| Plan Review Stops For Permit 21071117 |
| Review Stop |
ASBESTOS |
CONFIRM RPT SENT TO PBC HEALTH |
| Rev No |
1 |
Status |
N |
Date |
2021-08-03 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-08-03 |
Time |
10:54 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-08-03 |
Time |
10:54 |
Sent To |
|
|
| Notes |
| 2021-08-03 10:55:24 | BUILDOUT IN A NEW BUILDING |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2021-08-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-08-12 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-08-12 |
Time |
13:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2021-08-03 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-08-03 |
Time |
10:55 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-08-03 |
Time |
10:34 |
Sent To |
|
|
| Notes |
| 2021-08-03 11:06:37 | OFFICE BUILDOUT | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected]. | | | CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | 1) DRAWING C - 1 SHOWS THE DESIGN PER THE 2017 FBC - | | | PLEASE CORRECT - SHOULD BE PER THE 2020 FBC. | | | 2) DRAWING 1.0A - THE WALL LEGEND DOES NOT MATCH THE | | | FLOOR PLAN - SHOWS ALL WALLS THE SAME - NEW VERSES | | | EXISTING - PLEASE CLARIFY. | | | 3) DRAWING 1.0A - THE DOOR SCHEDULE IS MISSING DOOR | | | NUMBER 5. | | | 4) PLEASE SHOW THE ADJACENT UNIT OCCUPANCY | | | CLASSIFICATION - TO VERIFY OCCUPANCY SEPARATION PER FBC | | | 508.1 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2021-08-19 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-08-19 |
Time |
16:35 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-08-19 |
Time |
16:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2021-08-02 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-08-02 |
Time |
15:27 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-08-02 |
Time |
15:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2021-08-10 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-08-10 |
Time |
|
Rev Time |
0.00 |
| Received By |
bdolan |
Date |
2021-08-10 |
Time |
12:13 |
Sent To |
|
|
| Notes |
| 2021-08-10 12:13:01 | THE FOLLOWING COMMENTS WERE SUBMITTED BY LT. BRIAN | | | DOLAN, DIVISION OF FIRE PREVENTION, WEST PALM BEACH | | | FIRE RESCUE. | | | | | | PER CITY CODES, ALL WORK IS SUBJECT TO FIELD | | | INSPECTIONS AND APPROVAL. | | | | | | ANY AND ALL WORK ON EXISTING FIRE ALARM SYSTEM (IF | | | PRESENT) SHALL BE DONE BY A FIRE ALARM CONTRACTOR. A | | | SEPARATE SHOP DRAWING COMPLIANT WITH NFPA 72 IS | | | REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY THE | | | FIRE PREVENTION BUREAU PRIOR TO ANY INSTALLATION. ANY | | | ALTERATION OR ADDITION TO EXISTING HVAC SYSTEM SHALL BE | | | UNDER A SEPERATE PERMIT SUBMITTED BY LICENSED | | | CONTRACTOR. | | | | | | LT. BRIAN DOLAN | | | DIVISION OF FIRE PREVENTION | | | 561-804-4752 | | | [email protected] |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2021-07-23 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2021-07-23 |
Time |
|
Rev Time |
0.00 |
| Received By |
bdolan |
Date |
2021-07-23 |
Time |
15:09 |
Sent To |
|
|
| Notes |
| 2021-07-23 15:14:45 | THE FOLLOWING COMMENTS WERE SUBMITTED BY LT. BRIAN | | | DOLAN, DIVISION OF FIRE PREVENTION, WEST PALM BEACH | | | FIRE RESCUE. | | | | | | PER CITY CODES, ALL WORK IS SUBJECT TO FIELD | | | INSPECTIONS AND APPROVAL. | | | | | | ANY AND ALL WORK ON EXISTING FIRE ALARM SYSTEM (IF | | | PRESENT) SHALL BE DONE BY A FIRE ALARM CONTRACTOR. A | | | SEPARATE SHOP DRAWING COMPLIANT WITH NFPA 72 IS | | | REQUIRED TO BE SUBMITTED, REVIEWED AND APPROVED BY THE | | | FIRE PREVENTION BUREAU PRIOR TO ANY INSTALLATION. ANY | | | ALTERATION OR ADDITION TO EXISTING HVAC SYSTEM SHALL BE | | | UNDER A SEPERATE PERMIT SUBMITTED BY LICENSED | | | CONTRACTOR. | | | | | | LT. BRIAN DOLAN | | | DIVISION OF FIRE PREVENTION | | | 561-804-4752 | | | [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
P |
Date |
2021-08-19 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2021-08-19 |
Time |
16:36 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2021-08-05 |
Time |
11:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2021-08-04 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-08-04 |
Time |
09:49 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-07-22 |
Time |
06:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2021-08-19 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-08-19 |
Time |
12:57 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-08-19 |
Time |
12:57 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2021-08-04 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-08-04 |
Time |
09:49 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-08-04 |
Time |
09:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
P |
Date |
2021-08-12 |
|
|
Cont ID |
|
| Sent By |
rmcphers |
Date |
2021-08-12 |
Time |
14:01 |
Rev Time |
0.00 |
| Received By |
rmcphers |
Date |
2021-08-12 |
Time |
14:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
F |
Date |
2021-07-22 |
|
|
Cont ID |
|
| Sent By |
medwards |
Date |
2021-07-22 |
Time |
16:28 |
Rev Time |
0.00 |
| Received By |
medwards |
Date |
2021-07-22 |
Time |
16:28 |
Sent To |
|
|
| Notes |
| 2021-07-22 16:32:00 | PAPER PLANS BROUGHT INTO OUR OFFICE WITH A COPY OF THE | | | DIGITAL SIGNATURE. WE CAN NOT ACCEPT COPIES OF DIGITAL | | | SIGNATURES ( PLEASE CHEK THE DRAWINGS AS THE DESIGNER | | | PUT A STAMP ON EACH DRAWING STATING THIS) PLEASE EITHER | | | SUBMIT THE DIGITAL DRAWINGS INTO THE PROJECT PORTAL OR | | | YOU CAN BRING TO OUR OFFICE THE ORIGINAL SIGNED AND | | | SEALED PAPER DRAWINGS. | | | | | | PER THE WPB AMENDMENTS TO THE FBC, EACH SHEET OF PLAN | | | (INCLUDING THE SUPPORTING DOCUMENTS) IS REQUIRED TO BE | | | SIGNED AND SEALED BY THE PERSON RESPONSIBLE FOR THE | | | DESIGN. A DIGITAL PLAN REQUIRES A DIGITAL SIGNATURE | | | WITH THE PROPER THIRD PARTY VERIFICATION. PROVIDE | | | CORRECTION. ALTERNATIVELY, A SIGNED/SEALED PAPER SET | | | MAY BE SUPPLIED TO THE BUILDING DEPARTMENT WHEN ALL | | | TRADES ARE APPROVED. WPB FBC 107.1; FS 471/481 | | | | | | MICHAEL EDWARDS | | | MECHANICAL EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL. 33401 | | | 561-805-6728 | | | [email protected] | | | |
|
|