Plan Review Details - Permit 21070967
Plan Review Stops For Permit 21070967
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2021-09-15 Cont ID  
Sent By rmcphers Date 2021-09-15 Time 08:25 Rev Time 0.00
Received By rmcphers Date 2021-09-15 Time 08:25 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2021-07-30 Cont ID  
Sent By rmcphers Date 2021-07-30 Time 15:07 Rev Time 0.00
Received By rmcphers Date 2021-07-30 Time 15:07 Sent To  
Notes
2021-07-30 15:07:50PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY.
  
 ADDITIONAL INFORMATION REGARDING ASBESTOS REQUIREMENTS
 CAN BE FOUND ON THEIR WEBSITE:
  
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-09-15 Cont ID  
Sent By rmcphers Date 2021-09-15 Time 08:32 Rev Time 0.00
Received By rmcphers Date 2021-09-15 Time 08:32 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-07-30 Cont ID  
Sent By rmcphers Date 2021-07-30 Time 15:07 Rev Time 0.00
Received By rmcphers Date 2021-07-30 Time 15:07 Sent To  
Notes
2021-07-30 15:11:34CONDO REMODEL
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED -
  
 1) PLEASE SHOW THE LOCATION AND FLOORING TYPE ON THE
 FLOOR PLAN.
  
 2) THE FOLLOWING ACUSTICAL TEST REPORTS ARE REQUIRED:
  
 MANUFACTURER SPEC SHEETS ARE NOT ACCEPTABLE DUE TO
 DISCREPANCIES BETWEEN SPEC SHEETS/BROCHURES AND TEST
 REPORTS FOR SOME MANUFACTURERS (NOT NECESSARILY THE
 MANUFACTURER SELECTED; THIS IS A GENERAL COMMENT)
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90..
 PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723. (DO NOT NEED THIS REPORT IF THE PADDING IS
 ATTACHED TO THE FLOORING)
  
 3). YOU CAN EMAIL ME THE PROPOSED TEST REPORTS TO
 VERIFY THAT THEY ARE TEST REPORTS BEFORE RESUBMITTING
 TO PROJECTDOX ( [email protected] )
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2021-08-02 Cont ID  
Sent By jleahy Date 2021-08-02 Time 13:43 Rev Time 0.00
Received By jleahy Date 2021-08-02 Time 13:41 Sent To  
Notes
2021-08-02 13:43:30NO ELECTRICAL WORK SHOWN ON PLANS JLEAHY

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2021-08-26 Cont ID  
Sent By pleduc Date 2021-08-26 Time   Rev Time 0.00
Received By pleduc Date 2021-08-26 Time 11:38 Sent To  
Notes
2021-08-26 11:44:06FIRE PROVISO:
  
 ENSURE FIRE RATED TENANT SEPARATION WALLS
 ARE MAINTAINED & REPAIRED IF DAMAGED.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-07-23 Cont ID  
Sent By pleduc Date 2021-07-23 Time   Rev Time 0.00
Received By pleduc Date 2021-07-23 Time 10:00 Sent To  
Notes
2021-07-23 10:01:04FIRE PROVISO:
  
 MAINTAIN/REPAIR, IF APPLICABLE, FIRE RATING OF
 TENANT SEPARATION WALL BOARDS IF ALTERED/DAMAGED
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-09-29 Cont ID  
Sent By lmarchan Date 2021-09-29 Time 08:34 Rev Time 0.00
Received By lmarchan Date 2021-09-28 Time 10:10 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-09-15 Cont ID  
Sent By rmcphers Date 2021-09-15 Time 08:34 Rev Time 0.00
Received By rmcphers Date 2021-08-25 Time 09:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-08-02 Cont ID  
Sent By jleahy Date 2021-08-02 Time 13:43 Rev Time 0.00
Received By jleahy Date 2021-07-21 Time 15:37 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-09-10 Cont ID  
Sent By lcrespo Date 2021-09-10 Time 10:59 Rev Time 0.00
Received By lcrespo Date 2021-09-10 Time 10:55 Sent To  
Notes
2021-09-10 10:59:5309/10/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2021-08-06 Cont ID  
Sent By lcrespo Date 2021-07-27 Time 11:58 Rev Time 0.00
Received By lcrespo Date 2021-07-27 Time 11:43 Sent To  
Notes
2021-07-27 11:58:0208/06/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2021-09-29 Cont ID  
Sent By lcrespo Date 2021-09-29 Time 08:28 Rev Time 0.00
Received By lcrespo Date 2021-09-29 Time 08:28 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2021-09-22 Cont ID  
Sent By ccole Date 2021-09-22 Time 16:58 Rev Time 0.00
Received By ccole Date 2021-09-22 Time 16:58 Sent To  
Notes
2021-09-22 17:06:453RD SIGNATURE REVIEW
 PERMIT- 21070967
 9/22/21
  
 RESULTS- DENIED.
  
 1) THE SUBMITTED PAPER PLANS- COV & A1 HAVE COPIED
 ARCHITECT'S SEALS AND SIGNATURES. PLANS DESIGNED BY FL
 LICENSED ARCHITECTS SUBMITTED IN PAPER FORM SHALL BEAR
 THE RAISED OR INK SEAL AND WET SIGNATURE OF THE
 ARCHTECT OF RECORD- FL. STATUTE-481.221 AND SECTION
 61G1-16.002 FLORIDA ADMINISTRATIVE CODE.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2021-09-15 Cont ID  
Sent By rmcphers Date 2021-09-15 Time 08:34 Rev Time 0.00
Received By ccole Date 2021-09-15 Time 08:34 Sent To  
Notes
2021-09-15 08:34:36SIGNATURE REVIEW
 ALL DRAWINGS DO NOT SHOW AS ELECTRONICALLY SIGNED IN
 ADOBE READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX
 NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED BY THE
 ENGINEER OR ARCHITECT TO BE USED IN ELECTRONIC PLAN
 REVIEW. - OR - IF YOUR ARCHITECT OR ENGINEER DOES NOT
 HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN DROP
 OFF THE ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS
 TO THE FRONT DESK IN THE BUILDING DIVISION AT THE CITY
 HALL.
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-07-30 Cont ID  
Sent By rmcphers Date 2021-07-30 Time 15:12 Rev Time 0.00
Received By rmcphers Date 2021-07-30 Time 15:12 Sent To  
Notes
2021-07-30 15:13:14SIGNATURE REVIEW
 DRAWINGS DO NOT SHOW AS ELECTRONICALLY SIGNED IN ADOBE
 READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED
 TO BE DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER
 OR ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. - OR
 - IF YOUR ARCHITECT OR ENGINEER DOES NOT HAVE AN
 ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN DROP OFF THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE
 FRONT DESK IN THE BUILDING DIVISION AT THE CITY HALL.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved