| Plan Review Stops For Permit 21080253 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-10-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-10-27 |
Time |
15:53 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-10-27 |
Time |
15:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2021-09-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-09-27 |
Time |
09:41 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-09-27 |
Time |
09:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-10-20 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2021-10-20 |
Time |
08:12 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2021-10-20 |
Time |
08:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-09-29 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2021-09-29 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2021-09-29 |
Time |
09:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2021-09-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-09-23 |
Time |
08:38 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-09-23 |
Time |
08:38 |
Sent To |
|
|
| Notes |
| 2021-09-23 08:39:58 | GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN | | | THIS SUBMITTAL PACKAGE, AND A GAS PLAN REVIEW HAS NOT | | | BEEN PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND | | | PLANS WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | | RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT | | | REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER | | | THE WPB AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR | | | FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC | | | SEC. 105.1. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-10-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-10-27 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-10-05 |
Time |
16:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-09-29 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2021-09-29 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2021-09-07 |
Time |
14:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2021-10-06 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-10-06 |
Time |
10:06 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-10-06 |
Time |
10:06 |
Sent To |
|
|
| Notes |
| 2021-10-06 10:07:07 | 10/06/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-09-23 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-09-23 |
Time |
09:01 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-09-23 |
Time |
08:40 |
Sent To |
|
|
| Notes |
| 2021-09-23 09:02:05 | 09/23/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-10-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-10-27 |
Time |
15:54 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-10-27 |
Time |
15:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2021-09-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-09-27 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-09-27 |
Time |
09:17 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2021-10-22 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2021-10-22 |
Time |
17:04 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-10-22 |
Time |
17:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2021-09-24 |
|
|
Cont ID |
|
| Sent By |
eshneide |
Date |
2021-09-24 |
Time |
15:08 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2021-09-24 |
Time |
14:42 |
Sent To |
|
|
| Notes |
| 2021-09-24 15:15:51 | FAILED | | | | | | 1) THE POOL ENGINEERING LAYOUT SHOWS A PROPOSED | | | ADDITION (IT APPEARS THAT AN INCOMPLETE PERMIT | | | SUBMITTAL HAS BEEN PRESENTED TO THE CITY THE ADDITION). | | | THE BEAR ISLAND DESIGN GUIDELINES REQUIRE THAT POOLS BE | | | A MINIMUM OF FOUR (4) FEET FROM A STRUCTURE. PROVIDE | | | THE SETBACK DIMENSION FROM THE POOL TO THE ADDITION. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] | | | | | | |
|
|