| Plan Review Stops For Permit 21080656 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
2 |
Status |
P |
Date |
2021-09-29 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-09-29 |
Time |
15:22 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-09-29 |
Time |
15:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
F |
Date |
2021-09-25 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-09-25 |
Time |
09:44 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-09-25 |
Time |
09:43 |
Sent To |
|
|
| Notes |
| 2021-09-25 09:44:24 | PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE | | | CONTRACTOR, ON LETTERHEAD, STATING THAT THE | | | INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM | | | COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH | | | COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE | | | GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS | | | REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE: | | | | | | HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE | | | S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION- | | | RENOVATION.HTML | | | | | | THE CONTRACTOR ACKNOWLEDGEMENT CAN BE SENT VIA EMAIL TO | | | [email protected]. THE INFORMATION SHOULD BE IN | | | PDF FORMAT AS AN ATTACHMENT TO THE EMAIL. PLEASE | | | INCLUDE THE PERMIT NUMBER AND "ASBESTOS" IN THE SUBJECT | | | LINE. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-10-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-10-21 |
Time |
17:49 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-10-21 |
Time |
17:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-09-25 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-09-25 |
Time |
09:34 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-09-25 |
Time |
09:34 |
Sent To |
|
|
| Notes |
| 2021-09-25 09:37:00 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | FBC R = FBC RESIDENTIAL | | | | | | 1. FBC B 1207, THE FLOORING UNDERLAYMENT PROPOSED WAS | | | TESTED ON AN 8" SLAB. THE RECORDS FOR THIS BUILDING | | | SHOW A 7" POST TENSION SLAB. EITHER PROVIDE TEST | | | REPORTS WITH A 7" OR THINNER SLAB, OR PROPOSE A | | | DIFFERENT UNDERLAYMENT. | | | | | | 2. THE FLAME SPREAD TEST WAS DONE WITH TILE (RESULT | | | WILL TYPICALLY BE 0), BUT TILE IS NOT THE FLOORING | | | PROPOSED, LVT IS PROPOSED. EITHER PROVIDE THE FLAME | | | SPREAD TEST OR CONSIDER PROFLEX'S PRODUCT FOR LVT | | | (PROFLEX LV200). | | | | | | 3. FBC 107 REQUIRES THAT THE PERSON TAKING | | | RESPONSIBLITY FOR THE DESIGN INCLUDE THEIR PRINTED NAME | | | AND SIGNATURE ON EACH PAGE. ONLY FOR PAGES THAT CHANGE | | | AND FOR FUTURE PROJECTS, HAVE THE DESIGNER INCLUDE THIS | | | INFORMATION. | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-10-23 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-10-23 |
Time |
16:52 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-10-23 |
Time |
16:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-09-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-09-28 |
Time |
12:24 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-09-28 |
Time |
11:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2021-10-20 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-10-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-10-20 |
Time |
11:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2021-09-17 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2021-09-17 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2021-09-17 |
Time |
10:06 |
Sent To |
|
|
| Notes |
| 2021-09-17 10:09:14 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | 1) THERE IS AN INDICATION OF THE SPEC SHEET FOR THE | | | FLOOR UNDERLAYMENT, BUT NO SPEC SHEET FOR THE ACTUAL | | | PROPOSED LUXURY VINYL FLOORING. | | | | | | LUXURY VINYL FLOORING IS MANUFACTURED AROUND THE WORLD | | | AND NOT ALL ARE TESTED AND MEETING LISTED AND/OR NFPA | | | STANDARDS. | | | | | | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE SPEC SHEETS | | | OF THE PROPOSED FINISHED FLOORING INDICATING THE FIRE | | | BEHAVIOR RATING. | | | | | | | | | 2) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-10-26 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-10-26 |
Time |
07:20 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-10-18 |
Time |
12:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-09-28 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-09-28 |
Time |
12:24 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-09-16 |
Time |
07:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2021-11-03 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-10-26 |
Time |
06:59 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-10-26 |
Time |
06:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-09-20 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-09-20 |
Time |
15:25 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-09-20 |
Time |
15:25 |
Sent To |
|
|
| Notes |
| 2021-09-20 15:25:40 | 09/20/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-10-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-10-21 |
Time |
18:17 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-10-21 |
Time |
18:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-09-25 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2021-09-25 |
Time |
09:40 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2021-09-25 |
Time |
09:40 |
Sent To |
|
|
| Notes |
| 2021-09-25 09:41:35 | SEE BUILDING; ONLY FIX SHEETS THAT CHANGE AND FUTURE | | | SUBMITTALS. | | | | | | **DO NOT RESUBMIT ALL NEW SHEETS** | | | |
|
|