| Plan Review Stops For Permit 21081247 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2021-11-30 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-11-30 |
Time |
17:16 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-11-30 |
Time |
16:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2021-11-17 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-11-17 |
Time |
17:29 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-11-17 |
Time |
16:47 |
Sent To |
|
|
| Notes |
| 2021-11-17 17:38:07 | RESIDENTIAL (R3) ALTERATION, BUILDING REVIEW COMMENTS | | | CODE: FBC 7TH EDITION (2020) AND CITY AMENDMENTS. | | | PERMIT #21081247 | | | | | | 1- PLANS SUBMITTED THE FIRST TIME HAD THE NAME, | | | SIGNATURE AND LICENSE NUMBER OF THE GENERAL CONTRACTOR | | | DOING THE WORK. DRAWINGS SUBMITTED NOW ARE MISSING THE | | | SIGNATURE OF THE GENERAL CONTRACTOR. ALL DRAWINGS TO | | | HAVE THE NAME AND SIGNATURE OF THE LICENSED CONTRACTOR | | | DOING THE WORK AS REQUIRED BY SEC. 107.2.1 CITY | | | AMENDMENTS. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2021-10-12 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-10-12 |
Time |
18:01 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-10-12 |
Time |
17:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-11-20 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2021-11-20 |
Time |
21:02 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2021-11-20 |
Time |
19:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2021-09-20 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2021-09-20 |
Time |
23:05 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2021-09-20 |
Time |
22:15 |
Sent To |
|
|
| Notes |
| 2021-09-20 23:05:55 | ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW. | | | | | | 1. PROVIDE ELECTRICAL PLAN FOR REVIEW, SIGNED AND | | | SEALED BY A LICENSED DESIGN PROFESSIONAL OR SIGNED BY | | | THE ELECTRICAL CONTRACTOR QUALIFIER. IF THERE IS NOT | | | ANY ELECTRICAL WORK INCLUDED WITH THIS PERMIT, STATE | | | THAT ON PLAN. FS 471.003(2)(H); 471.025; WPB FBC | | | 107.2.1, 107.3.5 | | | | | | END OF COMMENTS. | | | | | | PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN | | | RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES | | | INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE | | | PREVIOUSLY REVIEWED SHEETS. | | | CODES IN EFFECT: | | | | | | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B | | | UILDING-PERMIT-FORMS | | | | | | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION | | | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE 2020 7TH ED. | | | FBC EB = FLORIDA BUILDING CODE EXISTING BUILDING 2020 | | | 7TH EDITION | | | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 | | | 7TH EDITION | | | FBC RE = FLORIDA RESIDENTIAL CODE 2020 7TH EDITION | | | NEC = NFPA 70 2017 EDITION, NATIONAL ELECTRICAL CODE | | | FS = FLORIDA STATUTES | | | | | | V/R, | | | | | | FRANK GIAQUINTO III | | | ELECTRICAL INSPECTOR | | | ELECTRICAL PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | [email protected] | | | CELL: 561-805-6744 | | | | | | | | | | | | | | | PROVIDE ELECTRICAL PLAN FOR REVIEW, SIGNED AND SEALED | | | BY A LICENSED DESIGN PROFESSIONAL OR SIGNED BY THE | | | ELECTRICAL CONTRACTOR QUALIFIER. IF THERE IS NOT ANY | | | ELECTRICAL WORK INCLUDED WITH THIS PERMIT, STATE THAT | | | ON PLAN. FS 471.003(2)(H); 471.025; WPB FBC 107.2.1, | | | 107.3.5 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2021-11-30 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-11-30 |
Time |
17:16 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-11-30 |
Time |
16:31 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-11-20 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2021-11-20 |
Time |
21:02 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
2021-11-04 |
Time |
16:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-10-12 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-10-12 |
Time |
18:01 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-08-25 |
Time |
13:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2021-08-28 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-08-28 |
Time |
09:59 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-08-28 |
Time |
09:59 |
Sent To |
|
|
| Notes |
| 2021-08-28 09:59:56 | NO MECHANICAL WORK SHOWN UNDER THIS PROJECT. ME |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2021-11-05 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-11-05 |
Time |
12:52 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-11-05 |
Time |
12:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-09-09 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-09-09 |
Time |
15:41 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-09-09 |
Time |
15:41 |
Sent To |
|
|
| Notes |
| 2021-09-09 15:42:04 | 09/09/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
N |
Date |
2021-11-20 |
|
|
Cont ID |
|
| Sent By |
fgiaquin |
Date |
2021-11-20 |
Time |
21:02 |
Rev Time |
0.00 |
| Received By |
fgiaquin |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
N |
Date |
2021-10-12 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2021-10-12 |
Time |
17:55 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2021-10-12 |
Time |
17:55 |
Sent To |
|
|
| Notes |
| 2021-11-18 09:31:40 | PLANS NOT DONE BY ARCHITECT OR ENGINEER. JG. |
|
|