Plan Review Details - Permit 21070084
Plan Review Stops For Permit 21070084
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2021-09-07 Cont ID  
Sent By ccole Date 2021-09-07 Time 10:39 Rev Time 0.00
Received By ccole Date 2021-09-07 Time 10:31 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2021-08-31 Cont ID  
Sent By rmcphers Date 2021-08-31 Time 10:38 Rev Time 0.00
Received By rmcphers Date 2021-08-31 Time 10:38 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2021-07-27 Cont ID  
Sent By jbrooks Date 2021-07-27 Time 08:46 Rev Time 0.00
Received By jbrooks Date 2021-07-27 Time 07:38 Sent To  
Notes
2021-07-27 08:47:18JONATHAN BROOKS JR.
 BUILDING PLANS EXAMINER
 WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM
 PHONE (561) 805-6656
 EMAIL: [email protected]
  
 1ST REVIEW: FBC 2020 7TH EDITION
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC
 RESULTS: DENIED
 ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT
 TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT
 CITY HALL, OR EMAIL [email protected] AND REQUEST
 THAT IT BE CONVERTED TO PROJECTDOX.
  
 1. FBC B 107.2.1. CITY OF WEST PALM BEACH IS NOT
 LOCATED IN A HVHZ AND HAS NOT ADOPTED RAS 150.
 2. PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT
 APPROVALS/NOA'S FOR THE PROPOSED FLAT ROOF SYSTEM TO BE
 USED. INCLUDE COVER PAGE, EVALUATION REPORTS AND
 INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL
 APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY
 IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS
 AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT
 APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING.
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2021-09-14 Cont ID  
Sent By cthroop Date 2021-09-14 Time 11:21 Rev Time 0.00
Received By cthroop Date 2021-09-10 Time 09:43 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date   Cont ID  
Sent By   Date 2021-09-07 Time   Rev Time 0.00
Received By aoliver Date 2021-09-01 Time 09:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2021-08-31 Cont ID  
Sent By rmcphers Date 2021-08-31 Time 10:43 Rev Time 0.00
Received By rmcphers Date 2021-08-27 Time 07:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2021-07-27 Cont ID  
Sent By jbrooks Date 2021-07-27 Time 08:47 Rev Time 0.00
Received By jbrooks Date 2021-07-26 Time 13:03 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2021-09-14 Cont ID  
Sent By cthroop Date 2021-09-14 Time 11:21 Rev Time 0.00
Received By cthroop Date 2021-09-14 Time 11:18 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2021-09-07 Cont ID  
Sent By ccole Date 2021-09-07 Time 10:39 Rev Time 0.00
Received By ccole Date 2021-09-07 Time 10:31 Sent To  
Notes
2021-09-07 10:40:54SIGNATURE REVIEW COMMENT FROM THE 1ST REVIEW LISTED
 BELOW STILL EXISTS. PLEASE COMPLY.
  
 ROOFING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED -
 SIGNATURE REVIEW
 DOCUMENT LABELED "ENGINEER FASTENER CALCULATION
 REPORT.PDF" IN PROJECTDOX DOES NOT SHOW AS
 ELECTRONICALLY SIGNED IN ADOBE READER - SIGNED AND
 SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. - OR -
 IF YOUR ARCHITECT OR ENGINEER DOES NOT HAVE AN
 ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN DROP OFF THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE
 FRONT DESK IN THE BUILDING DIVISION AT THE CITY HALL.
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2021-08-31 Cont ID  
Sent By rmcphers Date 2021-08-31 Time 10:38 Rev Time 0.00
Received By rmcphers Date 2021-08-31 Time 10:38 Sent To  
Notes
2021-08-31 10:42:43ROOFING
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENTS
  
 CORRECTIONS NEEDED -
 SIGNATURE REVIEW
 DOCUMENT LABELED "ENGINEER FASTENER CALCULATION
 REPORT.PDF" IN PROJECTDOX DOES NOT SHOW AS
 ELECTRONICALLY SIGNED IN ADOBE READER - SIGNED AND
 SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED BY THE ENGINEER OR
 ARCHITECT TO BE USED IN ELECTRONIC PLAN REVIEW. - OR -
 IF YOUR ARCHITECT OR ENGINEER DOES NOT HAVE AN
 ELECTRONIC OR DIGITAL SIGNATURE - YOU CAN DROP OFF THE
 ORIGINAL SIGNED AND SEALED DRAWINGS/DOCUMENTS TO THE
 FRONT DESK IN THE BUILDING DIVISION AT THE CITY HALL.
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved