SIGNATURE AND SEAL ON PAPER PLANS AND
 DOCUMENTS APPROVED AND PLANS ROUTED TO STORAGE.
  

Review Stop Z ZONING
Rev No 1 Status P Date 2021-09-23 Cont ID  
Sent By awooten Date 2021-09-23 Time   Rev Time  
Received By awooten Date 2021-09-23 Time   Sent To  
Notes
***NONE***