| 2021-07-23 13:50:57 | PLAN REVIEW BUILDING |
| | |
| | CHRISTOPHER S. THROOP, C.B.O., CFM |
| | PLANS EXAMINER II PX3169/SFP306 |
| | INSPECTOR BN4338 |
| | BUILDING OFFICIAL BU1635 |
| | ASFPM CERTIFIED FLOODPLAIN MANAGER US-21-11935 |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | 2017 NEC |
| | |
| | 1ST REVIEW |
| | |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | |
| | NOTICE: SCOPE OF WORK (SOW) IS TO RE-LOCATE AN EXISTING |
| | METAL SHED. I CANNOT LOCATE A PERMIT RECORD OF THIS |
| | SHED. |
| | PROVIDE THE FOLLOWING: |
| | |
| | 1. PROVIDE A SITE PLAN. YOU MAY USE A COPY OF YOUR |
| | SURVEY. SHOW LOCATION OF PROPOSED SHED WITH DIMENSIONS |
| | TO SIDE AND REAR PROPERTY LINES. PROVIDED 7-23-21 |
| | 2. PROVIDE THE STATE APPROVED PRODUCT APPROVAL PER |
| | CHPT. 553, PART 1 FOR YOUR SHED. (YOUR SUPPLIER SHOULD |
| | PROVIDE THIS) |
| | 3. THE PRODUCT APPROVAL SHOULD INCLUDE EITHER A |
| | FOUNDATION DETAIL OR A TIE-DOWN DETAIL. IF IT DOESN?T, |
| | YOU WILL HAVE TO PROVIDE A DETAIL FOR THE SHED?S |
| | FOUNDATION/TIE DOWN. |
| | 4. IF YOU WILL BE AN OWNER/BUILDER, YOU WILL HAVE TO |
| | SIGN THIS FORM IN FRONT OF OUR NOTARY AT CITY HALL. |
| | COMPLETE 7-23-21 |
| | 5. IF ELECTRIC IS INSTALLED, PROVIDE AN ELECTRICAL PLAN |
| | AND AN ELECTRICAL SUB-PERMIT. |
| | |
| | |
| | VALUE |
| | |
| | CITY OF WPB CHPT109.3 BUILDING PERMIT VALUATIONS. |
| | |
| | 1A. VALUE APPEARS LOW FOR THE PROPOSED SCOPE OF WORK. |
| | 1B. THE PERMIT VALUATION AND PERMIT FEE MUST BE |
| | COMMENSURATE WITH THE VALUATION AND FEE THAT A LICENSED |
| | CONTRACTOR WOULD PROVIDE. THIS INCLUDES ALL LABOR, |
| | MATERIALS AND RENTALS OF EQUIPMENT TO PERFORM THE SCOPE |
| | OF WORK. |
| | 1C. YOU MAY PROVIDE A COPY OF THE CONTRACT SIGNED BY |
| | THE OWNER OR A LIST OF LABOR, MATERIALS AND EQUIPMENT |
| | RENTAL TO VERIFY VALUE. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL |
| | |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| | |
| | |