Plan Review Details - Permit 21080792
Plan Review Stops For Permit 21080792
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 3 Status P Date 2022-03-25 Cont ID  
Sent By jleahy Date 2022-03-25 Time 12:23 Rev Time 0.00
Received By jleahy Date 2022-03-25 Time 12:23 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2021-09-07 Cont ID  
Sent By shill Date 2021-09-07 Time 12:09 Rev Time 0.00
Received By shill Date 2021-09-07 Time 12:09 Sent To  
Notes
2021-09-07 12:10:18PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN
 PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE
 INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT
 LINE.
  
  
  
  

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-08-21 Cont ID  
Sent By shill Date 2021-08-21 Time 10:57 Rev Time 0.00
Received By shill Date 2021-08-21 Time 10:57 Sent To  
Notes
2021-08-21 10:58:06PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
 THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO
 [email protected]. THE INFORMATION SHOULD BE IN
 PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE
 INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT
 LINE.
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-09-07 Cont ID  
Sent By shill Date 2021-09-07 Time 12:09 Rev Time 0.00
Received By shill Date 2021-09-07 Time 12:09 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-08-21 Cont ID  
Sent By shill Date 2021-08-21 Time 11:00 Rev Time 0.00
Received By shill Date 2021-08-21 Time 10:56 Sent To  
Notes
2021-08-21 11:02:25****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC R = FBC RESIDENTIAL
  
 1. FBC 107, REVISE PLAN TO NOTE IF THE ELEVATOR SHAFTS
 ARE PRESSURIZED OR NOT PRESSURIZED. IF THEY ARE NOT
 PRESSURIZED, THE ELEVATOR LOBBIES ARE REQUIRED TO
 REMAIN IN PLACE AS THEY ARE A PART OF THE LIFE SAFETY
 SYSTEM FOR THE BUILDING.
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2022-03-25 Cont ID  
Sent By jleahy Date 2022-03-25 Time 12:22 Rev Time 0.00
Received By jleahy Date 2022-03-25 Time 12:13 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2021-09-07 Cont ID  
Sent By jleahy Date 2021-09-07 Time 14:46 Rev Time 0.00
Received By jleahy Date 2021-09-07 Time 14:46 Sent To  
Notes
2021-09-07 14:46:54WEST PALM BEACH PLAN REVIEW NEEDS AN ELECTRICAL PERMIT
 APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL
 PERMIT APPLICATION TO [email protected] AND
 [email protected] SO WE RECEIVE IT ALSO. WHEN THIS EMAIL
 IS RECEIVED ONE OF THE REVIEWERS WILL APPROVE THE PLAN
 REVIEW.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-08-19 Cont ID  
Sent By fgiaquin Date 2021-08-19 Time 20:20 Rev Time 0.00
Received By jleahy Date 2021-09-07 Time 14:44 Sent To  
Notes
2021-08-19 20:20:11APPLICATION REQUIRED FROM ELECTRICIAN FOR DEMO

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-09-07 Cont ID  
Sent By pleduc Date 2021-09-07 Time   Rev Time 0.00
Received By pleduc Date 2021-09-07 Time 13:08 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2021-08-24 Cont ID  
Sent By pleduc Date 2021-08-24 Time   Rev Time 0.00
Received By pleduc Date 2021-08-24 Time 09:27 Sent To  
Notes
2021-08-24 09:34:46THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THERE ARE INDICATIONS OF REMOVING THE ELEVATOR LOBBY
 DOORS WITHOUT A RE-INSTALLATION OF THESE DOORS.
  
 ELEVATOR LOBBIES ARE REQUIRED WHERE DESIGNED UNDER THE
 ORIGINAL EOR WHERE THE ELEVATOR SHAFT IS NOT
 PRESSURIZED.
  
 PLEASE REVIEW THE ORIGINAL EOR'S LIFE SAFETY
 REQUIREMENTS AND ENSURE THIS ELEVATOR LOBBY IS NOT
 REQUIRED TO HAVE DOORS.
  
  
 2) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2022-03-25 Cont ID  
Sent By jleahy Date 2022-03-25 Time 12:23 Rev Time 0.00
Received By jleahy Date 2022-03-23 Time 10:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-09-07 Cont ID  
Sent By jleahy Date 2021-09-07 Time 14:47 Rev Time 0.00
Received By jleahy Date 2021-09-03 Time 09:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-08-24 Cont ID  
Sent By ccarvaja Date 2021-08-24 Time 09:37 Rev Time 0.00
Received By ccarvaja Date 2021-08-18 Time 14:06 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2021-09-07 Cont ID  
Sent By medwards Date 2021-09-07 Time 06:18 Rev Time 0.00
Received By medwards Date 2021-09-07 Time 06:18 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-08-20 Cont ID  
Sent By medwards Date 2021-08-20 Time 14:45 Rev Time 0.00
Received By medwards Date 2021-08-20 Time 14:45 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-09-07 Cont ID  
Sent By lcrespo Date 2021-09-07 Time 11:39 Rev Time 0.00
Received By lcrespo Date 2021-09-07 Time 11:39 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-08-20 Cont ID  
Sent By ccole Date 2021-08-20 Time 12:25 Rev Time 0.00
Received By ccole Date 2021-08-20 Time 12:25 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-09-07 Cont ID  
Sent By medwards Date 2021-09-07 Time 06:18 Rev Time 0.00
Received By medwards Date 2021-09-07 Time 06:18 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-08-20 Cont ID  
Sent By medwards Date 2021-08-20 Time 14:46 Rev Time 0.00
Received By medwards Date 2021-08-20 Time 14:45 Sent To  
Notes
***NONE***