| 2021-08-26 11:24:52 | CONCRETE REPAIRS |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected]. |
| | CODE USED FOR REVIEW - 2020 FBC WITH 2017 WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | 1) PLEASE PROVIDE THE RESUMES AS NOTED IN THE SPECIAL |
| | INSPECTOR AGREEMENT |
| | |
| | ALL SPECIAL INSPECTORS ARE REQUIRED TO SUBMIT A RESUME |
| | OF INSPECTION EXPERIENCE ON |
| | PREVIOUS PROJECTS. FOR EACH THRESHOLD BUILDING, A |
| | NOTICE SHALL BE FILED WITH THE |
| | ENFORCING AGENCY, BEARING THE NAME, ADDRESS, SIGNATURE, |
| | DATE AND SEAL OF THE |
| | THRESHOLD BUILDING INSPECTOR, CERTIFYING THAT THE |
| | THRESHOLD BUILDING INSPECTOR IS |
| | COMPETENT TO PROVIDE THE SERVICES FOR THE SPECIFIC TYPE |
| | OF STRUCTURE. THE RESUME |
| | MUST BE ACCOMPANIED BY ALL CERTIFICATES AS SPECIFIED |
| | HEREIN. THE BUILDING OFFICIAL OR |
| | HIS DESIGNEE WILL REVIEW THE RESUME. AFTER THE RESUME |
| | IS REVIEWED, AN INTERVIEW |
| | APPOINTMENT WILL BE SCHEDULED IF DEEMED NECESSARY. |
| | |
| | 2) IT APPEARS THAT YOU HAVE AN OLD COPY OF THE SPECIAL |
| | INSPECTOR AGREEMENT - WHICH IS OK BUT THE SPECIAL |
| | THRESHOLD INSPECTOR NEEDS TO ADD HIS SEAL TO THE |
| | SIGNATURE AS NOTED ABOVE. |
| | |
| | FYI - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO |
| | BE DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR |
| | ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. - OR - |
| | IF YOUR ARCHITECT OR ENGINEER DOES NOT HAVE AN |
| | ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN DROP OFF THE |
| | ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE |
| | FRONT DESK IN THE BUILDING DIVISION AT THE CITY HALL. |
| | |
| | |