Plan Review Details - Permit 21080148
Plan Review Stops For Permit 21080148
Review Stop AD ADDRESSING
Rev No 4 Status P Date 2021-09-07 Cont ID  
Sent By cpuell Date 2021-09-07 Time 10:14 Rev Time 0.00
Received By cpuell Date 2021-09-07 Time 10:14 Sent To  
Notes
2021-09-07 10:15:05PROPERTY ADDRESSES CHANGED, UNIT B IS NOW 2511 S DIXIE
 HWY, MERGED UNITS A & C ARE NOW 2513 S DIXIE HWY.

Review Stop AD ADDRESSING
Rev No 3 Status F Date 2021-09-03 Cont ID  
Sent By cpuell Date 2021-09-03 Time 11:20 Rev Time 0.00
Received By cpuell Date 2021-09-03 Time 11:20 Sent To  
Notes
2021-09-03 11:20:40SPOKE WITH OWNERS ASSISTANT, WAITING TO HEAR BACK.
2021-09-02 16:43:57 
  

Review Stop AD ADDRESSING
Rev No 2 Status F Date 2021-08-30 Cont ID  
Sent By cpuell Date 2021-08-30 Time 09:08 Rev Time 0.00
Received By cpuell Date 2021-08-30 Time 09:08 Sent To  
Notes
2021-08-30 09:09:35APPLICANT EMAILED ME TO STATE THAT UNITS A & C WILL BE
 MERGED AND B WILL REMAIN. AS LETTER DESIGNATORS ARE NO
 LONGER ALLOWED THE BUILDING NEEDS TO BE READDRESSED.
 PLEASE CONTACT [email protected] OR CALL 561-805-6659

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2021-08-13 Cont ID  
Sent By cpuell Date 2021-08-13 Time 12:43 Rev Time 0.00
Received By cpuell Date 2021-08-13 Time 12:43 Sent To  
Notes
2021-08-13 12:44:48WILL THE TENANT SPACES OF 2511 S DIXIE HWY A, B, AND C
 BE DEMOLISHES AS WELL TO CREAT A SINGLE SPACE? PLEASE
 RESPOND TO [email protected] OR CALL 561-805-6659.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2021-09-02 Cont ID  
Sent By rmcphers Date 2021-09-02 Time 16:42 Rev Time 0.00
Received By rmcphers Date 2021-09-02 Time 16:42 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-08-17 Cont ID  
Sent By rmcphers Date 2021-08-17 Time 16:26 Rev Time 0.00
Received By rmcphers Date 2021-08-17 Time 16:13 Sent To  
Notes
2021-08-17 16:28:12PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-08-17 Cont ID  
Sent By rmcphers Date 2021-08-17 Time 16:39 Rev Time 0.00
Received By rmcphers Date 2021-08-17 Time 16:13 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2021-08-23 Cont ID  
Sent By jleahy Date 2021-08-23 Time 14:21 Rev Time 0.00
Received By jleahy Date 2021-08-23 Time 14:21 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2021-08-20 Cont ID  
Sent By jleahy Date 2021-08-20 Time 15:27 Rev Time 0.00
Received By jleahy Date 2021-08-20 Time 15:18 Sent To  
Notes
2021-08-20 15:28:27ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 FLORIDA BUILDING CODE 2017 6TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2017 6TH ED
 NFPA 70 2014 EDITION
  
 JAKE LEAHY BN, BU, PX
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 WEST PALM BEACH PLAN REVIEW NEEDS AN ELECTRICAL PERMIT
 APPLICATION FOR APPROVAL. PLEASE EMAIL THE ELECTRICAL
 PERMIT APPLICATION TO [email protected] AND
 [email protected] SO WE RECEIVE IT ALSO.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-09-03 Cont ID  
Sent By cpuell Date 2021-09-03 Time 11:20 Rev Time  
Received By cpuell Date 2021-09-02 Time 15:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-08-20 Cont ID  
Sent By jleahy Date 2021-08-20 Time 15:28 Rev Time 0.00
Received By jleahy Date 2021-08-13 Time 07:41 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2021-08-19 Cont ID  
Sent By medwards Date 2021-08-19 Time 13:31 Rev Time 0.00
Received By medwards Date 2021-08-19 Time 13:25 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-08-17 Cont ID  
Sent By lcrespo Date 2021-08-17 Time 09:30 Rev Time 0.00
Received By lcrespo Date 2021-08-17 Time 09:24 Sent To  
Notes
2021-08-17 09:30:5308/17/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-08-17 Cont ID  
Sent By rmcphers Date 2021-08-17 Time 16:43 Rev Time 0.00
Received By rmcphers Date 2021-08-17 Time 16:42 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved