Plan Review Details - Permit 21070651
Plan Review Stops For Permit 21070651
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2021-07-29 Cont ID  
Sent By rmcdouga Date 2021-07-29 Time 09:46 Rev Time 0.00
Received By rmcdouga Date 2021-07-29 Time 09:46 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2021-07-26 Cont ID  
Sent By jleahy Date 2021-07-26 Time 19:11 Rev Time 0.00
Received By jleahy Date 2021-07-26 Time 19:08 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2021-07-21 Cont ID  
Sent By lcrespo Date 2021-07-21 Time 11:19 Rev Time 0.00
Received By lcrespo Date 2021-07-21 Time 11:19 Sent To  
Notes
2021-07-21 11:19:47GAS PLAN REVIEW, A GAS PLAN HAS NOT BEEN INCLUDED IN
 THIS SUBMITTAL PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN
 PERFORMED AT THIS TIME. A SEPARATE GAS PERMIT AND PLANS
 WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE
 RELATED WORK. PROVIDE COMPLETE PLANS AND GAS RISER THAT
 REFLECTS THE ENTIRE SCOPE OF GAS WORK TO BE DONE PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 A SUB GAS PERMIT IS REQUIRED BY A LICENSED CONTRACTOR
 FOR THE SCOPE OF WORK PER THE WPB AMENDMENTS TO THE FBC
 SEC. 105.1.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-08-26 Cont ID  
Sent By lcrespo Date 2021-08-26 Time 16:19 Rev Time 0.00
Received By lcrespo Date 2021-08-17 Time 10:44 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-07-29 Cont ID  
Sent By rmcdouga Date 2021-07-29 Time 09:47 Rev Time 0.00
Received By rmcdouga Date 2021-07-14 Time 13:37 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2021-08-26 Cont ID  
Sent By lcrespo Date 2021-08-26 Time 16:18 Rev Time 0.00
Received By lcrespo Date 2021-08-26 Time 16:14 Sent To  
Notes
2021-08-26 16:18:5508/26/21 REVIEWED FOR CODE COMPLIANCE (PLUMBING/POOL)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS, OR THEIR REPRESENTATIVES
 FROM THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL,
 STATE, AND NATIONAL CODES AND STANDARDS IN EFFECT AT
 THE TIME OF PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK
 OF EVERY ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2021-07-21 Cont ID  
Sent By lcrespo Date 2021-07-21 Time 10:21 Rev Time 0.00
Received By lcrespo Date 2021-07-21 Time 10:21 Sent To  
Notes
2021-07-21 11:13:367/21/21 1ST PLUMBING REVIEW**DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME, AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
 1. SUBMIT TOTAL DYNAMIC HEAD CALCULATIONS FOR THE
 MAXIMUM SYSTEM FLOW. THE MAXIMUM FLOW OF THE PUMP FROM
 ITS PUMP CURVE IS NO LONGER ALLOWED TO BE USED IN
 DETERMINING THE MAXIMUM SYSTEM FLOW RATE PER
 ANSI/APSP/ICC 7 - 2015 SECS. 4.4.9, 4.4.9.1. THE 2015
 EDITION ADDRESSES THE FLOW RATE IN GALLONS PER MINUTE
 (GPM). IT REQUIRES THAT THE MAXIMUM SYSTEM FLOW RATE
 DOES NOT EXCEED THE LISTED MAXIMUM FLOW RATE OF THE
 SUCTION OUTLET FITTING ASSEMBLY (DRAIN COVER). THE TDH
 CALCULATIONS MUST INCLUDE ALL THE SYSTEM COMPONENTS,
 INCLUDING SUCTION AND RETURN PIPING, FITTINGS, VALVES,
 HEATER, FILTER, AND CHLORINATOR. ALL SYSTEM COMPONENTS
 EXCEPT THE PUMP.
  
 2. SUBMIT THE POOL PUMP CURVE. IDENTIFY ON THE PUMP
 CURVE WHICH CURVE KEY IS SPECIFIC TO THE PUMP BEING
 INSTALLED ON THIS POOL. IT IS NEEDED TO CONFIRM THE
 MAXIMUM SYSTEM FLOW FROM THE TDH CALCULATIONS PER THE
 ANSI/APSP/ICC 7 - 2015 SECS. 4.4.9, 4.4.9.1
  
 3. HEATED SWIMMING POOLS AND INGROUND PERMANENTLY
 INSTALLED SPAS SHALL BE EQUIPPED WITH A VAPOR-RETARDANT
 COVER ON OR AT THE WATER SURFACE OR A LIQUID COVER OR
 OTHER MEANS PROVEN TO REDUCE HEAT LOSS PER THE 2020
 FBC- ENERGY- SEC. R 403.10.3. WOULD YOU PLEASE PLACE A
 NOTE ON THE PLANS?
  
 4. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE MAIN
 DRAIN, THE PUMP, HEATER, FILTER, AND CHLORINATOR PER
 THE WPB AMENDMENTS TO FBC SEC. 107.2.1.
  
 5. ALL GAS AND SPA HEATERS SHALL HAVE A MINIMUM THERMAL
 EFFICIENCY OF 82 % FOR HEATERS MANUFACTURED ON OR AFTER
 APRIL 16, 2013, WHEN TESTED IN ACCORDANCE WITH ANSI Z
 21.56. POOL HEATERS FIRED BY NATURAL OR LP GAS SHALL
 NOT HAVE CONTINUOUSLY BURNING PILOT LIGHTS PER THE 2020
 FBC-ENERGY ? SEC. R403.10.4
  
  
 WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY NECESSARY PAGES.
 A TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER, WITH A DESCRIPTION OF THE REVISION,
 MADE, IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGES CAN BE FOUND WILL HELP EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 HTTPS://CODES.ICCSAFE.ORG/CODES/FLORIDA
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER / INSPECTOR
 EMAIL: [email protected] OFFICE: 561 805-6720
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2021-08-26 Cont ID  
Sent By lcrespo Date 2021-08-26 Time 16:19 Rev Time 0.00
Received By lcrespo Date 2021-08-26 Time 16:19 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-07-29 Cont ID  
Sent By rmcdouga Date 2021-07-29 Time 09:46 Rev Time 0.00
Received By rmcdouga Date 2021-07-29 Time 09:46 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-07-28 Cont ID  
Sent By rthermid Date 2021-07-28 Time   Rev Time  
Received By rthermid Date 2021-07-28 Time   Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved