Plan Review Details - Permit 21070569
Plan Review Stops For Permit 21070569
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-10-04 Cont ID  
Sent By rmcphers Date 2021-10-04 Time 15:26 Rev Time 0.00
Received By rmcphers Date 2021-10-04 Time 15:26 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-07-29 Cont ID  
Sent By rmcphers Date 2021-07-29 Time 13:02 Rev Time 0.00
Received By rmcphers Date 2021-07-29 Time 12:43 Sent To  
Notes
2021-07-29 13:01:59PLAY GROUND EQUIPMENT
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED -
 1) DRAWING 400-2021-194 SHEET 1 - SHOWS THE 2017 FBC
 USED FOR DESIGN - SHOULD BE THE 2020 FBC - PLEASE
 CORRECT.
 2) PLEASE PROVIDE A DRAWING SHOWING THE FOUNDATION
 REQUIRED FOR THE 40 X 40 CANOPY.
 3) PLEASE SHOW THE ACCESSIBLE ROUTE TO THE PLAY GROUND
 FROM THE PARKING AREA AND EXTERIOR SIDEWALKS TO COMPLY
 WITH FBC ACCESSIBILITY 206.2.17 PLAY AREAS.
 PLAY AREAS SHALL PROVIDE ACCESSIBLE ROUTES IN
 ACCORDANCE WITH FBC 206.2.1 SITE ARRIVAL POINTS.
 AT LEAST ONE ACCESSIBLE ROUTE SHALL BE PROVIDED WITHIN
 THE SITE FROM ACCESSIBLE PARKING SPACES AND ACCESSIBLE
 PASSENGER LOADING ZONES; PUBLIC STREETS AND SIDEWALKS;
 AND PUBLIC TRANSPORTATION STOPS TO THE ACCESSIBLE
 BUILDING OR FACILITY ENTRANCE THEY SERVE. FBC 206.2.17.
 ACCESSIBLE ROUTES SERVING PLAY AREAS SHALL COMPLY WITH
 CHAPTER 4 EXCEPT AS MODIFIED BY 1008.2.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2021-07-15 Cont ID  
Sent By pleduc Date 2021-07-15 Time   Rev Time 0.00
Received By pleduc Date 2021-07-15 Time 14:00 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2021-07-23 Cont ID  
Sent By aaponte Date 2021-07-23 Time 16:29 Rev Time 0.00
Received By aaponte Date 2021-07-23 Time 16:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2021-10-07 Cont ID  
Sent By rmcphers Date 2021-10-07 Time 15:47 Rev Time 0.00
Received By rmcphers Date 2021-10-06 Time 15:11 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-10-04 Cont ID  
Sent By rmcphers Date 2021-10-04 Time 15:50 Rev Time 0.00
Received By rmcphers Date 2021-09-29 Time 07:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-07-29 Cont ID  
Sent By rmcphers Date 2021-07-29 Time 13:11 Rev Time 0.00
Received By rmcphers Date 2021-07-14 Time 14:25 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-10-07 Cont ID  
Sent By rmcphers Date 2021-10-07 Time 15:47 Rev Time 0.00
Received By rmcphers Date 2021-10-07 Time 15:47 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2021-10-04 Cont ID  
Sent By rmcphers Date 2021-10-04 Time 15:26 Rev Time 0.00
Received By rmcphers Date 2021-10-04 Time 15:26 Sent To  
Notes
2021-10-04 15:30:45SIGNATURE REVIEW
  
 DRAWINGS BELOW AS LABELED IN PROJECTDOX - DO NOT SHOW
 AS DIGITALLY SIGNED -
 001- 1- SHADE COVER SHEET.PDF V2
 003- 2- SHADE GENERAL VIEWS.PDF V2
 006-3-SHADE FOUNDATION.PDF V2
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. (A
 CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED
 A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF
 E-SIGNATURE).- OR - IF YOUR ARCHITECT OR ENGINEER DOES
 NOT HAVE AN ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN
 DROP OFF THE ORIGINAL SIGNED AND SEALED
 DRAWINGS/DOCUMENTS TO THE FRONT DESK IN THE BUILDING
 DIVISION AT THE CITY HALL.
  
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected].
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2021-07-29 Cont ID  
Sent By rmcphers Date 2021-07-29 Time 13:11 Rev Time 0.00
Received By rmcphers Date 2021-07-29 Time 13:11 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2021-10-04 Cont ID  
Sent By aaponte Date 2021-10-04 Time 15:47 Rev Time 0.00
Received By aaponte Date 2021-10-04 Time 15:47 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2021-07-23 Cont ID  
Sent By aaponte Date 2021-07-23 Time 16:29 Rev Time 0.00
Received By aaponte Date 2021-07-23 Time 16:29 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved