Plan Review Details - Permit 21090054
Plan Review Stops For Permit 21090054
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-09-03 Cont ID  
Sent By pvalenti Date 2021-09-03 Time 14:24 Rev Time 0.00
Received By pvalenti Date 2021-09-03 Time 13:35 Sent To  
Notes
2021-09-03 14:25:55****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 ASBESTOS REQUIREMENTS:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN PDF
 FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE INCLUDE
 THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT LINE.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-09-03 Cont ID  
Sent By pvalenti Date 2021-09-03 Time 13:45 Rev Time 0.00
Received By pvalenti Date 2021-09-03 Time 13:35 Sent To  
Notes
2021-09-03 14:24:41****CORRECTIONS****
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
 NOTE: A UTILITY RELEASE MAY NOT BE REQUIRED. IF THE
 SERVICE IS TO REMAIN TO THE PROPERTY, AN ELECTRICIAN
 WILL HAVE TO CONFIRM THAT ELECTRICITY HAS BEEN
 DISCONNECTED AND AREA IS SAFE FOR DEMOLITION.
  
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 WATER DOWN METHOD DURING DEMOLITION:
 IF A WATER TRUCK IS DESIRED, PROVIDE A LETTER STATING
 THAT THE WATER TRUCK WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION AND ONLY POTABLE WATER FROM AN
 OFF-SITE LOCATION WILL BE USED. ALSO, PROVIDE DETAILS
 OF THE WATER TRUCK INCLUDING CAPACITY OF WATER TANK.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE
 NOTED ON THEIR FORM.
 BACKFLOW - BEFORE SCHEDULING THE 703, THE BACKFLOW
 DEVICE NEEDS TO BE TESTED AND CERTIFIED BY THE CITY?S
 UTILITIES DEPT, 561-822-2244.
 FAX THE COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 NOTE: THIS ITEM MAY NOT BE REQUIRED.
  
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT
 DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED
 FOR RODENTS.
  
 6. COMPLETE THE DEMO DEBRIS FORM:
  
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
  
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
  
 7. PROVIDE A SITE PLAN OR SURVEY SHOWING LOCATION OF
 THE STRUCTURE(S) TO BE DEMOLISHED,
 FBC 107.
  
 8. PROVIDE A STORMWATER POLLUTION PREVENTION PLAN.
 NOTE: INDICATE ON SITE-PLAN LOCATION OF SILT FENCE.
  
 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING
 ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
  
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2021-09-08 Cont ID  
Sent By rrossano Date 2021-09-08 Time   Rev Time  
Received By rrossano Date 2021-09-08 Time   Sent To  
Notes
2021-09-08 10:55:31PLEASE ADDRESS BUILDING COMMENTS.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-09-10 Cont ID  
Sent By fmittner Date 2021-09-10 Time 12:48 Rev Time 0.00
Received By fmittner Date 2021-09-10 Time 12:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-09-14 Cont ID  
Sent By cthroop Date 2021-09-14 Time 10:58 Rev Time 0.00
Received By cthroop Date 2021-09-02 Time 15:55 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-09-02 Cont ID  
Sent By rmcphers Date 2021-09-02 Time 16:36 Rev Time 0.00
Received By rmcphers Date 2021-09-02 Time 16:36 Sent To  
Notes
2021-09-02 16:36:41ORIGINAL SIGNED AND SEALED DRAWINGS TO STORAGE

Review Stop Z ZONING
Rev No 1 Status P Date 2021-09-10 Cont ID  
Sent By fmittner Date 2021-09-10 Time 12:48 Rev Time 0.00
Received By fmittner Date 2021-09-10 Time 12:47 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved