Review Stop E ELECTRICAL
Rev No 3 Status F Date 2021-12-07 Cont ID  
Sent By mpeterso Date 2021-12-07 Time 08:32 Rev Time 0.00
Received By mpeterso Date 2021-12-07 Time 08:31 Sent To  
Notes
2021-12-07 08:33:46NO NEW SUBMITTALS SINCE LAST REVIEW ON 10/27/21. SAME
 COMMENTS AS NOTED ON 10/27/21

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2021-10-27 Cont ID  
Sent By jleahy Date 2021-10-27 Time 15:24 Rev Time 0.00
Received By jleahy Date 2021-10-27 Time 15:24 Sent To  
Notes
2021-10-27 15:27:04ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 1) DRAWING SHOWS MORE THAN (1) SERVICE SUPPLYING THE
 BUILDING.
 2) NEC ARTICLE 230.2 OUTLINES THE CIRCUMSTANCES WHEN
 TWO SERVICES MAY SERVE THE SAME BUILDING. THIS DRAWING
 DOES NOT MEET THE CONDITION OUTLINED BY NEC FOR MORE
 THAN ONE ELECTRIC SERVICE EXCEPTION.
 3) PERMIT STATES NEW 150A SERVICE, DOES THIS REPLACE
 THE OLD SERVICE???
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-09-29 Cont ID  
Sent By jleahy Date 2021-09-29 Time 16:35 Rev Time 0.00
Received By jleahy Date 2021-09-29 Time 16:32 Sent To  
Notes
2021-09-29 16:36:36ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 NEED TO SHOW A RISER DIAGRAM AND LOAD CALCULATION 215.5

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-12-07 Cont ID  
Sent By mpeterso Date 2021-12-07 Time 08:34 Rev Time 0.00
Received By mpeterso Date 2021-12-07 Time 08:34 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-10-27 Cont ID  
Sent By jleahy Date 2021-10-27 Time 15:29 Rev Time 0.00
Received By jleahy Date 2021-10-05 Time 08:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-09-29 Cont ID  
Sent By jleahy Date 2021-09-29 Time 16:36 Rev Time 0.00
Received By jleahy Date 2021-09-03 Time 09:45 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-12-07 Cont ID  
Sent By mpeterso Date 2021-12-07 Time 08:34 Rev Time 0.00
Received By mpeterso Date 2021-12-07 Time 08:34 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-10-27 Cont ID  
Sent By jleahy Date 2021-10-27 Time 15:29 Rev Time 0.00
Received By jleahy Date   Time   Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-09-29 Cont ID  
Sent By jleahy Date 2021-09-29 Time 16:35 Rev Time 0.00
Received By jleahy Date 2021-09-29 Time 16:32 Sent To  
Notes
2021-09-29 16:35:31PLAN IS REQUIRED TO BE SIGNED AND SEALED BY A DESIGN
 PROFESSIONAL OR THE ELECTRICAL CONTRACTOR QUALIFIER. FS
 471.003(2)(H); 471.025; FBC 107.2.1