|
 |
 |
 |
 |
 |
Plan Review Details - Permit 21071567
| Plan Review Stops For Permit 21071567 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2021-08-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2021-08-24 |
Time |
07:25 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2021-08-24 |
Time |
07:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-08-02 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2021-08-02 |
Time |
10:34 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2021-08-02 |
Time |
10:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2021-10-13 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2021-10-13 |
Time |
10:40 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2021-10-06 |
Time |
07:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-09-09 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2021-09-09 |
Time |
09:35 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2021-07-29 |
Time |
15:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2021-08-03 |
|
|
Cont ID |
|
| Sent By |
lcrespo |
Date |
2021-08-03 |
Time |
19:19 |
Rev Time |
0.00 |
| Received By |
lcrespo |
Date |
2021-08-03 |
Time |
19:02 |
Sent To |
|
|
| Notes |
| 2021-08-03 19:19:34 | 08/03/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL) | | | | | | BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE | | | COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN | | | PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES | | | FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, | | | STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT | | | THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK | | | OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM | | | REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES | | | / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO | | | AVOID VOIDING OF THE PERMIT. | | | | | | LUIS A. CRESPO | | | PLUMBING PLAN EXAMINER / INSPECTOR | | | EMAIL: [email protected] OFFICE: 561 805-6720 | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-10-13 |
|
|
Cont ID |
|
| Sent By |
mpeterso |
Date |
2021-10-13 |
Time |
10:39 |
Rev Time |
0.00 |
| Received By |
mpeterso |
Date |
2021-10-13 |
Time |
10:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-07-30 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-07-30 |
Time |
14:45 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-07-30 |
Time |
14:44 |
Sent To |
|
|
| Notes |
| 2021-07-30 14:47:12 | DRAWINGS SUBMITTED FOR THIS PROJECT HAVE A COPY OF A | | | DIGITAL SIGNATURE. PLEASE PROVIDE THE ORIGINAL | | | DIGITALLY SIGNED DRAWINGS OR YOU MAY BRING TO OUR | | | OFFICE ORIGINAL SIGNED AND SEALED PAPER DRAWINGS. | | | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2021-09-08 |
|
|
Cont ID |
|
| Sent By |
rthermid |
Date |
2021-09-08 |
Time |
|
Rev Time |
|
| Received By |
rthermid |
Date |
2021-09-08 |
Time |
|
Sent To |
I |
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |